Loading...
HomeMy WebLinkAbout066 Electrical Plan-3W D DWD D W W WD GENERAL ELECTRICAL NOTES: A. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED TO COORDINATE WITH EACH OTHER AND VERIFY THAT THERE ARE NO CONFLICTS IN LOCATION OF DUCTS, CONDUITS, DIFFUSERS, BOXES, AND OTHER ITEMS THROUGHOUT THIS PROJECT BEFORE FINAL PLACEMENT OF MATERIALS. B. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING OF FLOORS, WALLS, CEILINGS, AND ROOFS TO PERFORM THE REQUIRED WORK DEPICTED IN THESE DOCUMENTS. THE CONTRACTOR IS RESPONSIBLE FOR ALL PATCHING OF HOLES TO THE SATISFACTION OF THE ARCHITECT/ENGINEER. C. 3rd FLOOR IS IDENTICAL TO 2nd FLOOR, POWER, LIGHTING, DATA, AND FIRE ALARM, DEVICE AND FIXTURE LAYOUT AND CIRCUITING IS TO BE COPIED FROM 2nd FLOOR TO 3rd. D. 5th FLOOR IS IDENTICAL TO 4th FLOOR, POWER, LIGHTING, DATA, AND FIRE ALARM, DEVICE AND FIXTURE LAYOUT AND CIRCUITING IS TO BE COPIED FROM 4th FLOOR TO 5th. E. PROVIDE ARC-FAULT PROTECTION AS REQUIRE IN NEC 210.12 F. RECEPTACLES INSTALLED UNDER A SINK OR BEHIND A WASHING MACHINE, AND NOT EASILY REACHABLE FOR RESETTING, SHALL BE PROTECTED BY GFCI BREAKERS. G. COORDINATE KITCHEN ISLAND RECEPTACLE LOCATIONS WITH ARCHITECT PRIOR TO ROUGH IN. ENSURE INSTALLATION LOCATION COMPLIES WITH NEC 210.52.C.3. E5 E5E5 E2 E2 E2 E2 BIM FILE PATH: SHEET NO.: TITLE: COPYRIGHT 2021 SMA, P.C. REVISIONS: KEYMAP: ARCHITECT SEAL: PROJECT: PROJECT LOCATION: PREPARED FOR: LOGO: CONSULTANT: PROJECT NUMBER: DRAWN BY: CHECKED BY: TEAM: PHASE: DATE: PROJECT NUMBER:Plot Date:NOT FOR CONSTRUCTION HELENA P: 406-442-4933 BOZEMAN P: 406-219-2216 www.sma.design C:\Users\JBrianG\Documents\BG MILL MEP CENTRAL v22_bgoveia@energy-1.net.rvt 8/4/2022 4:53:11 PME1.3 22-024 2022-06-03 ELECTRICAL LIGHTING 3rd FLOOR Author Checker BG MILL CONDOMINIUMS 22-024 714 EAST MENDENHALL SREET BOZEMAN, MT 59715 50% SCHEMATIC DESIGN No.Date Revision Description E1.3 SCALE: 1/8" = 1'-0" 3-THIRD FLOOR RCP1