Loading...
HomeMy WebLinkAbout038 - A3.11 - BUILDING ELEVATIONSCEGJLGRADEEL:4805' -0"LEVEL 01EL:4807' -6"ROOFEL:4864' -8 1/2"LEVEL 2EL:4820' -9"LEVEL 3EL:4831' -6"LEVEL 4EL:4842' -3"LEVEL 5EL:4853' -0"LEVEL 1.5EL:4809' -6"11' - 8 1/2"10' - 9"10' - 9"10' - 9"11' - 3"2' - 0"2' - 6"MECHANICAL SCREENINGDFHKT.O. PLATEEL:4862' -2 5/8"BA.5E-FAC-01E-FAC-03E-FAC-04E-FAC-01E-TR-01??AAAAAAAAAAAAE4E4E4AAAAAAAAE4E4AAAAGGGGGES100GGGGE-FE-02PAINTED VTAC GRILLE, TYP.OVERALLBUILDING HEIGHT61' - 1 3/8"MAXIMUM HEIGHT OF 50' PER BMC TABLE 38.320.030.CMAXIMUM HEIGHT OF 80' WITH 2 ADDITIONAL STORIES 15' PER STORY, PER BMC TABLE 38.380.030.B.3GRADE ADJUSTMENT FOR DEEP INCENTIVES RULESA4.803SimA4.804SimAA3.341ELECTRIC METER LOCATIONS REQUIRED BY NORTHWESTERN ENERGYEROOFEL:4864' -8 1/2"LEVEL 5EL:4853' -0"DT.O. PLATEEL:4862' -2 5/8"E-FAC-03E-TR-01E-FAC-01GRADEEL:4805' -0"LEVEL 01EL:4807' -6"ROOFEL:4864' -8 1/2"LEVEL 2EL:4820' -9"LEVEL 3EL:4831' -6"LEVEL 4EL:4842' -3"LEVEL 5EL:4853' -0"LEVEL 1.5EL:4809' -6"34711' - 8 1/2"10' - 9"10' - 9"10' - 9"11' - 3"2' - 0"2' - 6"MECHANICAL SCREEINGPAINTED VTAC GRILLE, TYP.3.8563.6T.O. PLATEEL:4862' -2 5/8"1.21.72E-FAC-01E-FAC-01E-FAC-01E-FAC-01E-FAC-01E-FAC-01E-FAC-01E-TR-01E-FAC-04E-FAC-01E-TR-02?E-FAC-01E-FAC-02 PANEL WITH DECAL MORSE CODE GRAPHIC SEE A0.20BBBBAAAAAAAAAAES102GGGGGGGGE-RF-03E-RF-01E-RF-03E-RF-01OVERALL BUILDING HEIGHT61' - 1 3/8"MAXIMUM HEIGHT OF 50' PER BMC TABLE 38.320.030.CMAXIMUM HEIGHT OF 80' WITH 2 ADDITIONAL STORIES 15' PER STORY, PER BMC TABLE 38.380.030.B.3GRADE ADJUSTMENT FOR DEEP INCENTIVES RULES1ELECTRIC METER LOCATIONS REQUIRED BY NORTHWESTERN ENERGY2' - 4 7/8"A4.801SimFENCE CONCEALING METERS FROM THE PUBLIC STREETGENERAL NOTES -ELEVATIONS1. SEE SHEET A0.22 FOR EXTERIOR MATERIAL MATRIX WITH FINISH IMAGES.Drawn By:Checked By:Project Number:Sheet Number:© 2023 Solomon Cordwell BuenzBUILDINGELEVATIONS321 N 5TH AVEBOZEMAN, MT 59715THE GUTHRIE AT 5THAND VILLARDA3.11RMBS2023029SCALE:1/8" = 1'-0"2WEST ELEVATIONSCALE: 1/4" = 1'-0"3ENLARGED EAST ELEVATIONSCALE: 1/8" = 1'-0"1SOUTH ELEVATIONNO. DATE DESCRIPTION1 9/22/2023 ISSUED FOR SCHEMATIC DESIGN2 12/1/2023 ISSUED FOR SITE PLAN REVIEW3 12/15/2023 ISSUED FOR DESIGN DEVELOPMENT5 02/16/2024 ISSUED FOR BUILDING PERMIT/ GMP03/05/24 SITE PLAN ROUND 2 REVISIONS