Loading...
HomeMy WebLinkAbout079 OVERALL SITE GRADE & DRAIN PLANWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWSSSSSSSSSSSSSOOOOOOOOOOOOOOOO21 2627 28 29 30 31 32 33 204 1604230 SSSSSS22201 WWWWWWWWWWWWWW OHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPBT BT BT BT BT BT BT BT BT BT S D SD SD S S S S S S S S S S S S SSD SD SD W W W OHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPTVPEFDEESPDESTVPPDSWWWWWW4730473547 3 5473547354735 472547304730473047304730473547354735GRADING AND DRAINAGE NOTES:1.ALL TIE-INS TO EXISTING ASPHALT, CONCRETE CURBS, AND SIDEWALKS SHALL BE SAWCUT OR NEAT CUT BY METHOD APPROVED BY THE ENGINEER. PROVIDE SMOOTHTRANSITIONS TO EXISTING SURFACES.2.CITY OF BOZEMAN CATCH AND SPILL CURB SHALL BE INSTALLED PER DETAIL 1 ONSHEET C050. PROVIDE SMOOTH TRANSITIONS BETWEEN CATCH AND SPILL CURB.3.LANDSCAPE AREAS SHALL BE GRADED TO DRAIN AWAY FROM BUILDINGS.4.SITE GRADING SHALL NOT PROCEED UNTIL EROSION CONTROL MEASURES HAVE BEENINSTALLED.5.ALL GRADING AND DRAINAGE INFRASTRUCTURE INCLUDING BUT NOT LIMITED TO CURBRAMPS, CROSSWALKS, AND LANDINGS SHALL CONFORM TO ADA (AMERICANS WITHDISABILITIES ACT) REQUIREMENTS.6.LANDSCAPE PLAN PROVIDED BY OTHERS. SEE LANDSCAPE PLAN FOR LANDSCAPEINFORMATION.OVERALL SITEGRADE & DRAINPLANCCFWEHC11-1SheetNumber:© 2022 Solomon Cordwell BuenzProjectNumber:Drawn By:Checked By:Tschache Lane & 27 Ave.Bozeman, MT 597182695 Tschache Lane2022001.000NO.DATEDESCRIPTIONSITE PLAN REVIEW - RC 102.17.2023ASITE PLAN REVIEW SUBMISSION08.31.20224SITE PLAN REVIEW - RC 205.10.2023B5010025500SCALE IN FEETGRADING ANDDRAINAGE PLAN 1SHEET C11-2GRADING ANDDRAINAGE PLAN 3SHEET C11-4GRADING ANDDRAINAGE PLAN 4SHEET C11 -5GRADING ANDDRAINAGE PLAN 5SHEET C11 -6GRADING ANDDRAINAGE PLAN 2SHEET C11 -3FL-1 FFE:4730.80AM-1 FFE:4733.50AM-3 FFE:4731.80FL-2 FFE:4736.10RH-1 FFE:4734.50RH-2 FFE:4734.50RH-3 FFE:4734.50RH-4 FFE:4740.40RH-5 FFE:4740.90RH-6 FFE:4741.50RH-7 FFE:4742.20RH-8 FFE:4742.50FL-3 FFE:4740.80RH-11 FFE:4739.50RH-12 FFE:4739.00 RH-10 FFE:4740.00RH-9 FFE:4738.75SU-1 FFE:4737.75SU-2 FFE:4738.25SU-3 FFE:4738.75SITE PLAN RC-2 05/2023 TSCHACHE LANE60' ROWTURBULENCE LANE60' ROWTRADE WIND LANE60' ROWN 25TH AVE.60' ROWN 27TH AVE.90' ROWBAXTER LANE50' ROWEXIST ING "BAXTERAPARTMENTS"DEVELOPMENTPROPOSED STORM WATER DETENTION PONDWETLAND BOUNDARYPER POWER ENGINEERSWETLAND DELINEATIONREPORT. OCTOBER 2021WETLAND BOUNDARY PERPOWER ENGINEERSWETLAND DELINEATIONREPORT. OCTOBER 202120' WATERCOURSE SETBACK(ZONE 2) PER BMC38.410.100.e30' WATERCOURSE SETBACK(ZONE 2) PER BMC38.410.100.e50' WATERCOURSE SETBACK(ZONE 2) PER BMC38.410.100.eBBBBBBB