Loading...
HomeMy WebLinkAbout004_SD1.1 Site Plan - Phases1&2SNOW STORAGE STORMWATER RETENTION DURSTON ROAD FERGUSON AVEKimball AveFlander's Mill Subdivision Christ the King Lutheran Church ACCESS EASEMENT60' - 0"FLEXIBLE LAWN SPACE LANDSCAPE SCREENING BB COURT 12' - 0" 78' - 0" 12' - 0" 33' - 0" FULL ACCESS 10' - 0"FRONT YARD SETBACK PHASE ONE UTILITY EASEMENT 20' - 0"UTILITY EASEMENT20' - 0"TYP. 6' - 0"10' - 0"8' - 0"8' - 0"5 10 11 11 11 6 8 8 8 8 TYP. 9' - 0" UTILITIES T R AI L E A S E M E N T 2 5 ' - 0 "VISION TRIANGLE VISION TRIANGLEUTILITY EASEMENT10' - 0"STAFF ENTRY MAIN ENTRY Heritage Christian School 6' - 0"20' - 0"6' - 0"PARKING CALCULATIONS: PHASE TWO: A-3: CHURCH Parking Requirement = 1 Stall per 6 persons of Max. Occ. Load Main Assembly Space: 648 Occupants Fellowship Hall: 171 Occupants All Classrooms: 334 Occupants MAX OCCUPANT LOAD = 1,153 Occupants Required Phase Two Stalls: ,1153/6 = 192.1667 (193 Stalls) Phase 2 Required Parking per UDO: 193 Stalls Total Phase 2 Parking Provided: 191 Stalls (Additional Stalls provided in Phase 1) Masterplan Parking Required per UDO: 51 + 193 = 244 Stalls Total Masterplan Parking Provided: 86 + 191 = 277 Stalls EXISTING WATER MAIN EXISTING GAS LINE EXISTING COMM. FIBER LINE EXISTING COMM. CABLE LINE NEW 8" WATER LINE NEW SANITARY SEWER SNOW STORAGE STORMWATER RETENTION MANHOLE FIRE HYDRANT 5 0' - 0" 5 0 ' - 0 " WAT ERC O U R S E S E T B AC K COLLECTOR // LANDSCAPE BLOCK FRONTAGEMINOR ARTERIAL // LANDSCAPE BLOCK FRONTAGE6' - 0"TYP.6' - 0"6' - 0"6' - 0"7' - 0"ELECTRICAL TRANSFORMER; RE: ELECT. JUNCTION CAN; RE: ELECT. ENTRY SECONDARY ENTRY ENTRY FELLOWSHIP PATIO FLEXIBLE LAWN SPACE PLAYGROUND AREA LANDSCAPE BERM & SCREENING 8' WIDE GRAVEL PEDESTRIAN/BIKE TRAIL TRINITY CHURCH MONUMENT SIGNFULL ACCESS SANCTUARY EMERGENCY EXIT EMERGENCY EXIT FELLOWSHIP CLASSROOMS PHASE TWO CLASSROOM ENTRY TYP.26' - 0"11 10 9 9 9 9 9 9 9 8 9 9 4 5 11 10 3 7 9 7 9 5 DROP-OF F AREA3 0 ' - 0 " 11 LANDSCAPE SITE WALL PEDESTRIAN CROSSWALK SNOW STORAGE STORMWATER RETENTION FUTURE PAVILLION (5) BIKE RACKS FROM PROPERTY BOUNDARY95'-0".CTK TRAIL EASEMENT 15' - 0" AND TRAIL EASEMENT 10' - 0" UTILITY EASEMENT EXISTING STREET LIGHTING EXISTING MANHOLETRAIL EASEMENT25' - 0"BRIDGER VIEW CONNECTION TO EXISTING TRAIL AT FLANDER'S MILL PRE-MANUFACTURED PEDESTRIAN BRIDGE; RE: LANDSCAPE SPANISH PEAKS VIEW10' WIDE ASPHALT SHARED USE PATH PAVED PEDESTRIAN BIKE TRAIL (EXISTING) BENCH; RE: LANDSCAPE CONNECTION TO TRAIL FOR TRAIL MAINTANENCE PROPOSED CROSSWALK CONNECTING TO MEADOWLARK ELEMENTARY N-S SIDEWALK; RE: CIVIL TYP.18' - 0"SITE LIGHTING; RE: ELECTRICAL GAGA BALL SNOW RETENTIONPHASE ONE: A-3: COMMUNITY CENTER Parking Requirement = 1 Stall per 200 SF Area: 7,492 SF Gross Required Stalls: 7,492/200 = 37.46 (38 Stalls) B: OFFICE Parking Requirement = 1 Stall per 250 SF Area: 3,600 SF Gross Required Stalls: 3,600/250 = 14.4 (15 Stalls) Phase 1 Parking Required per UDO: 53 Stalls Total Phase 1 Parking Provided: 85 Stalls FIRE HYDRANT FIRE HYDRANT STORMWATER RETENTION SNOW STORAGE STORMWATER RETENTION WILLIAM A. HANSON 1898 FOETATS MONT A N AEMANZOB T A N ANOM A R C H IT ECTDES N ECIL COPYRIGHT 2019 12/2/2021 9:42:34 AMSD1.1 Site Plan Review 12.2.21 1811TRINITY CHURCHMINISTRY CENTER701 North Ferguson Ave. Bozeman, MT 59718SITE PLAN -PHASE 1 & 21" = 40'-0"SD1.1 1 SITE PLAN_Masterplan NORTH ISSUE DATE DESCRIP.