Loading...
HomeMy WebLinkAbout011 - A4-4 Exterior Elevations PH2 OfficeLevel 1 100' - 0" Level 2 112' - 0" ROOF TRUSS BEARING 121' - 0" ASPHALT SHINGLE ROOF SYSTEM PREFINISHED HORIZONTAL LAP SIDING SYSTEM PREFINISHED BOARD & BATT SIDING SYSTEM TIMBER COLUMNS 6" / 12" A A A B B B C C 109A 110 PREFINISHED HORIZONTAL LAP SIDING SYSTEM PREFINISHED BOARD & BATT SIDING SYSTEM TIMBER COLUMNS TUBE SHOP BUS PAINTED BY A BOZEMAN HIGH SCHOOL ART CLASS. PREFINISHED CORRUGATED METAL SIDING SYSTEM FACTORY FINISHED FIBERGLASS CLAD WINDOW SYSTEM W/ INSULATED DOUBLE PANE GLAZING. 6 " / 1 2 "6" / 12" 2" / 12" A A D A F F F 100 HIP AND HUMBLE ARCHITECTURE, LLC COPYRIGHT 2019418 South 5th Avenue Bozeman, MT 59715 406.581.3832 Bob@hahaarchitect.com PROJECT #:REVDESCDATEPHASEPRESDDDCDDATE1234HIP AND HUMBLE ARCHITECTURE, LLC A4-4 02.04.23EXTERIOR ELEVATIONS -PHASE 2 OFFICE BLDGCURRENT LANDING, LLCOUTDOOR REC. FACILITYLOT 2 - PARKWAY PLAZAMASTER SITE PLAN2021------------ 1/4" = 1'-0"A4-4 2 NORTH ELEVATION - PHASE 2 OFFICE 1/4" = 1'-0"A4-4 1 WEST ELEVATION - PHASE 2 OFFICE WINDOW SCHEDULE WINDOW SIZE HEAD DETAIL JAMB DETAIL SILL DETAIL COMMENTS A 48" x 48"DOUBLE CASEMENT B 36" x 24"AWNING C 72" X 72"DOUBLE CASEMENT D 60" X 60"DOUBLE CASEMENT E 48" x 60"DOUBLE CASEMENT F 6' 0" x 7' 0"ALUMINUM STOREFRONT G 7'-0" x 4'-0"ALUMINUM STOREFRONT WINDOW NOTES: 1. SELECTED WINDOW MFR. TO VERIFY EGRESS SIZES. 2. CONTRACTOR TO VERIFY ALL ROUGH OPENING DIMENSIONS WITH WINDOW MFR. 3. HEAD HEIGHTS ARE GIVEN TO TOP OF WINDOW FRAME ONLY. 4. PROVIDE TEMPERED GLAZING WHERE REQUIRED BY CODES. 5. PROVIDE WINDOW FALL PROTECTION WHERE SILL IS WITHIN 24" OF FLOOR AND GREATER THAN 72" TO FINISHED GRADE. 6. ALL WINDOW GLAZING TO BE 1" INSULATED LOW-E TYPE.