Loading...
HomeMy WebLinkAbout53_A301_ELEVATIONS_06012021T.O. SUBFLOOR 100' -0" T.O. SUBFLOOR 100' -0" LEVEL 2 113' -3" LEVEL 2 113' -3" A B G H LJCKE T.O. PARAPET 130' -0" T.O. PARAPET 130' -0" 5 6 1 POLYCARBONATE EXTERIOR CLADDING "WINDOW" INSTALLED BEHIND CORRUGATED SIDING T.O. RIDGE 138' -0" T.O. RIDGE 138' -0" C C C C C C B D F 102 SF-12 3 138.5 2 M L L L L L I R1 151' - 0" 52' - 0"9' - 0"90' - 0" 1 2 12 2 12 T.O. SUBFLOOR 100' -0" T.O. SUBFLOOR 100' -0" LEVEL 2 113' -3" LEVEL 2 113' -3" ABGHLJCKE T.O. PARAPET 130' -0" T.O. PARAPET 130' -0" 2 6 1 1 1 5 ALUMINUM STOREFRONT GLAZING, TYP ALUMINUM CLAD WINDOW, TYP 2 12 2 12 POLYCARBONATE EXTERIOR CLADDING "WINDOW" INSTALLED BEHIND CORRUGATED SIDING T.O. RIDGE 138' -0" T.O. RIDGE 138' -0" C C D D 126.1 3 F SF-2 SF-13 FUTURE SIGNAGE L L L L LLL D I 151' - 0" C1 R1 50' - 4"10' - 8"90' - 0" EXTERIOR FINISH LEGEND 1 3/4" CORRUGATED STEEL SIDING. 24 GA MIN. FINISH: GALVALUME 2 3 3/4" CORRUGATED ALUMINUM SIDING. 24 GA MIN. PERFORATED. FINISH: MILL FINISH 3/4" ALUMINUM SIDING. PERFORATED. 24 GA MIN. FINISH: NATURALLY WEATHERED STEEL PANEL SIDING, 24 GA MIN. FINISH: NATURALLY WEATHERED 4 POLYCARBONATE TRANSLUCENT EXTERIOR CLADDING COLOR: WHITE 5 FIBER CEMENT PANEL SIDING. PAINT FINISH: BLACK 6 3/4" CORRUGATED STEEL ROOFING. 24 GA MIN. FINISH: GALVALUME 7 C1 TOTAL FACADE TRANSPARENCY TOTAL FACADE AREA: 4911 SF TRANSPARENT AREA: 1156 SF TRANSPARENCY PERCENTAGE = 24% TRANSPARENCY LEVEL ONE -FROM (30") TO (10') TOTAL FACADE AREA: 1136 SF TRANSPARENT AREA: 575 SF TRANSPARENCY PERCENTAGE = 51% FACADE TRANSPARENCY FROM 30" TO 10' TRANSPARENCY CALCULATIONS NORTH ELEVATION TOTAL FACADE TRANSPARENCY TOTAL FACADE AREA: 4911 SF TRANSPARENT AREA: 740 SF TRANSPARENCY PERCENTAGE = 15% TRANSPARENCY LEVEL ONE -FROM (30") TO (10') TOTAL FACADE AREA: 1136 SF TRANSPARENT AREA: 221 SF TRANSPARENCY PERCENTAGE = 19% SOUTH ELEVATION R1 sheet project code address© 2021 INTRINSIKrevisions111 North Tracy Ave.Bozeman, Montana59715Fax: 406.582.8911Ph: 406.582.8988BIM 360://HGV - Griffin Village Food Resource Center/HGV CENTRAL_21.rvtA301 HGV COMMUNITY FIRST GRIFFIN PLACE NORTH BUILDING ELEVATIONS 206 EAST GRIFFIN DR BOZEMAN, MT 59715 SITE PLAN 3.12.2021 1/8" = 1'-0"A301 1 SOUTH ELEVATION 1/8" = 1'-0"A301 2 NORTH ELEVATION No. Description Date C1 06.01.2021 RC SUBMITTAL 06.01.2021 R1 06.01.2021 RC SUBMITTAL 06.01.2021