HomeMy WebLinkAbout026 Concurrent construction J!"3OZ E MAN MT CCOFF Community Development N C U R R E N T CONSTRUCT� OPNl �WBDIVISIONS & OFF-SITE IMPRO EMEN CONCURRENT CONSTRUCTION PROCEDURE (38.270.030.D.) Subdivisions and site plans requiring off-site public infrastructure improvements may be completed concurrently with on-site vertical construction through a request for concurrent construction. Per the Bozeman Municipal Code (Sec. 38.270.030 D), off-site improvements require review and approval and must be requested at time of Subdivision Preliminary Plat and/or Site Plan Application submittal. CONCURRENT CONSTRUCTION REQUIREMENTS All Concurrent Construction requirements for subdivisions and off-site improvements can be referenced in the Bozeman Municipal Code Sec. 38.270.030 D. APPLICATION SET Application set must be submitted following Development Review Committee initial approval of concurrent construction: 1. Concurrent Construction Plan. Note: IA must be in sync with the Concurrent Construction plan. 2. CitV Standard Improvements Agreement (IA), A. If financial guarantee is used, submit cash or the City's standard template for Letter of Credit or Bond with Improvements Agreement. B. Improvements must be completed within 2 years of IA date. 3. Proof of Hazard and Commercial General Liability Insurance. 4. City Standard Concurrent Construction Hold Harmless Agreement. S. If applicable, Enter an agreement with the City to address interim services provided during construction. FORMAL ACKNOWLEDGMENT By requesting Concurrent Construction for subdivisions and off-site improvements, the applicant is responsible for understanding and adhering to the Bozeman Municipal Code (BMC Sec. 38.270.030 D) throughout the project development. The applicant understands and accepts the risk in application approval delays if the Concurrent Construction application does not satisfy all requirements of the BMC. The applicant acknowledges that by submitting Concurrent Construction he/she agrees: 0 Concurrent Construction must be requested and applied for prior to Development Review Committee (DRC) review. Failure to provide a Concurrent Construction plan may result in a Modification to your application and/or delays in review timing; © Site development must be under the control of a single developer and single contractor; Q Improvements will be designed, constructed, and installed according to the standards and criteria as adopted by the city; 0 The City has the authority to issue permits incrementally and revoke permits for non-compliance; QImprovements will be completed within 2 years of completion of the Improvements Agreement; Increased risk of loss is possible when certain public services do not exist at the site; ® The City may impose additional fees for any extraordinary costs associated with processing and administering this Concurrent Construction application. Concurrent Construction Subdivision & Off-Site Page 1 of 2 Revision Date: November 2021 CONCURRFN -T- CONSTRUCTION SU BDIVIS Ql\f & OEM- - SITE CHECKLIST SIGNATURES This application must be signed by both the applicant(s) and the property owner(s) (if different) before the submittal will be accepted. Applicant Signature: Date: j���z� Applicant Printed Name-y/ Pp A/ - ��' y.,�___ ._._. Date: Owner Signature: ' Date:-- Owner Printed Name: �' ,-y , Date: _/-3 12 REQUIRED FORMS CCOFF, SP, or PP, IA, Hold Harmless CONTACT US Alfred M. Stiff Professional Building phone 406-582-2260 20 East Olive Street fax 406-582-2263 PO Box 1230 planning@bozeman.net Bozeman, MT 59715 www.bozeman.net/planning For Official Use Only Check each box once each document is reviewed and approved. Concurrent construction cannot be approved until all documents have been completed and approved. Improvements Agreement Letter of Credit/Bond (if Applicable) [:]ApprovalE]Deniial Please provide explanation below Final Engineering Design (City and DEQ) Hazard and Commercial General Liability Insurance Print Name: Date: Fj Hold Harmless Agreement — ------ -- ----- - -- -- -^ Signature: Concurrent Construction Plan Email/Narrative acknowledging increased risk of loss Concurrent Construction Subdivision & Off-Site Page 2 of 2 Revision Date: November 2021 _