Loading...
HomeMy WebLinkAbout020 C5.4 DETAILS - SEWER1/4" BELOW TOP OFNEW PAVEMENT SURFACE3'-0"(MIN)HEAVY DUTY MONUMENT BOX, SIMILARTO CAIRD ENG. NO. 50608-1PAVING & GRAVELAS REQUIREDSEAL JOINT WITH RAM-NEK8" x 3' ROUNDCONCRETE SLABSLIP HUB TO THREADED ADAPTERTHREADED PLUGFROSTEXPANSIONSLEEVECLEANOUT PIPE -4" Ø PVC45° BENDNON-SHRINKBACKFILLEND OFTRENCHVERIFY PIPESIZE PER PLANDIMENSIONSEND OF LINE CLEANOUT(IF REQUIRED) USE PLUG8"6" MIN12" MAX4'-0"2" THICK SANDCUSHIONGRANULAR BEDDINGMATERIAL (TYP)WATER ORSEWER LINETRENCH BOTTOMTRENCH WALLTRENCH WALL ALT. "B" INSTALLATION(TOP & BOTH SIDES):4" THICK INSULATIONBOARD - 8' MIN LENGTHALONG WATER OR SEWER LINEALT. "A" (TOP ONLY)INSTALLATION (TOP ONLY):4" THICK x 8' WIDEINSULATION BOARDCENTERED OVER WATEROR SEWER LINE - 8' MINLENGTH ALONG WATEROR SEWER LINE*FOR CULVERT CROSSINGS,PROVIDE 18" MIN VERTICALSEPARATION BETWEENCULVERT AND WATEROR SEWER LINE*NOTES:1.INSTALL INSULATION OVER ALL WATER AND/OR SEWER LINES WITH LESS THAN 6'-6" COVER TO FINISHED GRADE ORWITHIN 2' BELOW A CULVERT. NOTIFY ENGINEER PRIOR TO PLACING INSULATION.2.INSTALL INSULATION IN TWO, 2" THICK LAYERS. ROTATE ORIENTATION OR STAGGER JOINTS TO PROVIDE 2' MINOVERLAP BETWEEN JOINTS. INSULATION SHALL EXTEND A MINIMUM OF 4' BEYOND THE OUTER WALLS OF THECULVERT.3.INSULATION BOARD SHALL BE 2" THICK EXTRUDED POLYSTYRENE INSULATION BOARD PER AASHTO M230-70.4.SAND MAY BE USED TO PROVIDE THE BASE. INSULATION SHALL BE COVERED WITH 12" OF SAND OR OTHER OTHERSUITABLE GRANULAR BASE PRIOR TO COMPACTION OR ADDITIONAL BACKFILLING.issue dateproject #phasesheet project ownerrevisiondate2/24/2022 1:56:20 PM C5.4DETAILS - SEWER 21087.00UDC SITESUBMISSIONAURORA TECHNOLOGIES INNOVATION CAMPUS PARTNERS N:\5755\008-Aurora\ACAD\Sheets\5755.008-C5.X-Details.dwg PVC CLEANOUT2"3" MIN.GRADEPVC CLEANOUTWITH THREADED PLUG10" ROUND VALVE BOX,GREEN, WITH LOCKING LID,CENTERED OVER CLEANOUTGRAVEL BEDDING& BACKFILL2"2"FINISHED2SANITARY SEWER & STORM DRAIN CLEANOUT DETAILNOT TO SCALE3CLEANOUT BOX - LANDSCAPED AREASNOT TO SCALE1PIPE INSULATIONNOT TO SCALEengineers surveyors planners scientists MorrisonMaierle 03/25/20221 6/15/2203.25.2022