Loading...
HomeMy WebLinkAbout006 Appendix E - Phasing PlanOHE OHE OHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHERETENTIONBASIN 1RETENTION BASIN 3 RETENTIONBASIN 9RETENTIONBASIN 6RETENTION BASIN 10RETENTIONBASIN 4RETENTION BASIN 11 OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHESOUTH 25TH AVENUESOUTH 22ND AVENUESTATE STREET BLOCK 1 LOT 1 1.28 AC REMU ZONING BLOCK 3, LOT 3 1.21 AC REMU ZONING BLOCK 2, LOT 1 4.30 AC REMU ZONING BLOCK 1 PARK 8.84AC WEST KAGY BLVD REMINGTON WAY BLOCK 3, LOT 2 1.26 AC REMU ZONINGSOUTH 25TH AVENUESOUTH 23RD AVENUERETENTIONBASIN 7RETENTION BASIN 8 RET.BASIN2 BLOCK 3, LOT 1 6.50 AC REMU ZONING BIO-RETENTION 5A BIO-RETENTION 5B W 8' 8' 8'COMMON OPEN SPACE 2 (0.29 AC)COMMON OPEN SPACE 1 (0.23 AC)SHEET NUMBER PROJECT CODE PROJECT ADDRESS ARCHITECT RETAINS COPYRIGHT TO THESE DRAWINGS.DRAWINGS ARE ONLY FOR USE FOR PROJECT NAMED ONDRAWING SHEET AND MAY NOT BE REPRODUCED OR USEDFOR OTHER PURPOSES WITHOUT WRITTEN PERMISSIONFROM ARCHITECT. A000 ASW AAKER PROPOSED LAND USE MAP NORTH WEST CORNER OF S 19TH AND STUCKY PRELIMINARY PLAT APPLICATION 106 EAST BABCOCK STREET SUITE 1A BOZEMAN, MT 59715 SHEET NAME PROJECT NAME DRAWING REVISIONS DRAWING ISSUE DATE DRAWING ISSUED FOR PHONE: (406) 582-8988 N A A1.1