Loading...
HomeSearchMy WebLinkAbout1_SubdivisionPreliminaryPlat10_Engineering Report Appendix A11_Engineering Report Appendix B12_Engineering Report Appendix C13_Engineering Report Appendix D14_Corrosion Avg Calcs & Table15_NRCS Soil Report16.1_Norton Phase 5 Geotechnical Investigation Report16_Norton Ranch Geo- 77 Acres - Report17_Norton Ranch - 77 Acres - Corrosivity Tests18.1_Mayfly Groundwater Monitoring data18.2_Norton Phase 4 Groundwater Data18.3_Norton Phase 5 Groundwater Data18_Groundwater Monitoring data19.1_Mayfly Groundwater Monitoring graph19.2_Groundwater Monitoring Map19.3_Norton Phase 4 Groundwater Well Map19.4_Norton Phase 5 Groundwater Well Map19_Groundwater Monitoring graph2_NoticingChecklistN120_UF Phase 1_Traffic Memo20_Urban + Farm Subdivision Phase 1_Traffic Memo21_ NWE Engineer Correspondance21_ PreApplication Comment Response22.1_Park Comment Response22_ Parkland Calculation22_Parkland Calculation23_Park Cost Estimate24.1_Articles of Incorporation for Urban + Farm 02092224_Bylaws for Urban +Farm25_Declaration for Urban Farm26_Notification Letter - Planning27_ConcurrentConstruction Form28_Stormwater Maintenance Plan29_Response to Comments3_Adjoiner Labels List NOT CONTIGUOUS3_NOTICE List30_15 in. Storm Pipe As-built31.1_Joint Trench Agreement - Final31_Joint Trench Agreement32_Urban + Farm Phase 1 WaterCAD33.0_Utiltiy Provider Email- UF Phase 133.1_Utiltiy Provider Response- UF Phase 133.2_Utiltiy Provider Response- UF Phase 134.0_Urban + Farm Commercial Subdivision_TIS35.0_Park Landscape Cost Estimate_202212144_Adjoiner Labels List4_UF Phase I Sub PA Narrative5_CoB Waiver Request- Cover Letter6.1_CoB Pre App Waiver Approvals6_CoB Waiver Request Preliminary Plat7.1_ MFE Cover Letter7_MFEformfillable8_WEED MGMT PLAN9.1_Phase 5 Storm Pond Email9.2_Fire Hydrant Flow Test- CoB9.3_Fire Hydrant Flow Curve- CoB9.4_Norton Ranch Lift Station - Engineering Design Evaluation9.5_ Overall Sewer Main Analysis-NRLS9_Engineering Report