Loading...
HomeSearchMy WebLinkAbout001 G0.1 UDC COMPLIANCE COVER SHEET002 G0.2 PERSPECTIVE VIEWS003 C0.1 GENERAL NOTES004 C0.2 EXISTING SITE FEATURES005 C0.3 CONSTRUCTION TRAFFIC ROUTE006 C0.4 CMP- SITE PREP007 C0.5 CONSTRUCTION MGMT PLAN008 C1.1 SITE PLAN009 C2.1 UTILITY PLAN010 C2.2 FIRE SERVICE PLAN011 C3.1 Grading Overview012 C3.2 GRADING&DRAINAGE-SW013 C3.3 GRADING&DRAINAGE-NW014 C3.4 GRADING&DRAINAGE-NORTH015 C3.5 GRADING&DRAINAGE- EAST016 C3.6 GRADING&DRAINAGE- SOUTH017 C5.1 DTLS-EROSION&SEDIMENT CTRL018 C5.2 DTLS-CONC, ASPHALT&CURB019 C5.3 DTLS-SIDEWALKS AND RAMPS020 C5.4 DETAILS - SEWER021 C5.5 DETAILS - WATER022 C5.6 DETAILS - STORM023 LANDSCAPE PLAN - OVERALL024 LANDSCAPE PLAN - WEST025 LANDSCAPE PLAN - EAST026 LANDSCAPE DETAILS027 IRRIGATION PLAN - OVERALL028 IRRIGATION PLAN - WEST029 IRRIGATION PLAN - EAST030 IRRIGATION DETAILS031 A1.2 ARCHITECTURAL SITE DETAILS032 A2.1 LEVEL 1 OVERALL FLOOR PLAN033 A2.2 LEVEL 2 FLOOR PLAN034 A2.3 ROOF PLAN WEST035 A2.4 ROOF PLAN EAST036 A2.5 ROOF DETAILS037 A4.1 EXTERIOR ELEVATIONS038 E0.0 ELEC LEGEND&GENERAL NOTES039 E1.1 ELECTRICAL SITE PLAN040 E1.2 SITE PHOTOMETRICS PLAN041 E1.41 ELECTRICAL ELEVATIONS