Loading...
HomeMy WebLinkAbout036 - A2.40 - ROOF PLANA3.10 1 A3.10 2 A3.11 2 A3.11 1 C E G J L 1 A3.20 1 A3.20 1 A3.21 1 A3.21 347 2 A3.20 2 A3.20 2 A3.21 2 A3.21 58' - 4"V A LLE Y RIDGERIDGE RIDGEHIP HIPV A L L E Y VALLEY VALLEY V A L L E Y RIDGE VALLEY V A L L E Y RIDGEVALLEYRIDGEVALLEYVALLEYHIP HIP RIDGEVALLEYVALLEYHIP HIP RIDGEVALLEYVALLEYRIDGEVALLEYVALLEYROOF DRAIN AND OVERFLOW D F H K 3.856 3.6 MECHANICAL ROOFTOP SCREEN WALLS B3060.01 ROOF HATCH 14' - 0"13' - 6"13' - 6"13' - 6"13' - 6"13' - 6"13' - 6"21' - 6"20' - 7"13' - 6"13' - 6"5' - 3 1/2"8' - 2 1/2"18' - 9 1/2" FIBER CEMENT PANEL-B2' - 1"11' - 11"4' - 6 1/2"16' - 0 1/2" A0.50 2 A0.50 1 11.21.72 A B A.5 WALK PAD ROOF ANCHOR WITH D RING, TYP. ROOF ANCHOR WITH D RING, TYP. Drawn By:Checked By: Project Number: Sheet Number: © 2023 Solomon Cordwell Buenz ROOF PLAN 321 N 5TH AVE BOZEMAN, MT 59715 THE GUTHRIE AT 5TH AND VILLARD A2.40 FG RM 2023029 SCALE:1/8" = 1'-0" 1 ROOF PLAN NO. DATE DESCRIPTION 1 9/22/2023 ISSUED FOR SCHEMATIC DESIGN 2 12/1/2023 ISSUED FOR SITE PLAN REVIEW 036