Loading...
HomeMy WebLinkAbout012 A3.2 ROOF PLAN-BLDG 2DESCRIPTION:NO:DATE:DRAWN BY: CHECKED BY: JOB NO: PLOT SCALE:BY:2004-2022 JDS ARCHITECTSc 03-25-22 BOZEMAN, MONTANABOULDER CREEK - PHASE 2STAMP No. 2557 SOBREPENA JESSE D.AN ATNOMFOETATS T A N AMON E MANBOZ E NSELI C A R CD H ITECTABIGAIL LANE18-PLEX BLDG # 2A3.2 1/8"=1'-0" 1/8"=1'-0" ROOF PLAN 18-PLEXA A3.2DOWNSPOUT SEAMLESS GUTTER EDGE OF WALL BELOW SNOW STOPS AS REQUIRED RIDGEVALLEY W/ CRICKET SLOPE 10:12 SLOPE 10:12 SLOPE6:12SLOPE6:12VALLEYSLOPE3:12SLOPE4:12VALLEY SLOPE3:12VALLEY SLOPE4:12RIDGE RIDGERIDGESLOPE 10:12 SLOPE 10:12 SNOW STOPS AS REQUIRED RIDGESLOPE3:12VALLEY W/ CRICKETSLOPE4:12VALLEY SNOW STOPS AS REQUIRED SLOPE6:12SLOPE6:12RIDGE VALLEY SLOPE4:12SNOW STOPS AS REQUIRED VALLEY W/ CRICKET SNOW STOPS AS REQUIRED SNOW STOPS AS REQUIRED SNOW STOPS AS REQUIRED SNOW STOPS AS REQUIRED SNOW STOPS AS REQUIRED SNOW STOPS AS REQUIRED 18-060 JDS RBT