Loading...
HomeMy WebLinkAbout043_L3.3_IrrigationPlanEastNELSON MEADOWS SUBDIVISION LOT 23 - BLOCK 1 - ROYAL WOLF WAY PROPOSED BUILDING, SEE ARCH. SN O W S T O R A G E SNOW STORAGE^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^ 18 18 18 18 18 18 18 18 18 18 18 181818 18 18 18 18 18 18 18 18 18 18 18 C FSRS ^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^ ^^^^^^^^^^^^^^^^^^^^^^^^^ ^ ^^^^^^^^^^ ^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^ ^ ^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^24 24 24 24 18 18 18 18 18 18 18 18 18 18 18 24 18 18 18 24 2424242424 24 24 24 24 24 18 18 ^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^4" ^^^^^^^^^^^^^^^^^^^^3" 3" 24 24 24 1818 ^^^^^^^^^^^^^^^^4" 3" 3" 2"3" 4" 4" 4" 255.13 112" ^^^^^^10.415 2" 20.516 112" 21.917 112" 57.818 2" 6.1219 112" 15.620 112" 216.94 2" 2221.7 2" 2321.3 112" 112" 3" 3" 3" 3" 1" 2" 1" 1" 1" 1" 1" 1" 2" 2" 1" 3" 1"MATCHLINE - SEE SHEET L3.4PROPOSED BUILDING, SEE ARCH. ROYAL WOLF WAY NELSON MEADOWS SUBDIVISION LOT 23 - BLOCK 1 - 2 L4.1 HUNTER WEATHER STATION 1 L4.1 CONTROLLER - WALL MOUNT 3 L4.1 INTERIOR POINT OF CONNECTION 1 L4.2 QUICK COUPLER VALVE 8 L4.1 1" DRIP ZONE KIT 5 L4.1 ELECTRIC CONTROL VALVE 2 L4.2 DOUBLE VALVE BOX 3 L4.2 VALVE BOX PLACEMENT 4 L4.1 TRENCHING DETAILS 7 L4.1 TYPICAL SUBSURFACE DRIPLINE SPACING 5 L4.2 TREE RING DRIPLINE 4 L4.2 DRIP EMITTER 6 L4.1 GRASSPAVE2 WITH IRRIGATION HEADS 7 L4.2 POP-UP SPRAY HEAD SLEEVING TYP.MAINLINE TYP.^^^^GRASSPAVE2 IRRIGATION TO BE ON SEPARATE ZONES SLEEVING TYP. ALL IRRIGATION TO BE INSTALLED IN LANDSCAPE AREA AREA FOR DRIP TYP. SLEEVING TYP. FC FC 9 L4.1 FLOW CONTROL VALVE 5.7624 112" 114" 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.03.0 3.0 3.03.03.0 3.0 3.0 3.0 3.0 3.0 3" 3" 4" 3"4"4" 212" 112" 19.71 2" 43.32 2" 49.96 2" 43.15 2" 47.94 2" 1.563 112" 9 L4.2 THRUST BLOCKING MAINLINE 10 L4.2 POP-UP ROTOR ROTOR ZONES IN NATIVE GRASS TO HELP WITH ESTABLISHMENT. ZONES WILL BE TURNED OFF AFTER NATIVE SEED IS ESTABLISHED. ZONES TO BE PERMANENTLY INSTALLED. 3" 0 20 SCALE: 1" = 20' 401020 IRRIGATION PLAN - EAST Project Number: Drawn By: Reviewed By: Approved By: Issue Date ThinkOne Architects 101 E Main St. Studio 1 Bozeman, MT, 59715 T: 406-586-7020 Architect MEP Engineer Landscape Architect Civil Engineer Seal Project Number Sanderson Stewart 106 East Babcock St. Suite L1 Bozeman, MT 59715 T: 406-522-9876 AndersonMasonDale Architects, P.C. 3198 Speer Boulevard Denver, CO 80211 T: 303-294-9448 Associate Architect Structural Engineer Morrison-Maierle, Inc. 2880 Technology Blvd. Bozeman, MT 59715 T: 406-587-0721 Morrison-Maierle, Inc. 2880 Technology Blvd. Bozeman, MT 59715 T: 406-587-0721 Sanderson Stewart 106 East Babcock St. Suite L1 Bozeman, MT 59715 T: 406-522-9876 3/29/2023 4:27:47 PML3.3 IRRIGATION PLAN - EAST CS RPE RPE 21-723BARNARD OFFICE HQ 21-723 BOZEMAN, MT ROYAL WOLF WAY01/25/23SITE PLAN SUBMITTAL 03/29/23SITE PLAN RESUBMITTAL                      BARNARD CONSTRUCTION UULC