Loading...
HomeMy WebLinkAbout00 Cover and Table of ContentsThe Guthrie 1 DECEMBER 2023 SPR SUBMITTAL TABLE OF CONTENTS SPR SUBMITTAL The Guthrie| 5th and Villard Block 6 DOCUMENTS SUBMISSION DATE 00 COVER AND TABLE OF CONTENTS 01 A1 - DEVELOPMENT REVIEW APPLICATION 02 CONR COMMENTS AND RESPONSES, APPLICATION #…. 03 CONR CLARIFICATION CORRESPONDENCE and EXHIBIT CLARIFICATIONS 04 CCOA CHECKLIST 05 SITE PLAN CHECKLIST 06 DEMOLITION CHECKLIST 07 SITE CONTEXT MAP 08 PROJECT AND DEM NARRATIVE 09 AFFORDABLE HOUSING NARRATIVE 10 PROPOSED BUILDING DESIGN 11 PROFORMA OWNER’S POLICY, PROOF OF OWNERSHIP 12 CIVIL ENGINEERING REPORT 13 TRAFFIC STUDY AND ACCESS DEVIATION 14 AMENDED SUBDIVISION PLAT 15 N1 - NOTICING MATERIALS, PROPERTY ADJOINERS LIST 16 PARKLAND ASSESSMENT 17 WATER RIGHTS VERIFICATION 18 GEO-TECHNICAL REPORT (FOR REFERENCE) 19 RENOVATION STUDY 20 WAIVER OF RIGHT TO PROTEST 21 WINDOW AND DOOR CUTSHEETS 22 HISTORIC PROPERTY RECORD 12-01-2023 12-01-2023 12-01-2023 12-01-2023 12-01-2023 12-01-2023 12-01-2023 12-01-2023 12-01-2023 12-01-2023 12-01-2023 12-01-2023 12-01-2023 12-01-2023 12-01-2023 12-01-2023 12-01-2023 12-01-2023 12-01-2023 12-01-2023 12-01-2023 12-01-2023 12-01-2023