Loading...
HomeSearchMy WebLinkAbout001 City & County Approval_Flycatcher Drive_2022.10.13001 Norton East Ranch Phase 5B - Final Plat Page 1001 Notification Letter - Planning001 Phase 5B Annexation002 Norton East Ranch Phase 5B - Final Plat Page 2002 CILWR Verification (Phase 5A and 5B)002 Cover Page002 NWO-2007-01084-APJDletter003 Norton East Ranch Phase 5B - Final Plat Page 3003 NWO-2007-01084_Appeals004 Norton East Ranch Phase 5B - Final Plat Page 4004 Jurisdictional Report Email Correspondence004 Narrative Response to Coniditions of Approval005 Deed Restriction005 Norton Ranch Phase 5 Signed FOF005 Park Landscape Plan 1006 Groundwater Influence Letter - 2022 Update006 Park Landscape Plan 2006 Waiver of SIDs #2747250007 Appendix A - Drain Tile Mainenance Plan007 Laurel Parkway Easement - #2269586007 Park Landscape Plan 3008 Appendix B - Stormwater Maintenance Plan008 Laurel Parkway Easement - #2747245008 Park Landscape Plan 4009 2022-040EP009 Park Landscape Plan 5009 Phase 6 Stormwater Easement - #2747246010 Eighth Declaration of Annexation to CCRs (Draft)010 NWO-2007-01084_Verify_20221901010 Park Landscape Plan 6011 310 Permit011 Covenants Conditions and Restrictions (Existing)012 CIL Water Rights Calculation_Phase 5B012 MDEQ_WQC_2017_NWP013 Infrastructure Improvements Agreement Set (Signed)013 Street Name Confirmation_Phase 5B - City and County014 Public Stormwater Easement (Revised 2021-01-21) Signed014 Quitclaim Deed - Park 5B, 5D, 5E015 Norton Ranch Lift Station Documentation015 Park 5B, 5D, 5E - Realty Transfer Certificate (DRAFT)016 CILWR Info016 Quitclaim Deed - Open Space 5B and 5C017 City of Bozeman Email Confirmation_2022.08.17017 Water and Sewer Main Extension DEQ App. Norton RanchPhase5A&5B018 MFE Norton Ranch 5A & 5B018 Waiver of SID019 Covenants - (2011-02-15) Original019 Norton Ranch Lift Station Scenario 1 - Capacity Letter020 Covenants - (2011-10-14) 1st Amendment020 Norton Ranch Phase 5A and 5B COB Infrastructure Approval021 Covenants - (2013-06-27) 1st Amendment021 Sidewalks Improvement Agreement Set (Signed)022 Covenants - (2014-05-12) 2nd Amendment022 Landscaping Improvement Agreement Set (Signed)023 Covenants - (2015-07-01) 3rd Amendment023 Infrastructure Improvement Agreement Set (Signed)024 Army Corps Approval Draintile024 Covenants - (2015-07-08) 4th Amendment025 Covenants - (2016-12-06) 5th Amendment025 Drain Tile - Maintenance Plan026 Covenants - (2017-07-05) 5th Amendment026 Drain Tile - Construction Plans027 Conservation Easement [West]027 Covenants - (2018-04-15) 6th Amendment028 Conservation Easement Correction [West]028 Covenants - (2020-04-22) 7th Amendment029 Soil Corrosivity Testing029 Wetland covenant of dedication030 Quitclaim Deed030 Stormwater Monitoring Letter031 Public Stormwater Easement and Agreement031 Stormwater Monitoring Results Figure Ph. 3032 Covenant of Dedication032 Public Street and Utility Easement033 City of Bozeman Zoning Email Clarification_2022.08.25033 Resolution 5377-Creation of SILD 769 - Norton Phase 5034 Narrative Response to C.O.A._Phase 5B034 Phase 3Groundwater Influence Letter035 Detention Pond Outfall Permitting035 Master Park Plan Write-Up036 NortonRanchPH5MOUapvd037 N1 and City Adjoiners - Norton East Ranch Phase 5038 Groundwater Influence Letter - 2022 UpdateCovenants - (2022.10.31) 8th Amendment (5A&5B Annexation)Phase 5B Annexation