Loading...
HomeMy WebLinkAbout039 Arch Site PlanUP UP D STSTST HYD S CP SPR SPR SPR PAP PAP PAP PAP WES WES 18'-0"9'-0 " 1 6'-0 " 9'-0 "18'-0"N. BROADWAY AVE.5'-0"17'-0"17' -0" E. MENDENHALL ST.24'-1"24'-0"1 2 2 3 2 3 2 4 4 4 4 4 5 6 7 8 9 10 11 11 11 12 13 13 14 15 16 16 16 17 18 19 20 21 22 22 23 24 25 26 27 28 29 30 31 32 32 33 33 33 33 33 33 33 3 7 7 7 7 7 7 9 9 7 14 14 14 14 5 12 12 12 23 23 25 34 9 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 239'-8"8'-3 3/4 "8'-3"2 0 '-0" 2 3'-1 1 "12'-1"V A 35 35 1. WORK UNDER THIS CONTRACT INCLUDES ALL DESIGNATED WALKS, PADS, CURBS AND ASPHALT PAVED PARKING AREAS WITHIN THE CONTRACT BOUNDARY. PROVIDE ALL SITEWORK INDICATED INCLUDING TOPSOIL, LANDSCAPING, SEEDING, ETC.TO PROVIDE A COMPLETE FINISHED SITE. SEE IRRIGATION, LANDSCAPING, CIVIL AND ELECTRICAL FOR EXTENT OF WORK UNDER THOSE SUBCONTRACTORS. 2. DIMENSIONS ARE TYPICALLY TO FACE OF BUILDING, FACE OF WALL, EDGE OF WALK OR PAVING SIDE OF CURB. 3. FIELD VERIFY ALL EXISTING CONDITIONS. 4. SEE ELECTRICAL & LANDSCAPE DRAWINGS FOR SITE LIGHTING 5. PROJECT BLOCK FRONTAGE IS CLASSIFIED AS "STOREFRONT" PER SECTION 38.510, BMC. SHEET NOTES -SITE PLANSITE PLAN KEY (N) CONCRETE PAVING (N) ASPHALT PAVING (N) BUILDING AREA PROPERTY LINE SETBACKS & EASEMENTS PLANTINGS -TYPE AND QUANTITY TBD VISION TRIANGLE BLOCK FRONTAGE SETBACK BIM FILE PATH: SHEET NO.: TITLE: COPYRIGHT 2023 SMA, P.C. REVISIONS: KEYMAP: ARCHITECT SEAL: PROJECT: PROJECT LOCATION: PREPARED FOR: LOGO: CONSULTANT: PROJECT NUMBER: DRAWN BY: CHECKED BY: TEAM: PHASE: DATE: PROJECT NUMBER:Plot Date:SITE PLAN REVIEW HELENA P: 406-442-4933 BOZEMAN P: 406-219-2216 www.sma.design Autodesk Docs://22-024 BG Mill Condos/ARCH 22-024 - BG Mill-R22.rvt 9/13/2023 11:54:43 AMSPR-A0.10 22-024 2023-09-13 ARCHITECTURAL SITE PLAN SK CF/MO BG MILL CONDOMINIUMS 22-024 714 EAST MENDENHALL SREET BOZEMAN, MT 59715 SITE PLAN REVIEW 3/32" = 1'-0"SPR-A0.10 1 PRELIMINARY ARCHITECTURAL SITE PLAN N KEYNOTES - ARCHITECTURAL SITE PLAN 1 ASPHALT DRIVE, SEE CIVIL 2 CONCRETE WALK, SEE LANDSCAPING 3 EXPOSED AGGREGATE CONCRETE, SEE LANDSCAPING FOR DETAILS 4 12" CONCRETE MAINTENANCE STRIP AT BACK OF CURB 5 WOOD TOP BENCH 6 RECLAIMED CONCRETE SLAB SITE WALL 7 PERENNIAL BED 8 BIKE PARKING 9 HEATED CONCRETE APRON AT TRASH ROOM. NO OVERHEAD WIRES PERMITTED ABOVE. 10 PATIO SPACE 11 CANOPY OVERHANG, PER STOREFRONT BLOCK FRONTAGE REQUIREMENTS 12 CONCRETE SITE WALL 13 RAILROAD EASEMENT 14 PROPERTY LINE - SEE LEGEND 15 42" WALL TOP SCREENING FENCE 16 EXISTING FENCE 17 PROPOSED 6' SCREENING FENCE KEYNOTES - ARCHITECTURAL SITE PLAN 18 EXISTING STAND PIPE DRAIN 19 PROPOSED GENERATOR LOCATION 20 PROPOSED TRANSFORMER LOCATION 21 ASPEN GROVE 22 NATIVE SEEDING; SEE LANDSCAPING FOR DETAILS & SCHEDULES 23 METAL LANDSCAPE EDGER 24 6" CONCRETE HEADER 25 NEIGHBORING PARKING LOT 26 PROPOSED ELECTRICAL SERVICE LOCATION; SEE ELECTRICAL FOR DETAILS 27 PROPOSED GAS RISER LOCATION 28 IRRIGATION LINE 29 6' UTILITY SCREENING 30 10' CONCRETE UTILITY ACCESS 31 POTENTIAL ARTWORK LOCATION (NOT CODE ENFORCED) 32 BLANK WALL SCREENING 33 IRRIGATION SLEEVE; SEE LANDSCAPING FOR DETAILS 34 SNOW STORAGE TO SOUTH; SEE CIVIL 35 ADA TRUNCATED DOME PAD AT PEDESTRIAN SIDEWALK RAMP 1 1 1 No.Date Revision Description 1 9/13/2023 SPR RESPONSES