Loading...
HomeMy WebLinkAbout015 L601 - Irrigation Water Use Calculations & Sleeving Plan 2SIOSIOLAN8'8'8'8'WESWES8'LANLANSIOSIOSIOVAUGHN DRIVE(FUTURE)IRRIGATIONSLEEVE, TYP.IRRIGATIONSLEEVE, TYP.IRRIGATIONSLEEVE, TYP.ALL PROPOSED PLANTING WITHINTHE PERPETUAL WETLAND EASEMENTTO BE INSTALLED BY HAND WITH LIMITEDDISTURBANCE. TEMPORARYDRIP IRRIGATION TO BEPROVIDED TO PLANTINGS.PERPETUAL WETLANDEASEMENTVAUGHN DRIVE TO BE CONSTRUCTEDIN FUTURE PHASE. IRRIGATIONTO BE PROVIDED IN FUTURETO BOULEVARD TREE PLANTING.IRRIGATIONTYPEIRRIGATION WATER USE- PHASE 1 PARKTOTAL AREA /QTYANNUALET RATETOTAL ANNUALH2O5,520 SF29 IN / SF99,730 GALH.E. SOD SPRAY IRRIGATION 246,649 SF6 IN / SF921,974 GALH.E. NATIVE SPRAY IRRIGATIONH.E. TREEBUBBLER/DRIP61 TREES16.5 GAL /WEEK18,117 GALH.E. SHRUBBUBBLER/DRIP156 SHRUBS7.5 GAL /WEEK21,060 GALTOTAL ANNUAL H2O REQUIRED: 1,060,881 GALTOTAL ACRE FEET PER YEAR: 3.26 ACRE FTSYMBOLSIZEDESCRIPTIONIRRIGATION LEGENDBACKFLOW PREVENTER1"BFCONNECTION POINTCPIRRIGATION SLEEVE, 4" MIN. SCH 40 PVC*NOTES:-LAYOUT TO BE DETERMINED IN FIELD BY IRRIGATION CONTRACTOR.-WELLS TO BE INSTALLED 100' FROM SANITARY SEWER LINES-IRRIGATION SYSTEM TO BE HUNTER 2-WIRE SYSTEM/DECODERS WITHA HUNT CONTROLLER, UNLESS OTHERWISE APPROVED BY THE CITY'SPARKS OPS SUPT.SEEPLANN/AWELLN/AW8'LANLANVAUGHN DRIVE TO BE CONSTRUCTEDIN FUTURE PHASE. IRRIGATIONTO BE PROVIDED IN FUTURETO BOULEVARD TREE PLANTING.Irrigation WaterUse Calculations& Sleeving Plan- NorthL 6013015060N1L6011"=30'-0"Irrigation Water Use Calculations & Sleeving Plandesign5la.com406.587.4873dateissuedrawn by:checked by:filename:z:\nwb west park neighborhood\autocad\01_sheets\norton west park-parks-ph1\l600_west-park-parks_irrigation-ph1.dwg West Park Phase 1 Park Plan Bozeman, Montana KHM/HU TMS 05/06/22Prelim Plat09/02/22Prelim Plat RC11/11/22Prelim Plat RC01/03/23InfrastructureMATCHLINE L600:13015060N2L6011"=30'-0"Irrigation Water Use Calculations & Sleeving PlanMATCHLINE L601:2MATCHLINE L601:1