Loading...
HomeMy WebLinkAbout008-SEPARATOR DETAILS-C-7HEADWATERSPROJECT NUMBERDRAWING NUMBERDRAWN BY:DATE:2023VERIFY SCALETHESE PRINTS MAY BEREDUCED. LINE BELOWMEASURES ONE INCH ONORIGINAL DRAWING. MODIFY SCALE ACCORDINGLYH:\2036\001\ACAD\SHEETS\DETAIL-SHEETS.dwg Plot Date: 1/30/2023 12:26 PM© HEADWATERS ENGINEERING, INC.REVISION DATE:190 NORTHSTAR LANE, BOZEMAN, MT 59718HEADWATERSMT.NET406-581-5730PROJECT LOCATIONMONTANABOZEMAN01/30/2023REHYDRODYNAMIC SEPARATOR DETAILTBD CATALYST STREETWARBLER CONDOS2036.001C-7