Loading...
HomeMy WebLinkAbout23_Park Cost EstimateUrban + Farms Phase 1 Item Description Unit Price Unit Qty Cost A-1 Rough Grading 20.00 CY 240 4,800.00 A-2 Finish Grading 1.25 CY 120 150.00 C-1 Area concrete 10.00 SF 48 480.00 C-2 Asphalt Trail 4.00 SF 2,612 10,448.00 D-1 Benches 3,500.00 EA 1 3,500.00 D-3 Boulders 2 to 3' dia 300.00 EA 1 300.00 D-4 Boulders 4 to 6' dia 650.00 EA 3 1,950.00 Irrigation E-1 Spray - Turf 1.80 SF 951 1,711.80 E-2 Spray - Meadow 1.18 SF 2,887 3,406.66 E-3 Drip - Trees in Grass 51.62 EA 7 361.34 F-1 Prep & Place Exst Topsoil-Grass 0.23 SF 3,838 882.74 F-3 Turf Grass - Seeded 0.12 SF 951 114.12 F-4 Meadow Grass - Seeded 0.12 SF 2,887 346.44 F-5 Edging - Shovel cut 0.85 LF 87 73.95 F-6 Trees - Deciduous 500.00 EA 7 3,500.00 I-1 Pedestrian Lighting 4,000.00 EA 7 28,000.00 I-2 Fixture Feeder Wire & Conduit 5.00 LF 260 1,300.00 I-3 Fixture Feeder Trenching, Tracer Wire 1.20 LF 260 312.00 56,687.05 PA 17 & 26 Linear Park Grading SUBTOTAL Pavement - Include Subgrade Prep & Base 5,479.80 4,950.00SUBTOTAL 10,928.00 5,750.00 Site Amenities SUBTOTAL SUBTOTAL 4,917.25 Planting Subtotal 29,612.00SUBTOTAL Light Fixtures SUBTOTAL