Loading...
HomeMy WebLinkAbout003_L1.0SitePlan4 L1.5 4 L1.4 5 L1.4 CF CRUSHER FINES C PUMP TRACK CLAY SA SHRUB AREA / CRUSHED AGGREGATE MULCH - 3" DEPTH ECOBLOCK EXISTING FENCING PROPOSED FENCING LIMITS OF DISTURBANCE ALTERNATE BID - UPPER MOUNTAIN BIKE START HILL EXISTING DECIDUOUS TREE EXISTING CONIFEROUS TREE EXISTING SHRUB 0 30 SCALE: 1" = 30' 601530 UULC FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTION----SITE PLANWESTLAKE PARK IMPROVEMENTSWESTLAKE PARK, BLOCK 1, WESTLAKE'S FOURTH SUBDIVISIONBOZEMAN, MONTANAL1.0 EJS18098_18_LS PROD.DWGALM08/03/211ST SP SUBMITTAL09/27/2212/27/22----2ND SP SUBMITTAL3RD SP SUBMITTAL------18098.18SITE PLAN NOTES 1.THE EXISTING BMX TRACK IS TO REMAIN IN PLACE WITH NO WORK TO OCCUR WITHIN THE EXISTING TRACK AT THIS TIME. 2.THE EXISTING MOUNTAIN BIKE COURSE WILL BE RE-GRADED AND RE-LOCATED AS SHOWN ON THE PLANS. 3.FINAL JUMP GRADES OF THE COURSE TO BE COMPLETED BY SWMMBA AND THEIR TEAM. GRADING SHOWN IS APPROXIMATE AND FOR QUANTITY PURPOSES OF PERMITTING ONLY, NOT FOR FINAL CONSTRUCTION. 4.PLAZA IS PROPOSED ALL NEW SURFACE. FINAL COLOR AND LOCATION OF CONCRETE TO ASPHALT PATH CHANGE TO BE DETERMINED DURING FINAL DESIGN. 5.EXISTING STORM WATER SYSTEM TO REMAIN AND BE PRESERVED. 6.EXISTING SIDEWALK ALONG 5TH TO BE SAVED AND PROTECTED DURING CONSTRUCTION. 7.EXISTING POWER SERVICE TO BE RE-LOCATED DURING CONSTRUCTION OF NEW MOUNTAIN BIKE COURSE. 8.EXISTING CHILDREN'S GARDEN TO BE PRESERVED AND PROTECTED DURING CONSTRUCTION. LEGEND p:\18098_18_westlake_bmx_track_landscape_&_design\CADD_C3D\production_dwg\18098_18_LS PROD.dwg, SITE PLAN, 12/27/2022 2:34:12 PM, amartoncik, 1:1