Loading...
HomeMy WebLinkAboutSHEET-PH-1 Ph 1 planting plan I ------ - — -- — _— ---- — — / --——————---- = ___---___—=----_-- I I � / -------__ \ —_______ __________________ x=------______ __---6---=----------��---------------_---------_-------= —___--------_---=-1----�__ ______ _ sus, / S., SotS s., so FALLON ST-37'TBC TO TBC / a- / 4 O i I I ---- r -- -- -1_ — — --- -- _ _ LJJ L -- __ _____ - -- — _�— CURBCUT __ — ___ — — - -- ----------- Mon. — — __—___ ____ o --- ��� B.C.in --- — -_ --- sea5�•s2•f .ea — � --_ --_ —_ -� \��\ Box S 89°49'08"E _ .,,5 r =w�» S 89°46'42"E 2 0' ——-- § — PROPER -- -- — — --- \ I Feu RY GRADE TO DRAIN m a55 1 0 --- - x •.. -aec-u ern i --- I 30.01' I v III K n i FLO a55 W ARROWS 'D' 43 _ ti(�� A. _ 3 PH F II y p \ \ G DING CONTO S < � C) i Q 1 _Z �' I � l�7 I— PHAS TOTAL�. � �5 �"�� 1 AS o ' .aagq,RE POND IFT E — I e \ IDED-B3CPT I I I _ In \ I I + } I H ASE 1 EMP RARY ROVIOED=3,000C ------- PHASE PER SITE PLAN � R ENTIG °"° r �, + m ��s w�o I GRAD TO D IN v P1 OFFICE 'I �p rr BUILDING(1) w5 ¢ I -I Q' . d / FLOW RRO F,o FF=47.0 p -I I - I I PHASE 1 RETENTION PONDS NOTES: LLI \ f 45 /A5 a" h / 0.b 2 I I 1 O I -� a5 00 I II 1.PHASE 1 WORK WILL REQUIRE 2,793 CFT(10YR-2HR Q — 46 \ - I DESIGN STORM)OF STORM WATER 'euaec `D II I II �II r - STORAGE/RETENTION AS SHOWN IN IN THE � o / III J 3 1 TEMPORARY POND T-1 ON THIS SHEET. IT IS i PHASE 1 �- - �' a m rG DING CONTOURS \ �\ COMPRISED OF A"NATURAL GRASSED DEPRESSION T _ 1 WITH ITS OVERFLOW TO THE NORTH INTO FALCON I I I I III r \\ Oltound III STREET. 11 OB.C.in Kern ( - a°oal i3"E, Y.P.0 B DIN 3 Mon.Box os WHEN PHASE 2 IS CONSTRUCTED AT A LATER DATE, a 11 °' I T AIDE RR N �� \ THIS TEMPORARY RETENTION POND WILL BE I FLOW ARR S TEM 01 RYI III III' ` PARKIN �TALLS REMOVED&REPLACED WITH THE INFILTRATOR a, m RETENTION SYSTEM AS SHOWN ON CIVIL SHEET C-3. II I ovI Cl A` 1 PHASE 1 GRADING —�I �� 4, .`,vvv v �1vvv AND GRASS PLAN \ I \ �� vvv a v v v v v m AT _ � � � I 1 -11 I I I II I � I , , I 1 v-I I ,� I I I►II � �I I O i 15 � I f i\ Pi STORAGE 1 i i - I BUILDING(2) FF=48.6 a" 46 ° �"+ I d Found 2 :° .3 Kerin 0 17. - 3 A.C. N8°3—"W- 48.84 M � --- \� - \ ` _ - ,a �s�s —sue- v z C \o�\\\ S89"3T58'E Found LARAMIE DR-3T TBC TO TBC soear IT Found A / o B.C.in \ Mon.Box B.C.in I I I I Mon.Box —`------------------------------------------- — — / �'__________________________________—________=r=— ----------�___= GRAPHIC SCALE r —7----/ 40 9 ro 20 i El / --- --___ __-----(-IN FEET) —— ———__-----_ — I ----- ---- -- -- — - — 1 inch 20 ft �— - — - — 11"X17":1"/40 ft VERIFY SCALE REVISIONS DRAWN BY:CMW PROJECT NUMBER THESE PRINTS MAY BE NO. DESCRIPTION DATE BY CHK'D.BY:CMW CURRENT LANDING,LLC OFFICES&OUTDOOR REC FACILITIES 1154.004 REDUCED.L HE NEIN LOW INCH ' LOT 2,BLK 1 -PARKWAY PLAZA SUB SHEET NUMBER MEASURES ONEINCH ON 9 CMW BOZEMAN MT 017 ORIGINAL DRAWING. NESISErlglnee.R CHRISTOPHER APPR.BY: Des gng ze N.11th Ave. PE = DRAWING NUMBER Bozeman,MT 59715 'ttt� DATE:12/19/23 MODIFY SCALE ACCORDINGLY Planning Phone:(406)581-3319 a O.A.REVIEW NGINEERING, INC SS7`o'sTEµE� BY: PHASING VEG,GRADING&DRAINAGE PLAN PH-1 H:\1154\004\ACAD\SHEETS\SHEET-REVEG.dwg Plotted by Chris wasia on 12/19/20239:18 AM g43egiffnilWofaXeWStaaafdofCaMnitngnt COPYRIGHT®GENESIS ENGINEERING,INC.2023 ONAL DATE: