Loading...
HomeMy WebLinkAbout006 L000 - Overall Subdivision PlanDYHDYH DYHSDSSGSSSSSSWV WV WV WVWV WVWVWVWVWV TWVWV PTPTWV WVS201854780.033MHS-TEMPS WV WVWV DYHWVWVWV WVWVWVWVWVWVWVWVWVWVWVWVWVWVWVWVDYHDYHSSDYH8W8W8W8W8W8W8W8W8S8S8S8S8S8S8SFMFMFMFM FM8S8S8S8S8S8S8S8S8S15SD15SD15SD15SD15SD15SD 15SD 15SD15SD15SD15SDWES SIOSIOLAN8'8'8'8'WESWESSIOLANLANWESWESWESWESWES8'8'WESLANLANLANLANLANSIOSIOSIOWESWESSIOSIOWESLANWESLANLANEXISTINGWETLAND, TO BERECONSTRUCTEDAT PARKVAUGHN DRIVE (FUTURE)POND LILY DR. (FUTURE)WEST BABCOCK STREETLAUREL PARKWAY VAUGHN DRIVEBRONKENPARKVALLEYWESTSUBDIVISIONBRONKENPARKTHE LAKESAT VALLEYWESTNORTONEAST RANCHSUBDIVISIONNORTONEAST RANCHSUBDIVISIONNORTONEAST RANCHSUBDIVISIONVAUGHN DRIVE (FUTURE)BLOCK 1LOT 25.24 acs.228268 sq.ft.BLOCK 1LOT 14.33 acs.188509 sq.ft.BLOCK 1OPEN SPACE 10.63 acs.27262 sq.ft.BLOCK 2LOT 16.93 acs.302002 sq.ft.BLOCK 2OPEN SPACE 13.98 acs.173294 sq.ft.BLOCK 3LOT 14.66 acs.202931 sq.ft.BLOCK 3CITY PARK 18.50 acs.370171 sq.ft.BLOCK 4CITY PARK 12.74 acs.119234 sq.ft.PUBLIC R-O-W3.82 acs.166342 sq.ft.9" 9" 28" 18"VAUGHN DRIVEPERPETUALWETLANDEASEMENTBAXTERCREEKIRRIGATIONDITCHRECONSTRUCTEDWETLANDSPROJECT DATANORTON WEST PARKSUBDIVISIONSW 14 of the NE 14, the SE 14 of the NW 14,the NW 14 of the SE 14 and the NE 14 of theSW 14 of Section 9, T. 2 South,R. 5 E, PMM Gallatin County Montana.ZONING: R4ACRES: 40.82PROJECT OWNER8FC, LLCPatrick EibsPO Box 11388Bozeman, MT 59719(406) 539 - 1366ENGINEERMORRISON-MAIERLEJames Nickelson2880 Technology Blvd. WBozeman, MT 59708(406) 922 - 6824ARCHITECT/PLANNERINTRINSIK ARCHITECTURETyler Steinway106 E. Babcock St. Suite 1ABozeman, MT 59715(406) 582 - 8988LANDSCAPE ARCHITECTDESIGN 5, LLCTroy Scherer111 N. TracyBozeman, MT 59715(406) 587 - 4873SHEET INDEXL000-OVERALL SUBDIVISION PLANL001-NOTES AND LEGENDSL100-PARK HARDSCAPE & GRADING PLANL101- PARK HARDSCAPE & GRADING PLANL102- PARK HARDSCAPE & GRADING PLANL103- PARK HARDSCAPE & GRADING PLANL300-PARK PLANTING PLANL301- PARK PLANTING PLANL302- PARK PLANTING PLANL303- PARK PLANTING PLANL500- LANDSCAPE DETAILSL501- LANDSCAPE DETAILSL600- IRRIGATION WATER USE CALCULATIONS &SLEEVING PLAN - SOUTHL601- IRRIGATION WATER USE CALCULATIONS &SLEEVING PLAN - NORTHD-1CONSTRUCTED WETLAND CROSS SECTIONSLANDSCAPE CODE SUMMARYWEST PARK - PHASE 1 PARKSDROUGHT TOLERANT SPECIES75% OR GREATER OF THE PROPOSED TREES AND SHRUBS ARE DROUGHT TOLERANTSPECIES AS DEFINED IN THE LATEST EDITION OF THE MONTANA NURSERY ANDLANDSCAPE ASSOCIATION'S DROUGHT TOLERANT PLANTS FOR THE MONTANALANDSCAPE OR THE COB LIST OF DROUGHT TOLERANT SPECIES.STREET FRONTAGE LANDSCAPINGSTREET FRONTAGE FOR VAUGHN DRIVE AT PARK: 1121.92 LF = 22 TREESSTREET FRONTAGE FOR WEST BABCOCK STREET AT PARK: 385.83 LF = 8 TREES-REQUIRED: ONE LARGE CANOPY TREE FOR EACH 50 FEET OF TOTAL STREETFRONTAGE ROUNDED TO THE NEAREST WHOLE NUMBER.-PROVIDED:--22 TREES FOR VAUGHN DRIVE (PROVIDED IN PHASE 2)--8 TREES FOR WEST BABCOCK STREETACCEPTABLE LANDSCAPE MATERIALSTHE PLANT MATERIAL FOR THE PROJECT MEET THE STANDARDS OF SEC. 38.550.030 G.SEE LANDSCAPE SCHEDULE ON SHEET L001 FOR SPECIES AND SIZES OF PLANTMATERIAL.WATERCOURSE SETBACK LANDSCAPINGZONE 1 REQUIRED: ZONE 1 MUST BE PLANTED WITH NEW OR EXISTING NATIVEMATERIALS. ONE HUNDRED PERCENT OF THE DISTURBED AREAS OF ZONE 1 MUST BEPLANTED WITH A GROUND COVER OF NATIVE RIPARIAN SEDGES, FORBS AND GRASSESSUITED FOR THE AREA. IN ADDITION, A MINIMUM OF ONE SHRUB FOR EVERY TEN LINEARFEET AND ONE TREE FOR EVERY 30 LINEAR FEET OF THE WATERCOURSE IS REQUIRED.TOTAL LINEAR FEET OF ZONE 1 WATERCOURSE SETBACK AT PARK 1 = 822 LF-REQUIRED: 83 TOTAL SHRUBS, 28 TOTAL TREES-PROVIDED: 83 TOTAL SHRUBS, 28 TOTAL TREESZONE 2 REQUIRED & PROVIDED: DISTURBED AREAS OF ZONE 2 MUST BE PLANTED WITHNEW OR EXISTING NATIVE GRASSES SUITED FOR THE AREA.OverallSubdivisionPlanL 00080400160N1L0001" = 80'-0"Overall Subdivision Plandesign5la.com406.587.4873dateissuedrawn by:checked by:filename:z:\nwb west park neighborhood\autocad\01_sheets\norton west park-parks-ph1\l000_west-park-parks_landscape_parks-ph1.dwg West Park Phase 1 Park Plan Bozeman, Montana KHM/HU TMS 05/06/22Prelim Plat09/02/22Prelim Plat RC11/11/22Prelim Plat RC01/03/23InfrastructureVICINITY MAPPROJECT SITEPARK PLANSHEET 1/L100& 1/L300PARK PLANSHEET 1/L101& 1/L301PARK PLANSHEET 1/L102& 1/L302PARK PLANSHEE 1/L103& 1/L303PARK PLANSHEET 2/L103& 2/L303VAUGHN DRIVEW BABCOCK STS LAUREL PKWY N COTTONWOOD RDPHASING NOTE:IMPROVEMENTS FOR THE PARK ARE PLANNED TO BE COMPLETED IN TWOPHASES. A DETAILED PHASING PLAN IS PROVIDED WITHIN THE PARKSMASTER PLAN ON PAGE #6. ALL PARK IMPROVEMENTS WILL BE FINANCIALLYGUARANTEED BY THE OWNER AT THE TIME OF FINAL PLAT.THE PHASE 1 PARK PLANS SERVE AS CONSTRUCTION DRAWINGS FOR THEPHASE 1 PARK IMPROVEMENTS.THE PHASE 2 PARK IMPROVEMENTS ARE SHOWN CONCEPTUALLY ON THISSHEET HIGHLIGHTED IN BLUE. CONSTRUCTION DRAWINGS FOR THE PHASE2 PARK IMPROVEMENTS WILL BE PROVIDED IN THE FUTURE WITH THEDEVELOPMENT OF THE PHASE 2 SITE PLAN (BLOCK 2 LOT 2). IF THESUBDIVISION PHASING PLAN CHANGES, OWNERSHIP WILL REEVALUATE THESCHEDULE OF PARK IMPROVEMENTS IN CONJUNCTION WITH THE PHASEDSITE DEVELOPMENT.