Loading...
HomeMy WebLinkAbout037_A2.4 BUILDINGS 3-6 - FOUNDATION PLAN1A4.13A4.15A4.1F.D.SLOPE SLAB TO FLOOR DRAINSLOPE SLAB TO DRAIN IN ADA BATH12' - 10 1/2"3' - 5"4' - 4 1/2"24' - 0 1/4"1' - 2"4' - 6 1/2"4' - 1 1/4"10' - 0 1/4"20' - 3 3/4"20' - 3 3/4"10' - 0 1/4"7' - 1 1/2"13' - 11 3/4"17' - 6 3/4"F.D.SLOPE SLAB TO FLOOR DRAINSLOPE SLAB TO DRAIN IN ADA BATHF.D.12' - 10 1/2"3' - 5"4' - 4 1/2"24' - 0 1/4"1' - 2"4' - 6 1/2"4' - 1 1/4"7' - 1 1/2"13' - 11 3/4"17' - 6 3/4"17' - 6 3/4"21' - 1 1/4"40' - 0"22' - 0"18' - 0"69' - 0"3' - 6"62' - 0"3' - 6"31' - 0"31' - 0"40' - 0"22' - 0"18' - 0"69' - 0"34' - 6"34' - 6"7' - 0 1/2"16' - 11 1/2"10' - 6"10' - 6"16' - 11 1/2"7' - 0 1/2"BLOCK OUTBLOCK OUTBLOCK OUTBLOCK OUTSLOPE SLAB 1/8": 1'-0"FLAT SLABSLOPE SLAB 1/8": 1'-0"UFER GROUNDUFER GROUNDAT.O.W. = 100'-0"T.O.W. = 100'-0"1S3.12S3.1TYP111S3.11ABD5S3.11/8": 1'-0"1/8": 1'-0"1/8": 1'-0"1/8": 1'-0"F.D.1/8": 1'-0"1/8": 1'-0"1/8": 1'-0"1/8": 1'-0"BE9S3.121/8": 1'-0"1/8": 1'-0"1/8": 1'-0"1/8": 1'-0"1/8": 1'-0"1/8": 1'-0"1/8": 1'-0"1/8": 1'-0"6S3.113BCT.O. SLAB = 100'-0"4" CONCRETE SLAB W/ 6X6 W2.0 X W2.0 WWMSEE DETAIL 4/S3.1FLAT SLABT.O. SLAB = 100'-0"4" CONCRETE SLAB W/ 6X6 W2.0 X W2.0 WWMSEE DETAIL 4/S3.13S3.1BA1S3.13T.O.F. = 96'-0"T.O.F. = 96'-0"T.O.F. = 96'-0"T.O.F. = 96'-0"T.O.F. = 96'-0"T.O.W. = 100'-0"T.O.W. = 100'-0"T.O.W. = 100'-0"T.O.F. = 96'-0"T.O.W. = 100'-0"T.O.W. = 100'-0"T.O.W. = 99'-4"T.O.W. = 98'-11"T.O.W. = 100'-0"T.O.W. = 98'-11"T.O.W. = 99'-4"T.O.W. = 100'-0"T.O.W. = 100'-0"T.O.F. = 96'-0"T.O.F. = 96'-0"18S3.11S3.18S3.11S3.1AB1111S3.18S3.1111BBCB2S3.1TYP1 1 1126S3.11S3.1A1S3.113A31S3.19S3.1E8S3.1GENERAL NOTES1. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND JOB SITE CONDITIONS BEFORE COMMENCING WORK AND SHALL REPORT ANY DISCREPANCIES TO THE ARCHITECT.2. GENERAL CONTRACTOR TO COORDINATE ARCHITECTURAL DRAWINGS WITH MECHANICAL, ELECTRICAL, AND PLUMBING.APPLICABLE CODES:2018 INTERNATIONAL BUILDING CODE 2018 UNIFORM PLUMBING CODE 2018 INTERNATIONAL MECHANICAL CODE 2017 NATIONAL ELECTRIC CODE 2018 INTERNATIONAL FUEL GAS CODE2018 INTERNATIONAL ENERGY CONSERVATION CODEDESIGN CRITERIASEISMIC ZONE D0FRAMING NOTES1. USE (3) 2X6 POSTS U.N.O.2. USE (2) 2X10 HEADERS U.N.O.(406) 552-4490www.blackmountainarch.comBLACK MOUNTAIN ARCHITECTURE 2020A2.4FOUNDATIONPLANSWISS PLAZA DUPLEXBUILDING XXXXX N. 27th AVENUE, BOZEMAN, MONTANAPERMIT SETJULY 13, 2022200241/4" = 1'-0"1FOUNDATION