Loading...
HomeMy WebLinkAbout15- Stormwater Permit Less Than One AcreStorm Water Management Regulations For Land Disturbance Sites LESS Than One Acre Storm Water Management is increasingly important for the purpose of maintaining clean water and preserving waterbodies such as streams, rivers, and lakes. The City of Bozeman’s Storm Water Management Ordinance #1763 went into effect April 22, 2010, as mandated under the Federal Clean W Act (CWA) and the Montana Pollution Discharge Elimination (MPDES) regulation. These regulati designed to improve water quality in waterbodies by reducing the amount of pollutants that storm water collects and carries into storm conveyance systems. ater ons are ment ecklist; o l ions iolation and Enforcement ill be issued to the Responsible Party. The notice will state the nature of 1763 0. Permit and Fee Owners/operators of construction sites considered a Sketch Plan or higher are required to apply for a City of Bozeman Storm Water Management Permit (SMP). The SMP requires submittals of an application form and a Storm Water Management Plan in compliance with the City of Bozeman’s Storm Water Manage Ordinance #1763. The Storm Water Management Plan shall contain the following items: 1. A completed Storm Water Management Plan checklist which outlines the project site’s Best Management Practices (BMPs); 2. A short narrative explaining how the permittee(s) will implement BMPs described on the ch and 3. A map of the construction site showing the locations of the BMPs. Inspection and Review Site plan review and inspection programs aid in compliance and enforcement and provide an opportunity for guidance and education. The City will perform a site plan review of potential water quality impacts at the time the SMP is submitted and will conduct regular inspections of the construction site. The permittee(s) will be required to perform site inspections every 14 days and after major storm events t ensure all BMPs have been constructed and are functioning properly. The purpose of such inspections wil be to determine the overall effectiveness of the control plan and the possible need for BMPs. All inspect shall be documented in written form, kept on the project site, and made available for review by the City. V If any violation is found, a notice w the alleged violation(s), the action required to fix the violation(s), and a time limit to remedy the violation(s). Any person, firm, or corporation violating any of the provisions or terms of Ordinance # of the City of Bozeman may be subject to penalties as a municipal infraction pursuant to Title 14 of the Bozeman Municipal Code. If you have any questions contact the City Engineering Office at 406-528-228 City of Bozeman, Montana Storm Water Management Permit Application Permit Number______________ Date Submitted _____________ Final Stabilization Date _______ Engineering Department P.O. Box 1230 Bozeman, Montana 59771 406‐582‐2280  Note: This permit is separate from any permits required by the Montana Department of Environmental Quality. A State Storm water Construction Permit is required for all land disturbance activities equal to or greater than one (1) acre or for land disturbance less than one (1) acre that is part of a larger common plan of development or sale that would disturb one (1) acre or more. (1) Contact Information: Project Owner Contact Person: Company: Mailing Address: State: Zip: Phone: Email: Fax: Cell Phone: Contractor Contact Person: Company: Mailing Address: State: Zip: Phone: Email: Fax: Cell Phone: Engineer Contact Person: Company: Mailing Address: State: Zip: Phone: Email: Fax: Cell Phone: (2) Project Information Project Address: Lot Number: Subdivision (if applicable): Project Size: (Land Disturbance) Project type: (Planning Application) (3) Project Information Check the appropriate box(es) or provide a brief description that indicates the general nature of the construction activities: Single Family Residential Multi-Family Residential Utility Commercial/Industrial Highway/Road Other (describe): _____________________________ Description of proposed work: City of Bozeman, Montana Storm Water Management Permit Application Permit Number______________ Date Submitted _____________ Final Stabilization Date _______ (4) Project Schedule Start Date: Completion Date: Final Stabilization Date: (5) Waterbodies and Storm Conveyance Systems List Waterbodies within 200’ of project Streams: Lakes: Wetlands: Rivers: Sloughs: Other: List Storm Conveyance Systems within 100’ of project Ditches: Swales: Detention Facilities: Storm Drain Inlets: Pipe Inlets/Outlets: Gutter: (6) Acknowledgement Certificate: I certify that I am the Owner or Owner’s authorized agent. If acting as an authorized agent, I further certify that I am authorized to act as the Owner’s agent regarding the property at the above-referenced address for the purpose of filing applications for decisions, permits or review under the City of Bozeman Ordinance ---- and have full power and authority to perform on behalf of the Owner all acts required to enable the City to process and review such applications. I certify that the information on this application is true and correct and understand that I shall not start this project until this application is approved. I shall comply with the laws of the State of Montana and the ordinances of the City of Bozeman. ________________________________________________ __________________ Signature of Legally Responsible Person Date signed ________________________________________________ __________________ Printed Name Title ** For Official Use Only** LESS than one acre Received City By Date SMP Checklist  Yes No Field Visit SMP Plan Yes No Approval SMP Map Yes No Comments: Payment - $ Yes No Greater or equal to one acre Received MT Stormwater Discharge Permit (NOI)  Yes No SWPPP Yes No Site showing BMPs Yes No MT Stormwater Discharge Permit (NOT) Yes No SMP Checklist Yes No SMP Plan Yes No SMP Map Yes No Payment - $ Yes No     City of Bozeman, Montana Permit Number: ________ Date Submitted: ________ Site Name/Adress:_______________________________________________________________________ ______________________________________________________________________________________ LessChecklist Required Best Management Practice (BMPs) Stormwater Management Plan Descriptive Narrative Show on Map Initial Here E R O S I O N A N D S E D I M E N T C O N T O L 1 Prevent silt, dirt, topsoil, etc. from washing into the streets, alleys, drainage easements, drainage conveyance systems, and storm drains. 2 Implement and maintain erosion control B to prevent the erosion and transport of sediment by water/rain runoff. MPs 3 Include spoil areas and staging areas as part of the project/construction site. 4 Establish permanent erosion control for all disturbed land areas related to the project activity before final occupancy of structures located thereon. 5 Identify all erosion and sediment control B to be installed and maintained through duration of the project. MPs out the 6 Use clearing techniques that retain natural vegetation and retain natural drainage patterns (where feasible). 7 Stabilize soil within 14 days of clearing or inactivity in construction. 8 Stabilize or cover soil stockpiles at the end of EACH workday. 9 Employ wind erosion techniques to prevent th blowing of dust or sediment from the site. e 10 Employ techniques that divert upland runoff past disturbed slopes (where necessary). 11 Provide sediment controls in the form of settling basins, sediment traps or tanks, and perimeter controls (where necessary). Stormwater Management Checklist LESS Than One Acre Required Best Management Practice (BMPs) Stormwater Management Plan Descriptive Narrative Show Initial on Map Here P O L 12 Protect adjacent properties by the use of a vegetated buffer strip, silt fence, fiber rolls, or other BMP perimeter controls. L Keep solid waste materials in a container or an enclosed waste collection area on site. 13 U T I Store chemicals, paint, petroleum, fertilizer and pesticides in a covered enclosure. O 14 N Dispose of empty/unused chemical and hazardous waste containers in accordance w label instruction. 15 P ith R E Segregate potentially hazardous waste from non-hazardous waste. V 16 E Perform daily cleanup of construction site to ensure that all litter is contained in an appropriate enclosure or container. N 17 T I O 18 Recycle waste materials where feasible. N Contain concrete truck washout water on site in a designated washout pit. Remove and properly dispose of concrete residue at conclusion of construction. 19 A N D Ensure exposed aggregate waste wash water does not leave the construction site and or get into the curb and gutters, catch basins or any other storm conveyance systems. 20 W A S T E Locate sanitary waste facilities a minimum of 15 feet from storm drain inlets and receiving waterbodies. 21 M G T Delineate and stake the Flood Plain and install perimeter BMPs. 22 W List waterbodies within 200’ of project (stream, lake, river, wetland, slough, other). A 23 T E List stormwater conveyance systems within 100’ of project (ditch, swale, detention facility, storm drain inlet, drywell, gutter, pipe inlet/outlet). 24 R