HomeMy WebLinkAbout004_Traffic Impact Study NEST BREWERY DEVELOPMENT TRAFFIC IMPACT STUDY 21391 Mr. Alex Edwards, PE TD&H Engineering 234 East Babcock Street, Suite 3 Bozeman, MT 59715 March 2022 Nest Brewery TIS i TABLE OF CONTENTS INTRODUCTION ..................................................................................................................................... 1 SITE LOCATION & DESCRIPTION ............................................................................................................. 1 SITE DEVELOPMENT PLAN ....................................................................................................................... 1 EXISTING CONDITIONS .......................................................................................................................... 1 Streets .............................................................................................................................................. 1 Intersections ...................................................................................................................................... 5 Bicycle/Pedestrian Facilities ................................................................................................................ 5 Traffic Volumes.................................................................................................................................. 6 Intersection Capacity ......................................................................................................................... 6 Crash History .................................................................................................................................... 6 TRIP GENERATION .................................................................................................................................. 9 TRIP DISTRIBUTION ............................................................................................................................... 10 TRAFFIC ASSIGNMENT .......................................................................................................................... 10 TRAFFIC IMPACTS ................................................................................................................................. 11 Traffic Volumes................................................................................................................................ 11 Intersection Capacity ....................................................................................................................... 11 Traffic Signal Warrants .................................................................................................................... 11 Site Access Location Deviation ......................................................................................................... 14 Multi-Modal Analysis ....................................................................................................................... 15 Parking Analysis .............................................................................................................................. 15 CONCLUSIONS & RECOMMENDATIONS .............................................................................................. 15 Conclusions .................................................................................................................................... 15 Recommendations ........................................................................................................................... 16 APPENDICES APPENDIX A – TRAFFIC COUNT DATA APPENDIX B – CAPACITY CALCULATIONS – EXISTING CONDITIONS (2021) APPENDIX C – CAPACITY CALCULATIONS – DESIGN YEAR (2024) APPENDIX D – TRAFFIC SIGNAL WARRANT WORKSHEETS APPENDIX E – MULTI-MODAL ANALYSIS Nest Brewery TIS ii LIST OF TABLES TABLE 1: CRASH HISTORY – FREQUENCY AND SEVERITY STATISTICS ....................................................... 8 TABLE 2: CRASH HISTORY – COLLISION TYPE .......................................................................................... 9 TABLE 3: TRIP GENERATION SUMMARY ................................................................................................. 10 LIST OF FIGURES FIGURE 1: STUDY AREA .......................................................................................................................... 2 FIGURE 2: SITE PLAN .............................................................................................................................. 3 FIGURE 3: STREET & INTERSECTION CHARACTERISTICS ........................................................................... 4 FIGURE 4: EXISTING CONDITIONS (2021) TRAFFIC VOLUMES ................................................................. 7 FIGURE 5: TRIP DISTRIBUTION & TRAFFIC ASSIGNMENT SUMMARY ....................................................... 12 FIGURE 6: DESIGN YEAR (2024) TRAFFIC PROJECTIONS ........................................................................ 13 FIGURE 7: INTERSECTION SIGHT DISTANCE (ISD) AT GARAGE ACCESS ................................................. 14 Nest Brewery TIS 1 INTRODUCTION This traffic impact study (TIS) assesses the traffic-related impacts associated with the proposed Nest Brewery Development in Bozeman, Gallatin County, Montana on the surrounding transportation system. This report also provides recommendations to mitigate any such impacts. The methodology and analysis procedures used in this study employ the latest technology and nationally accepted standards in the areas of site development and transportation impact assessment. Recommendations made in this report are based on these accepted standards and professional judgement. SITE LOCATION & DESCRIPTION The Nest Brewery development site is located on the southwest corner of the intersection of North Wallace Avenue and East Tamarack Street. It is bordered by East Tamarack Street to the north, North Wallace Avenue to the east, Lattice Materials to the west, and East Aspen Street to the south. Figure 1 on the following page depicts the study area. SITE DEVELOPMENT PLAN The Nest Brewery development site has a total buildable area of 50,903 square feet and the development plan proposes construction of seven total buildings and a parking structure. Four of the buildings will contain 11 total two-story rowhomes. The other three buildings are designed as follows: one building has commercial use on the first floor with four studio apartments on the second floor, one building will have first-floor commercial use with apartments on the second, third, and fourth floors (22 total apartments), and the final building has five live-work units across the first and second floors, with 16 studio apartments across the second, third, and fourth floors. In total, the residential unit breakdown is as follows: 26 studio apartments, five live-work units, 13 one-bedroom flats, three two-bedroom flats, and 11 rowhomes (58 total housing units). In addition to the residential units, 3,395 square feet of live-work commercial space and 8,045 square feet of commercial tenant space is proposed. The commercial tenant space will likely include small retail, office, and artisan spaces, as well as a laundromat and a small market/deli. The development is anticipated to be completed by the fall of 2024. Access to the site will be provided via a parking garage located on the northern side of the site, with the entrance proposed on East Tamarack Street. The proposed structure will provide approximately 200 spaces. Figure 2 on page 3 shows the site plan for the ground level of the development. EXISTING CONDITIONS Streets Figure 3 on page 4 shows the Montana Department of Transportation (MDT) street classifications and speed limits on study area streets. The City of Bozeman classifies the streets slightly differently in its Transportation Master Plan (TMP); North Wallace Avenue is considered a local street instead of a major collector, North Rouse Avenue is considered a principal arterial instead of a minor arterial, and East Oak Street is considered a principal arterial instead of a local street. East Main Street has a four-lane section with two travel lanes in each direction and parallel parking on both sides. East Mendenhall Street becomes a westbound one-way street with two travels lanes and parallel parking on both sides at its intersection with North Rouse Avenue. North Rouse Avenue has a center two-way left-turn lane (TWLTL) north of East Peach Street, with parallel parking only allowed along the east side of the street between East Peach Street and East Main Street, and a half-block section of parallel parking allowed along the west side south of East Lamme Street. All other streets have two-lane sections. North Broadway Avenue and North Wallace Avenue each provide parallel parking on both sides of the street, while East Peach Street and East Tamarack Street each permit parallel parking on the south side only. Nest Brewery TIS 2 Figure 1: Study Area Nest Brewery TIS 3 Figure 2: Site Plan Nest Brewery TIS 4 Figure 3: Street & Intersection Characteristics Nest Brewery TIS 5 Two-lane collector street standards in the City of Bozeman TMP specifies 47 feet from face of curb to face of curb, including an 8-foot parking lane, a 5-foot bike lane, and a 10-foot driving lane in each direction with a 1-foot centerline stripe. A 14-foot boulevard and a 6-foot sidewalk are also listed. East Peach Street (30 feet), East Tamarack Street (35 feet), and North Broadway Avenue (35 feet) are all considered collectors by the City of Bozeman and do not meet the width guideline or include all the minimum features. Two-lane local street standards in the City of Bozeman specifies 30 feet from face of curb to face of curb, including a 7-foot parking lane and 8-foot driving lane on each side, as well as an 8.5-foot boulevard and a 5-foot sidewalk. North Wallace Avenue (32 feet) is considered a local street by the City of Bozeman and does currently meet the width guideline and provides all the minimum features. However, it does not meet the minimum guidelines for a collector, as it is classified by MDT. Intersections Figure 3 on the previous page also shows the traffic control utilized at each study area intersection. Additional intersection characteristics are described below. The East Oak Street/North Rouse Avenue intersection has auxiliary left-turn lanes on all approaches, as well as separate southbound thru and right-turn lanes. The signal operates with a protected/permissive phase for northbound left turns with an eastbound right-turn overlap phase. The intersections of North Rouse Avenue with East Tamarack Street and East Peach Street have dedicated northbound and southbound left-turn lanes, as well as separate left-, thru, and right-turn lanes on the east and west legs. The signal operates with protected/permissive phasing for all left turns. The East Mendenhall Street/North Rouse Avenue intersection has dedicated left-turn lanes on the north and south legs, as well as separate southbound thru and right-turn lanes. The westbound approach has a right-turn lane, a thru lane, and a shared thru/left-turn lane with two receiving lanes exiting the intersection westbound. The traffic signal operates with protected/permissive phasing for northbound and southbound left turns. The East Main Street/North Rouse Avenue intersection has a dedicated southbound left-turn lane and shared lanes for all other movements, with two thru lanes on East Main Street in each direction. The signal operates with protected/permissive phasing for southbound left turns only. The remaining study intersections have no auxiliary turn lanes, and the signal at the East Main Street/North Broadway Avenue intersection operates with two phases with permissive phasing for all turning movements. Bicycle/Pedestrian Facilities East Tamarack Street has a westbound bike lane and eastbound painted “sharrows” east of North Rouse Avenue. North Rouse Avenue and East Oak Street have bike lanes in both directions. East Peach Street and North Wallace Avenue are dedicated as bike routes with sharrows and there are no dedicated bicycle facilities on North Broadway Avenue or East Main Street. There is sidewalk along all streets in the study area except for the east side of North Wallace Avenue north of East Tamarack Street and an approximately 200-foot section along the east side of North Broadway Avenue south of its intersection with East Avocado Street. There is also sidewalk missing along the northeastern side of East Avocado Street. All sidewalk in the study area is approximately 5 feet wide, which is adequate for a local street. However, City of Bozeman collector standards specify a 6-foot sidewalk. Sidewalk in the downtown area is approximately 6 feet wide with no boulevard. Nest Brewery TIS 6 Traffic Volumes Weekday AM and PM peak hour turning movement counts were collected for study area intersections in support of multiple proposed projects in the area. As a result, counts were collected on several different days during late summer and early winter of 2021. Existing Conditions (2021) traffic volumes for this study are based on those counts. The traffic data was collected using Miovision Scout video-based systems. In general, the weekday AM and PM peak hour periods were found to occur from 8:15 to 9:15 AM and 4:30 to 5:30 PM. Raw count data was adjusted for seasonal variation using MDT seasonal adjustment factors. Figure 4 on the following page summarizes the calculated Existing Conditions (2021) peak hour turning movement volumes for the AM and PM peak hours. Detailed traffic count data worksheets are included in Appendix A. Intersection Capacity Intersection capacity calculations for the Existing Conditions (2021) scenario were performed for the study area intersections using Synchro, Version 10, based on the Highway Capacity Manual, 6th Edition (Transportation Research Board, 2016). Level of service (LOS) is defined as a quality measure describing operational conditions within a traffic stream, generally in terms of such service measures as speed, travel time, freedom to maneuver, traffic interruptions, comfort, and convenience. LOS is a quantitative measure of the performance of an intersection with values ranging from LOS A, indicating good operation and low vehicle delays, to LOS F, which indicates congestion and longer vehicle delays. LOS C is typically considered a minimum acceptable threshold for operations in Montana-based communities, though exceptions are made in certain cases. The results of the Existing Conditions (2021) intersection capacity calculations showed that all study area intersections operate at LOS C or better during the AM and PM peak hours. Projected 95th percentile queuing is minimal at the unsignalized intersections and moderate on North Rouse Avenue, East Main Street, and East Oak Street. Figure 4 on the following page also shows the Existing Conditions (2021) LOS results at each intersection. A detailed capacity summary table and capacity calculation worksheets for each of the study area intersections can be found in Appendix B. Crash History Historical crash data was obtained from MDT for the 5-year period from January 1, 2014 through December 31, 2018. Due to MDT’s declining availability to obtain City of Bozeman crash data during 2018-2019, for the purpose of this study, crash data from January 1, 2014 through December 31, 2018 was evaluated. The data was analyzed for the purposes of calculating intersection crash and severity rates and evaluating collision type trends. Four of the study area intersections – East Oak Street/North Rouse Avenue, East Tamarack Street/North Wallace Avenue, East Peach Street/North Rouse Avenue, and East Peach Street/North Wallace Avenue – did not have any crashes recorded. Tables 1 and 2 on pages 8 and 9, respectively, illustrate the results of the historical crash analysis. Intersection crash rates were calculated on the standard basis of crashes per million vehicles entering (MVE) for each intersection. The MVE metric was estimated based on 2021 and 2022 peak hour traffic counts and published historical ADT volumes from the MDT website. Crash rates for the study area intersections ranged from 0.00 crashes/MVE to 0.47 crashes/MVE. As a means of evaluating the historical crash frequency rates, Sanderson Stewart calculated expected rates using the predictive crash rate formulas in the American Association of State Highway Transportation Officials (AASHTO) Highway Safety Manual (HSM). The process involves calculating the number of crashes predicted in a year based on traffic demand (AADTs) and various physical and traffic environment-based conditions such as lane configurations, traffic signal phasing, and approach speeds. The calculations result in a crashes-per-year prediction. Sanderson Stewart then back-calculated a frequency rate on the basis of MVE for the sake of comparison with the actual historical crash rate. The results of the calculations for this study Nest Brewery TIS 7 Figure 4: Existing Conditions (2021) Traffic Volumes Nest Brewery TIS 8 showed that the historical crash frequency was equal to or lower than the predicted crash rate for all study area intersections. The HSM rate predictions and 5-year crash totals for each intersection are summarized in Table 1 below. Severity index is defined as the weighted average by crash severity, including fatality, injury, and property damage only (PDO) crashes. The highest severity index was 2.00 at the intersection of East Tamarack Street/North Rouse Avenue due to the intersection having 1 of 2 crashes resulting in an injury. Severity index calculation results are also shown in Table 1 below. Sanderson Stewart performed an analysis of collision classification to determine if any patterns could be identified. Table 2 on the following page illustrates the results of the types of crashes in the study area. The intersection of East Main Street/North Rouse Avenue had 6 of 14 (43%) crashes occur due to rear-end collisions. Rear-end collisions commonly occur at signalized intersections because the signalized control is dynamic, thereby requiring the drivers to recognize and react to changing conditions in real time. High speeds approaching signalized intersections allow drivers less response time, which creates an opportunity for increased rear-end collisions. Another factor that contributes to rear end collisions is a “yellow change interval” that is too short for the prevailing operating speeds in that corridor. Based on the application of yellow change interval formulas from the Institute of Transportation Engineers (ITE) Traffic Engineering Handbook with assumed 25 mph thru-movement operating speeds, it was calculated that the “design” yellow change intervals for all approaches at the Main Street/Rouse Avenue intersection should be 3.0 seconds. The existing signal timing plan uses a change interval of 3.0 seconds. Another factor that typically contributes to a high occurrence of rear-end crashes includes a lack of dedicated turn lanes where high turning movement demands are prevalent. The intersection has a dedicated southbound left-turn lane and shared lanes for all other movements, which may contribute to the recorded rear-end crashes. The intersection of East Main Street/North Rouse Avenue also had 3 of 14 (27%) and 2 of 14 (14%) crashes involving right- angle and left turning (one same direction and one opposite direction) crashes, respectively. Right-angle and left turning crashes often occur at signalized intersections without protected left-turn phasing. The signal operates with protected/permissive phasing for southbound left turns and permissive phasing for all other approaches. Table 1: Crash History – Frequency and Severity Statistics PDO Injury Fatality Average Crash Frequency (Crash/Yr) Crash Rate (Crash/ MVE) Severity Index Predicted Average Crash Frequency (Crash/Yr) Predicted Crash Rate (Crash/ MVE) Oak St/Rouse Ave 13942 0 0 0 0 0.00 0.00 0.00 1.86 0.37 Tamarack St/Rouse Ave 12349 2 1 1 0 0.67 0.09 2.00 2.05 0.45 Tamarack St/Wallace Ave 4422 0 0 0 0 0.00 0.00 0.00 0.89 0.55 Peach St/Rouse Ave 12764 0 0 0 0 0.00 0.00 0.00 2.19 0.47 Peach St/ Wallace Ave 7124 0 0 0 0 0.00 0.00 0.00 1.2 0.46 Mendenhall St/Rouse Ave 10370 4 4 0 0 1.33 0.21 1.00 1.64 0.43 Main St/Broadway Ave 15210 2 1 1 0 0.67 0.07 2.00 1.8 0.32 Main St/Rouse Ave 16323 14 12 2 0 4.67 0.47 1.29 2.97 0.50 1 Daily Entering Volume (DEV) estimated from 2021 and 2022 peak hour counts and 2016 through 2018 MDT published ADTs 2 Crashes reported from January 1, 2014 to December 31, 2018 3 Crash rates expressed as crashes per million vehicles entering (MVE) ⁴ Rates calculated using Highway Safety Manual (HSM) 1st Edition predictive methodology using SPICE tool HSM Predictions⁴ Intersection Crash Data3Crash Type 2016-2018 DEV1 Reported Crashes2 Nest Brewery TIS 9 No other crash trends were noted at the remaining intersections with recorded crashes. It is important to note that all of the previous evaluations are speculative, and more detailed information about individual crashes would be needed to determine exact causes for each collision. TRIP GENERATION This study utilized Trip Generation, 11th Edition, published by the Institute of Transportation Engineers (ITE), which is the most widely accepted source in the United States for determining trip generation projections. These projections are used to analyze the impacts of a new development on the surrounding area. For the purposes of this study, Single-Family Attached Housing (Land Use Code 215), Multifamily Housing (Low-Rise) (Land Use Code 220), Small Office Building (Land Use Code 712), and Fast Casual Restaurant (Land Use Code 930) were utilized to project trip generation for the Nest Brewery development. Table 3 on the following page illustrates the results of the trip generation calculations for this site. At full buildout, the Nest Brewery development is projected to generate 681 gross average weekday trips, with 33 trips (14 entering/19 exiting) generated during the AM peak hour and 69 trips (38 entering/31 exiting) generated during the PM peak hour. Trip generation projections provide an estimate of the total number of trips that would be generated by a proposed development. However, in order to estimate the net number of new trips made by personal vehicles external to the site, adjustments must often be made to account for internal capture trips, pass-by trips, and trips made by alternate modes. Internal capture (IC) trips are trips that do not have origins or destinations external to a project site. Since IC trips occur internally, they do not have an impact on external traffic operations. IC trips most often occur in mixed-use developments where residential, commercial, and office-related land uses exhibit a high rate of internal trip exchange and were therefore calculated among all uses on this site. Pass-by trips are trips that are made as intermediate stops on the way from a point of origin to a primary trip destination. Pass- by trips are attracted from traffic “passing by” on an adjacent street that offers direct access to that site. Pass-by trips are primarily attracted by commercial type land uses such as drive-through restaurants, convenience markets, and gas stations, and were not calculated for this site. A portion of the external trips generated by the Nest Brewery development could be made by alternate modes (walking, biking, and transit), thereby reducing vehicular trips generated. There are bike lanes, sidewalks, and/or multi-use paths Table 2: Crash History – Collision Type Rear End Right Angle LT, OD LT, SD SS, SD Backing Fixed Object Pedestrian Total Oak St/Rouse Ave 0 Tamarack St/Rouse Ave 1 1 2 Tamarack St/Wallace Ave 0 Peach St/Rouse Ave 0 Peach St/ Wallace Ave 0 Mendenhall St/Rouse Ave 1 1 1 1 4 Main St/Broadway Ave 1 1 2 Main St/Rouse Ave 6 3 1 1 1 1 1 14 Collision Type Nest Brewery TIS 10 accessing the site from most directions. However, alternate mode trips were conservatively assumed to be negligible for the purposes of this study. TRIP DISTRIBUTION A trip distribution is an estimate of site-generated trip routing, which can be determined by several methods such as computerized travel demand models, calculation of travel time for various available routes, and/or simple inspection of existing traffic patterns within the project area. For this study the trip distribution scheme was calculated using patterns collected from the Existing Conditions (2021) traffic volumes, as well as referencing distributions previously calculated for other developments in the same study area. Figure 5 on page 12 presents the calculated trip distribution scheme for the Design Year (2024) scenario. TRAFFIC ASSIGNMENT Traffic assignment is the procedure whereby site-generated vehicle trips are assigned to study area streets, intersections, and site access driveways based on the calculated trip distribution and the physical attributes of the development site. Using this approach, the primary site-generated trips for the Nest Brewery development were assigned to the study area roadway network. The results of the traffic assignment exercise for the AM and PM peak hours are also illustrated in Figure 5. Table 3: Trip Generation Summary Intensity Units total enter exit total enter exit total enter exit Single-Family Attached Housing1 7 Dwelling Units 50 25 25 3 1 2 4 2 2 6 2 4 0 0 0 0 0 0 Multifamily Housing (Low-Rise)2 51 Dwelling Units 344 172 172 20 5 15 26 16 10 33 11 22 0 0 0 4 2 2 Small Office Building3 4.038 1000 SF GFA 58 29 29 7 6 1 9 3 6 22 12 10 0 0 0 0 0 0 Fast Casual Restaurant4 2.357 1000 SF GFA 229 115 114 3 2 1 30 17 13 49 30 19 0 0 0 4 2 2 681 341 340 33 14 19 69 38 31 110 55 55 0 0 0 8 4 4 571 286 285 33 14 19 61 34 27 (1) Single-Family Attached Housing - Land Use 215*Units = Dwelling Units Average Weekday:Average Rate = 7.20 (50% entering/50% exiting) Peak Hour of the Adjacent Street, One Hour between 7 and 9 AM: Average Rate = 0.48 (31% entering/69% exiting) Peak Hour of the Adjacent Street, One Hour between 4 and 6 PM: Average Rate = 0.57 (57% entering/43% exiting) (2) Multifamily Housing (Low-Rise) - Land Use 220*Units = Dwelling Units Average Weekday:Average Rate = 6.74 (50% entering/50% exiting) Peak Hour of the Adjacent Street, One Hour between 7 and 9 AM: Average Rate = 0.40 (24% entering/76% exiting) Peak Hour of the Adjacent Street, One Hour between 4 and 6 PM: Average Rate = 0.51 (63% entering/37% exiting) (3) Small Office Building - Land Use 712*Units = 1000 SF GFA Average Weekday:Average Rate = 14.39 (50% entering/50% exiting) Peak Hour of the Adjacent Street, One Hour between 7 and 9 AM: Average Rate = 1.67 (82% entering/18% exiting) Peak Hour of the Adjacent Street, One Hour between 4 and 6 PM: Average Rate = 2.16 (34% entering/66% exiting) (4) Fast Casual Restaurant - Land Use 930*Units = 1000 SF GFA Average Weekday:Average Rate = 97.14 (50% entering/50% exiting) Peak Hour of the Adjacent Street, One Hour between 7 and 9 AM: Average Rate = 1.43 (50% entering/50% exiting) Peak Hour of the Adjacent Street, One Hour between 4 and 6 PM: Average Rate = 12.55 (55% entering/45% exiting) *Trip Generation, 11th Edition, Institute of Transportation Engineers, 2021 **Trip Generation Handbook, 3rd Edition , Institute of Transportation Engineers, 2017 Total Buildout New External Trips Total Buildout Internal Capture Trips Independent Variable AM Peak Hour Total Buildout Gross Trips Full Buildout Land Use Average Weekday PM Peak Hour Internal Capture Trips** Internal Capture Trips** Internal Capture Trips** Internal Capture Trips** Nest Brewery TIS 11 TRAFFIC IMPACTS Traffic Volumes For the purposes of this study, and based on information from the Client, a buildout year of 2024 was utilized for the purposes of calculating future traffic projections for the Nest Brewery development. In addition to site-generated trips, background traffic volumes are also expected to increase for study area streets and intersections due to general growth in the Bozeman area. To account for that growth, projected volume conditions from the Bozeman TMP and historical MDT traffic data over the past 5 years were analyzed. It was seen that the traffic volumes have fluctuated widely over the past 5 years, with positive and negative growth rates dependent on the year. An annual growth rate of 2.5% was selected to model ambient growth based on historical traffic data and growth rates used for another area study. Additionally, other potential developments in the area are expected to add trips to the street network within the Nest Brewery development’s buildout timeline, including Phase 1 of the Yard (located on the former Idaho Pole Property) and the Wildlands development (located at the East Peach Street/North Wallace Avenue intersection). Trip projections from these developments were also included in the background volumes. Design Year (2024) traffic projections for the Nest Brewery development were then calculated by combining existing traffic volumes with anticipated background growth, other area developments, and site-generated traffic assignments. Figure 6 on page 13 illustrates the resulting AM and PM peak hour traffic volume projections. Intersection Capacity Intersection capacity calculations were performed for the Design Year (2024) scenario based on the AM and PM peak hour traffic volume projections presented in Figure 6 on page 13. Peak hour factors (PHFs) for the design year were conservatively assumed to be 0.92 for all intersections, as that is the default value utilized by the HCM. The assumed values were utilized so as not to overestimate future congestion in the study area. Figure 6 also shows the Design Year (2024) LOS results at each intersection. The Design Year (2024) capacity calculation results were very similar to the Existing Conditions (2021) results, with all intersections and approaches projected to continue to operate at LOS C or better during both peak hours. The parking garage access is projected to operate at LOS B or better. A capacity summary table and detailed capacity calculation worksheets for the Design Year (2024) scenario are included in Appendix C. Traffic Signal Warrants Traffic signal warrants were evaluated at the North Wallace Avenue/East Tamarack Street and North Wallace Avenue/East Peach Street intersections using criteria outlined in the Manual on Uniform Traffic Control Devices (MUTCD) for the Existing Conditions (2021) and Design Year (2024) traffic volume scenarios. The MUTCD presents several warrants that can be considered based on traffic volumes, school crossings, crash history, and others. For the purposes of this analysis, all but Warrants 5 and 9 (School Crossing and Intersection Near a Grade Crossing) were evaluated. Those warrants were not evaluated because there are no schools or applicable railroad crossings near the intersections. Additionally, satisfaction of the Peak Hour warrant alone should not be considered as warranting a signal, as it is primarily meant for application at office complexes, manufacturing plants, or other high-occupancy vehicle facilities that attract or discharge large numbers of vehicles over a short time. It was found that none of the warrants were close to being met at either intersection for the Existing Conditions (2021) or Design Year (2024) traffic volume scenarios. Traffic signal warrant worksheets can be found in Appendix D. Nest Brewery TIS 12 Figure 5: Trip Distribution & Traffic Assignment Summary Nest Brewery TIS 13 Figure 6: Design Year (2024) Traffic Projections Nest Brewery TIS 14 Site Access Location Deviation Access to the on-site parking garage off East Tamarack Street is located approximately 185 feet west from the center of the East Tamarack Street/North Wallace Avenue intersection. This is less than the 330 feet required in the City’s Uniform Development Code (UDC) (Table 38.400.090-1) for full access spacing on collector streets, as East Tamarack Street is classified adjacent to the site. The UDC requires a minimum 150 feet of separation. A deviation is requested per the UDC, Section 38.400.090.H. Projected 95th percentile queuing on the west leg of the East Tamarack Street/North Wallace Avenue intersection is 40 feet during the AM peak hour and 30 feet during the PM peak hour for the Design Year (2024) scenario. This equates to up to 2 vehicles and would not interfere with operations at the proposed garage access location on East Tamarack Street. Intersection Sight Distance (ISD) was evaluated at the proposed approach location using criteria from the MDT Traffic Engineering Manual, Chapter 28.9.2, and a 30-mph design speed was utilized based on the 25-mph speed limit. Figure 7 below shows the right- and left-turning sight triangles. A sight distance of 335 feet is required to the west and 200-250 feet is required to the east to the stop bars of the all-way stop-controlled intersection of East Tamarack Street/North Wallace Avenue for a left-turn movements out of the parking lot access. For an egress right-turn movement, 290 feet is required to the west. There do not appear to be any vision restrictions within the sight triangles. Clear sight triangles should be evaluated during construction. Figure 7: Intersection Sight Distance (ISD) At Garage Access Nest Brewery TIS 15 Multi-Modal Analysis Bicycle and pedestrian connectivity was evaluated using City of Bozeman data. In the study area, North Wallace Avenue and East Peach Street are designated as bike routes with sharrows, and East Tamarack Street is designated as a bike route with eastbound sharrows and a westbound striped bike lane. Based on research data provided by the Oregon DOT and the Federal Highway Administration (FHWA) for bike separation facilities, an ADT of 3,000 is the maximum vehicular traffic threshold for shared lanes/sharrows on a 25-mph facility before a bike lane should be considered. At the North Wallace Avenue/East Tamarack Street and North Wallace Avenue/East Peach Street intersections, all Existing Conditions (2021) ADTs were below the 3,000 ADT threshold. The Design Year (2024) ADTs, however, are projected to eclipse the 3,000-vehicle threshold on all legs except for East Tamarack Street east of North Wallace Avenue and North Wallace Avenue south of East Peach Street. Whether most legs reach the threshold is highly dependent on construction of the nearby Yard site, so additional analysis should be performed in the future depending on the development progress of the Yard to determine if separated bike lanes should be considered to encourage bicycle traffic in a safe environment. Graphs from Oregon DOT and FHWA used in this analysis can be found in Appendix E. Parking Analysis Studies published by the National Association of City Transportation Officials (NACTO) and the Transportation Research Board (TRB) state that in an urban setting, 10- and 12-foot vehicle travel lanes are shown to accommodate the same amount of traffic and, according to NACTO, 10-foot lanes are appropriate in urban areas and have a positive impact on a street’s safety by promoting traffic calming. Studies summarize that crash severity lowers with narrower lane widths, but crash frequencies may increase. Adjacent to the site, North Wallace Avenue has an existing cross-section width of approximately 32 feet, with parallel parking permitted on both the east and west sides of the street. This results in an available width of approximately 9 feet per lane when cars are parked on both sides, assuming a local street standard of 7-foot parking lanes. Although this is adequate based on local street standards, North Wallace Avenue operates more as a collector as it is classified by MDT. The current cross-section width on East Peach Street is approximately 30 feet, with parallel parking permitted on the south side of the street only. With cars parked on the south side and assuming an 8-foot parking lane (collector standard), there is a remaining available width of approximately 11 feet per lane. CONCLUSIONS & RECOMMENDATIONS Conclusions The preceding analysis has shown that the Nest Brewery development will generate a moderate volume of new traffic demand for area streets and intersections. Through the planned development, it is estimated that approximately 681 gross new vehicle trips could be generated daily. The development plan proposes construction of multiple buildings to include a parking structure (200 spaces), 58 residential dwelling units, and 11,440 square feet of live-work and tenant commercial space, including retail and office space, a laundromat, and small market/deli. Buildout and occupancy of the site is projected for completion by approximately 2024. The Existing Conditions (2021) traffic scenario analysis showed that all study area intersections currently operate at LOS C or better during both peak periods, with moderate queueing on East Main Street and North Rouse Avenue. Crash data was evaluated at the area intersections and East Main Street/North Rouse Avenue had 6 (43%) reported rear-end collisions and 3 (21%) right-angle crashes during the evaluation period, with the predicted crash rate almost equal to the historical crash rate. Nest Brewery TIS 16 The Design Year (2024) projected intersection capacity results showed that all study area intersections would continue to operate at LOS C or better during both the AM and PM peak hours. The proposed site access location is projected to operate at LOS B or better. Traffic signal warrants were evaluated at the North Wallace Avenue/East Tamarack Street and North Wallace Avenue/East Peach Street intersections and were not close to being met for either the Existing Conditions (2021) or Design Year (2024) scenarios. It is expected that traffic operations will remain satisfactory without the addition of a signal at either intersection. Proposed access to the on-site parking garage is less than the required access spacing for collector streets. However, there are no anticipated queuing, vehicular capacity, or sight triangle issues that are impacted by the location of the garage access on East Tamarack Street. Recommendations The following list of recommendations is based on the analysis results from this study and professional judgment: · Bicycle, sidewalk, and/or multi-use path improvements should be constructed as consistent with recommendations in the Bozeman Transportation Master Plan (2017). · ATDs should be monitored on East Tamarack Street, East Peach Street, and North Wallace Avenue to determine when separated bike lanes may become necessary to encourage bicycle traffic in a safe environment. · The on-site parking garage access approach deviation request should be approved based on the results of the queuing, capacity, and sight distance calculations, which satisfy the UDC, Section 38.400.090.H. · All transportation-related improvements shall be designed in accordance with City of Bozeman and/or MDT standards and the Manual on Uniform Traffic Control Devices (MUTCD). APPENDIX A TRAFFIC COUNT DATA Intersection: Jurisdiction: Project Description: Int. Start Time Right Thru Left U-turn Total Right Thru Left U-turn Total Right Thru Left U-turn Total Right Thru Left U-turn Total Total Factor 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 1.00 1.00 1.00 1.00 0 1.00 1.00 1.00 1.00 0 8:15 AM 31 53 0 0 84 0 46 20 0 66 37 0 44 0 81 0 0 0 0 0 231 8:30 AM 34 51 0 0 85 0 60 26 0 86 33 1 46 0 80 0 0 1 0 1 252 8:45 AM 42 64 0 0 106 0 82 15 0 97 49 0 58 0 107 0 0 2 0 2 312 9:00 AM 42 77 0 0 119 0 58 20 0 78 34 0 51 0 85 1 0 1 0 2 284 Grand Total 149 245 0 0 394 0 246 81 0 327 153 1 199 0 353 1 0 4 0 5 1079 Medium Truck % 2.7 2.0 0.0 0.0 2.3 0.0 1.6 4.9 0.0 2.4 2.6 0.0 1.5 0.0 2.0 0.0 0.0 25.0 0.0 20.0 Heavy Truck % 2.0 0.4 0.0 0.0 1.0 0.0 1.2 2.5 0.0 1.5 2.6 0.0 0.0 0.0 1.1 0.0 0.0 0.0 0.0 0.0 Total Truck % 4.7 2.4 0.0 0.0 3.3 0.0 2.8 7.4 0.0 4.0 5.2 0.0 1.5 0.0 3.1 0.0 0.0 25.0 0.0 20.0 Total % 13.8 22.7 0.0 0.0 36.5 0.0 22.8 7.5 0.0 30.3 14.2 0.1 18.4 0.0 32.7 0.1 0.0 0.4 0.0 0.5 100.0 PHF 0.93 0.93 0.93 0.84 0.84 0.84 0.82 0.82 0.82 0.63 0.63 0.63 0.87 RT TH LT U 149 245 0 0 1RT0TH4LT0UU0LT199TH1RT1530 81 246 0 U LT TH RT Westbound Agency/Company: Gannon Chamberlain Sanderson Stewart North/South Street: Rouse Avenue AM Peak Hour (8:15 - 9:15 AM) 21391Project Number: Southbound Rouse Avenue Northbound Oak Street Eastbound East/West Street: INTERSECTION TURNING MOVEMENT COUNT SUMMARY General Information Rouse Avenue and Oak/Birch StreetCounted By:Oak StreetBirch Street353Bozeman, MT /MDTThursday, July 15, 2021Date Performed: Count Time Period: Nest Brewery Development Rouse Avenue Birch Street Oak Street/Birch Street Vehicle Volumes and Adjustments Rouse Avenue 394 In Out 446 Rouse Avenue 327 InOut 402In230 In5Out1Total Entering 1079Out NNNNN Intersection: Jurisdiction: Project Description: Int. Start Time Right Thru Left U-turn Total Right Thru Left U-turn Total Right Thru Left U-turn Total Right Thru Left U-turn Total Total Factor 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 1.00 1.00 1.00 1.00 0 1.00 1.00 1.00 1.00 0 4:30 PM 47 65 0 0 112 0 73 37 0 110 33 1 60 0 94 0 2 0 0 2 318 4:45 PM 51 55 0 0 106 0 76 50 0 126 44 0 61 0 105 0 0 0 0 0 337 5:00 PM 59 88 0 0 147 1 73 61 0 135 47 0 43 0 90 0 1 0 0 1 373 5:15 PM 55 61 0 0 116 0 74 55 0 129 37 0 51 0 88 0 0 0 0 0 333 Grand Total 212 269 0 0 481 1 296 203 0 500 161 1 215 0 377 0 3 0 0 3 1361 Medium Truck % 0.9 1.9 0.0 0.0 1.5 0.0 1.4 1.0 0.0 1.2 1.2 0.0 1.9 0.0 1.6 0.0 0.0 0.0 0.0 0.0 Heavy Truck % 0.5 0.0 0.0 0.0 0.2 0.0 0.0 0.0 0.0 0.0 1.2 0.0 0.5 0.0 0.8 0.0 0.0 0.0 0.0 0.0 Total Truck % 1.4 1.9 0.0 0.0 1.7 0.0 1.4 1.0 0.0 1.2 2.5 0.0 2.3 0.0 2.4 0.0 0.0 0.0 0.0 0.0 Total % 15.6 19.8 0.0 0.0 35.3 0.1 21.7 14.9 0.0 36.7 11.8 0.1 15.8 0.0 27.7 0.0 0.2 0.0 0.0 0.2 100.0 PHF 0.82 0.82 0.82 0.93 0.93 0.93 1.00 1.00 1.00 0.75 0.75 0.75 0.91 RT TH LT U 212 269 0 0 0RT3TH0LT0UU0LT215TH1RT1610 203 296 1 U LT TH RT Agency/Company: Sanderson Stewart INTERSECTION TURNING MOVEMENT COUNT SUMMARY General Information Counted By: Gannon Chamberlain Rouse Avenue and Oak/Birch Street North/South Street: Rouse Avenue Oak Street/Birch Street Date Performed: Thursday, July 15, 2021 Bozeman, MT /MDT Count Time Period: PM Peak Hour (4:30 - 5:30 PM) Project Number: 21391 Nest Brewery Development East/West Street:Oak StreetOut418Vehicle Volumes and Adjustments Rouse Avenue Rouse Avenue Oak Street Birch Street Southbound Northbound Eastbound Westbound In3772OutRouse Avenue In Out 481 511 Rouse Avenue 3InBirch StreetTotal Entering 1361 430 500 Out In NNNNN Intersection: Jurisdiction: Project Description: Int. Start Time Right Thru Left U-turn Total Right Thru Left U-turn Total Right Thru Left U-turn Total Right Thru Left U-turn Total Total Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0 0.85 0.85 0.85 0.85 0 8:15 AM 10 63 14 0 87 1 63 0 0 64 3 6 3 0 12 15 4 3 0 22 185 8:30 AM 3 80 11 0 94 0 67 4 0 71 3 3 7 0 13 14 1 3 0 18 196 8:45 AM 5 83 16 0 104 1 70 3 0 74 5 10 6 0 21 10 2 4 0 16 215 9:00 AM 9 79 13 0 101 1 70 3 0 74 4 8 4 0 16 14 2 2 0 18 209 Grand Total 27 305 54 0 386 3 270 10 0 283 15 27 20 0 62 53 9 12 0 74 805 Medium Truck % 0.0 0.3 0.0 0.0 0.3 0.0 0.0 0.0 0.0 0.0 6.7 0.0 0.0 0.0 1.6 0.0 0.0 0.0 0.0 0.0 Heavy Truck % 7.4 4.6 0.0 0.0 4.1 0.0 3.0 0.0 0.0 2.8 0.0 3.7 10.0 0.0 4.8 7.5 0.0 8.3 0.0 6.8 Total Truck % 7.4 4.9 0.0 0.0 4.4 0.0 3.0 0.0 0.0 2.8 6.7 3.7 10.0 0.0 6.5 7.5 0.0 8.3 0.0 6.8 Total % 3.4 37.9 6.7 0.0 48.0 0.4 33.5 1.2 0.0 35.2 1.9 3.4 2.5 0.0 7.7 6.6 1.1 1.5 0.0 9.2 100.0 PHF 0.93 0.93 0.93 0.96 0.96 0.96 0.75 0.75 0.75 1.00 1.00 1.00 0.94 RT TH LT U 27 305 54 0 53RT9TH12LT0UU0LT20TH27RT150 10 270 3 U LT TH RT Westbound Agency/Company: Gannon Chamberlain Sanderson Stewart North/South Street: Rouse Avenue AM Peak Hour (8:15 - 9:15 AM) 21391Project Number: Southbound Rouse Avenue Northbound Tamarack Street Eastbound East/West Street: INTERSECTION TURNING MOVEMENT COUNT SUMMARY General Information Tamarack Street and Rouse AvenueCounted By:Tamarack Street Tamarack Street 62Bozeman, MT /MDTThursday, July 15, 2021Date Performed: Count Time Period: Nest Brewery Development Rouse Avenue Tamarack Street Tamarack Street Vehicle Volumes and Adjustments Rouse Avenue 386 In Out 343 Rouse Avenue 283 InOut 332In46 In74Out84Total Entering 805Out NNNNN Intersection: Jurisdiction: Project Description: Int. Start Time Right Thru Left U-turn Total Right Thru Left U-turn Total Right Thru Left U-turn Total Right Thru Left U-turn Total Total Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0 0.85 0.85 0.85 0.85 0 4:30 PM 9 91 11 0 111 2 81 4 0 87 6 5 10 0 21 14 8 2 0 24 243 4:45 PM 10 90 6 0 106 1 95 8 0 104 7 5 10 0 22 19 4 0 0 23 255 5:00 PM 16 92 9 0 117 2 88 9 0 99 6 10 5 0 21 16 8 0 0 24 261 5:15 PM 19 88 12 0 119 3 91 5 0 99 5 7 5 0 17 15 10 1 0 26 261 Grand Total 54 361 38 0 453 8 355 26 0 389 24 27 30 0 81 64 30 3 0 97 1020 Medium Truck % 0.0 0.3 0.0 0.0 0.2 0.0 0.0 0.0 0.0 0.0 4.2 0.0 3.3 0.0 2.5 0.0 0.0 0.0 0.0 0.0 Heavy Truck % 1.9 3.0 5.3 0.0 3.1 0.0 2.0 0.0 0.0 1.8 0.0 3.7 0.0 0.0 1.2 4.7 3.3 0.0 0.0 4.1 Total Truck % 1.9 3.3 5.3 0.0 3.3 0.0 2.0 0.0 0.0 1.8 4.2 3.7 3.3 0.0 3.7 4.7 3.3 0.0 0.0 4.1 Total % 5.3 35.4 3.7 0.0 44.4 0.8 34.8 2.5 0.0 38.1 2.4 2.6 2.9 0.0 7.9 6.3 2.9 0.3 0.0 9.5 100.0 PHF 0.97 0.97 0.97 0.98 0.98 0.98 0.96 0.96 0.96 1.00 1.00 1.00 0.98 RT TH LT U 54 361 38 0 64RT30TH3LT0UU0LT30TH27RT240 26 355 8 U LT TH RT Agency/Company: Sanderson Stewart INTERSECTION TURNING MOVEMENT COUNT SUMMARY General Information Counted By: Gannon Chamberlain Tamarack Street and Rouse Avenue North/South Street: Rouse Avenue Tamarack Street Date Performed: Thursday, July 15, 2021 Bozeman, MT /MDT Count Time Period: PM Peak Hour (4:30 - 5:30 PM) Project Number: 21391 Nest Brewery Development East/West Street:Tamarack Street Out110Vehicle Volumes and Adjustments Rouse Avenue Rouse Avenue Tamarack Street Tamarack Street Southbound Northbound Eastbound Westbound In8173OutRouse Avenue In Out 453 449 Rouse Avenue 97InTamarack Street Total Entering 1020 388 389 Out In NNNNN Intersection: Jurisdiction: Project Description: Int. Start Time Right Thru Left U-turn Total Right Thru Left U-turn Total Right Thru Left U-turn Total Right Thru Left U-turn Total Total Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0 0.85 0.85 0.85 0.85 0 8:15 AM 8 59 3 0 70 4 48 4 0 56 14 15 8 0 37 9 14 0 0 23 186 8:30 AM 16 63 12 0 91 4 58 3 0 65 9 14 7 0 30 8 9 3 0 20 206 8:45 AM 8 76 10 0 94 3 53 3 0 59 17 19 8 0 44 10 9 2 0 21 218 9:00 AM 5 67 8 0 80 7 49 6 0 62 9 17 12 0 38 9 10 0 0 19 199 Grand Total 37 265 33 0 335 18 208 16 0 242 49 65 35 0 149 36 42 5 0 83 809 Medium Truck % 2.7 0.4 0.0 0.0 0.6 5.6 0.0 6.3 0.0 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Heavy Truck % 8.1 3.8 12.1 0.0 5.1 5.6 1.9 12.5 0.0 2.9 0.0 1.5 2.9 0.0 1.3 2.8 4.8 0.0 0.0 3.6 Total Truck % 10.8 4.2 12.1 0.0 5.7 11.1 1.9 18.8 0.0 3.7 0.0 1.5 2.9 0.0 1.3 2.8 4.8 0.0 0.0 3.6 Total % 4.6 32.8 4.1 0.0 41.4 2.2 25.7 2.0 0.0 29.9 6.1 8.0 4.3 0.0 18.4 4.4 5.2 0.6 0.0 10.3 100.0 PHF 0.89 0.89 0.89 1.00 1.00 1.00 0.86 0.86 0.86 1.00 1.00 1.00 0.93 RT TH LT U 37 265 33 0 36RT42TH5LT0UU0LT35TH65RT490 16 208 18 U LT TH RTIn95 In83Out116Total Entering 809Out Rouse Avenue 242 InOut 319 Rouse Avenue 335 In Out 279 Peach StreetPeach Street149Bozeman, MT /MDTThursday, August 5, 2021Date Performed: Count Time Period: Nest Brewery Development Rouse Avenue Peach Street Peach Street Vehicle Volumes and Adjustments INTERSECTION TURNING MOVEMENT COUNT SUMMARY General Information Rouse Avenue and Peach StreetCounted By: Westbound Agency/Company: Gannon Chamberlain Sanderson Stewart North/South Street: Rouse Avenue AM Peak Hour (8:15 - 9:15 AM) 21391Project Number: Southbound Rouse Avenue Northbound Peach Street Eastbound East/West Street: NNNNN Intersection: Jurisdiction: Project Description: Int. Start Time Right Thru Left U-turn Total Right Thru Left U-turn Total Right Thru Left U-turn Total Right Thru Left U-turn Total Total Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0 0.85 0.85 0.85 0.85 0 4:30 PM 13 76 10 0 99 3 55 12 0 70 12 18 13 0 43 19 19 2 0 40 252 4:45 PM 13 63 10 0 86 3 74 10 0 87 23 17 14 0 54 19 23 0 0 42 269 5:00 PM 20 74 12 0 106 3 73 13 0 89 17 18 14 0 49 14 19 3 0 36 280 5:15 PM 15 69 7 0 91 3 63 9 0 75 19 19 16 0 54 15 30 1 0 46 266 Grand Total 61 282 39 0 382 12 265 44 0 321 71 72 57 0 200 67 91 6 0 164 1067 Medium Truck % 0.0 0.7 0.0 0.0 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 16.7 0.0 0.6 Heavy Truck % 0.0 1.4 5.1 0.0 1.6 0.0 2.3 0.0 0.0 1.9 0.0 1.4 1.8 0.0 1.0 0.0 1.1 16.7 0.0 1.2 Total Truck % 0.0 2.1 5.1 0.0 2.1 0.0 2.3 0.0 0.0 1.9 0.0 1.4 1.8 0.0 1.0 0.0 1.1 33.3 0.0 1.8 Total % 5.7 26.4 3.7 0.0 35.8 1.1 24.8 4.1 0.0 30.1 6.7 6.7 5.3 0.0 18.7 6.3 8.5 0.6 0.0 15.4 100.0 PHF 0.90 0.90 0.90 0.90 0.90 0.90 1.00 1.00 1.00 1.00 1.00 1.00 0.95 RT TH LT U 61 282 39 0 67RT91TH6LT0UU0LT57TH72RT710 44 265 12 U LT TH RT Rouse Avenue 164InPeach StreetTotal Entering 1067 359 321 Out In Rouse Avenue In Out 382 389 Peach StreetOut196Vehicle Volumes and Adjustments Rouse Avenue Rouse Avenue Peach Street Peach Street Southbound Northbound Eastbound Westbound In200123OutNorth/South Street: Rouse Avenue Peach Street Date Performed: Thursday, August 5, 2021 Bozeman, MT /MDT Count Time Period: PM Peak Hour (4:30 - 5:30 PM) Project Number: 21391 Nest Brewery Development East/West Street: Agency/Company: Sanderson Stewart INTERSECTION TURNING MOVEMENT COUNT SUMMARY General Information Counted By: Gannon Chamberlain Rouse Avenue and Peach Street NNNNN Intersection: Jurisdiction: Project Description: Int. Start Time Right Thru Left U-turn Total Right Thru Left U-turn Total Right Thru Left U-turn Total Right Thru Left U-turn Total Total Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0 1.00 1.00 1.00 1.00 0 8:15 AM 19 52 7 0 78 4 64 10 0 78 0 0 0 0 0 24 33 5 0 62 218 8:30 AM 18 30 10 0 58 1 58 15 0 74 0 0 0 0 0 11 29 0 0 40 172 8:45 AM 25 43 9 0 77 4 67 20 0 91 0 0 0 0 0 12 23 1 0 36 204 9:00 AM 16 39 6 0 61 1 46 9 0 56 0 0 0 0 0 4 17 2 0 23 140 Grand Total 78 164 32 0 274 10 235 54 0 299 0 0 0 0 0 51 102 8 0 161 734 Medium Truck % 11.5 3.7 3.1 0.0 5.8 10.0 3.0 7.4 0.0 4.0 0.0 0.0 0.0 0.0 0.0 3.9 3.9 0.0 0.0 3.7 Heavy Truck % 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Truck % 11.5 3.7 3.1 0.0 5.8 10.0 3.0 7.4 0.0 4.0 0.0 0.0 0.0 0.0 0.0 3.9 3.9 0.0 0.0 3.7 Total % 10.6 22.3 4.4 0.0 37.3 1.4 32.0 7.4 0.0 40.7 0.0 0.0 0.0 0.0 0.0 6.9 13.9 1.1 0.0 21.9 100.0 PHF 0.90 0.90 0.90 0.82 0.82 0.82 1.00 1.00 1.00 1.00 1.00 1.00 0.90 RT TH LT U 78 164 32 0 51RT102TH8LT0UU0LT0TH0RT00 54 235 10 U LT TH RT Westbound Agency/Company: Gannon Chamberlain Sanderson Stewart North/South Street: Rouse Avenue AM Peak Hour (8:15 - 9:15 AM) 21391Project Number: Southbound Rouse Avenue Northbound E Mendenhall Street Eastbound East/West Street: INTERSECTION TURNING MOVEMENT COUNT SUMMARY General Information Rouse Avenue and E Mendenhall StreetCounted By:E Mendenhall StreetE Mendenhall Street0Bozeman, MT /MDTTuesday, December 28, 2021Date Performed: Count Time Period: Nest Brewery Development Rouse Avenue E Mendenhall Street E Mendenhall Street Vehicle Volumes and Adjustments Rouse Avenue 274 In Out 286 Rouse Avenue 299 InOut 172In234 In161Out42Total Entering 734Out NNNNN Intersection: Jurisdiction: Project Description: Int. Start Time Right Thru Left U-turn Total Right Thru Left U-turn Total Right Thru Left U-turn Total Right Thru Left U-turn Total Total Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0 1.00 1.00 1.00 1.00 0 4:30 PM 26 55 13 0 94 2 62 16 0 80 0 0 0 0 0 22 44 0 0 66 240 4:45 PM 44 43 15 0 102 0 59 14 0 73 0 0 0 0 0 7 31 1 0 39 214 5:00 PM 40 62 4 0 106 2 55 20 0 77 0 0 0 0 0 14 45 1 0 60 243 5:15 PM 33 66 9 0 108 1 73 16 0 90 0 0 0 0 0 13 48 1 0 62 260 Grand Total 143 226 41 0 410 5 249 66 0 320 0 0 0 0 0 56 168 3 0 227 957 Medium Truck % 1.4 0.4 0.0 0.0 0.7 0.0 2.8 3.0 0.0 2.8 0.0 0.0 0.0 0.0 0.0 3.6 2.4 0.0 0.0 2.6 Heavy Truck % 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.0 0.0 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Truck % 1.4 0.4 0.0 0.0 0.7 0.0 3.2 3.0 0.0 3.1 0.0 0.0 0.0 0.0 0.0 3.6 2.4 0.0 0.0 2.6 Total % 14.9 23.6 4.3 0.0 42.8 0.5 26.0 6.9 0.0 33.4 0.0 0.0 0.0 0.0 0.0 5.9 17.6 0.3 0.0 23.7 100.0 PHF 0.95 0.95 0.95 0.89 0.89 0.89 1.00 1.00 1.00 0.92 0.92 0.92 0.92 RT TH LT U 143 226 41 0 56RT168TH3LT0UU0LT0TH0RT00 66 249 5 U LT TH RT Agency/Company: Sanderson Stewart INTERSECTION TURNING MOVEMENT COUNT SUMMARY General Information Counted By: Gannon Chamberlain Rouse Avenue and E Mendenhall Street North/South Street: Rouse Avenue E Mendenhall Street Date Performed: Tuesday, December 28, 2021 Bozeman, MT /MDT Count Time Period: PM Peak Hour (4:30 - 5:30 PM) Project Number: 21391 Nest Brewery Development East/West Street:E Mendenhall StreetOut377Vehicle Volumes and Adjustments Rouse Avenue Rouse Avenue E Mendenhall Street E Mendenhall Street Southbound Northbound Eastbound Westbound In046OutRouse Avenue In Out 410 305 Rouse Avenue 227InE Mendenhall StreetTotal Entering 957 229 320 Out In NNNNN Intersection: Jurisdiction: Project Description: Int. Start Time Right Thru Left U-turn Total Right Thru Left U-turn Total Right Thru Left U-turn Total Right Thru Left U-turn Total Total Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.94 0.94 0.94 0.94 0 0.94 0.94 0.94 0.94 0 8:15 AM 2 5 17 0 24 1 34 2 0 37 3 29 8 0 40 18 56 0 0 74 175 8:30 AM 8 7 13 0 28 1 23 4 0 28 0 38 6 0 44 19 50 1 0 70 170 8:45 AM 3 12 22 0 37 1 30 2 0 33 4 43 10 0 57 18 63 3 0 84 211 9:00 AM 6 9 17 0 32 6 19 2 0 27 5 38 9 0 52 12 56 2 0 70 181 Grand Total 19 33 69 0 121 9 106 10 0 125 12 148 33 0 193 67 225 6 0 298 737 Medium Truck % 5.3 0.0 5.8 0.0 4.1 0.0 4.7 0.0 0.0 4.0 0.0 3.4 6.1 0.0 3.6 3.0 0.9 0.0 0.0 1.3 Heavy Truck % 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.0 3.0 0.0 2.1 1.5 0.9 0.0 0.0 1.0 Total Truck % 5.3 0.0 5.8 0.0 4.1 0.0 4.7 0.0 0.0 4.0 0.0 5.4 9.1 0.0 5.7 4.5 1.8 0.0 0.0 2.3 Total % 2.6 4.5 9.4 0.0 16.4 1.2 14.4 1.4 0.0 17.0 1.6 20.1 4.5 0.0 26.2 9.1 30.5 0.8 0.0 40.4 100.0 PHF 0.82 0.82 0.82 0.95 0.95 0.95 0.84 0.84 0.84 0.89 0.89 0.89 0.87 RT TH LT U 19 33 69 0 67RT225TH6LT0UU0LT33TH148RT120 10 106 9 U LT TH RTIn254 In298Out226Total Entering 737Out Rouse Avenue 125 InOut 51 Rouse Avenue 121 In Out 206 E Main StreetE Main Street193Bozeman, MT /MDTTuesday, December 28, 2021Date Performed: Count Time Period: Nest Brewery Development Rouse Avenue E Main Street E Main Street Vehicle Volumes and Adjustments INTERSECTION TURNING MOVEMENT COUNT SUMMARY General Information Rouse Avenue and E Main StreetCounted By: Westbound Agency/Company: Gannon Chamberlain Sanderson Stewart North/South Street: Rouse Avenue AM Peak Hour (8:15 - 9:15 AM) 21391Project Number: Southbound Rouse Avenue Northbound E Main Street Eastbound East/West Street: NNNNN Intersection: Jurisdiction: Project Description: Int. Start Time Right Thru Left U-turn Total Right Thru Left U-turn Total Right Thru Left U-turn Total Right Thru Left U-turn Total Total Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.94 0.94 0.94 0.94 0 0.94 0.94 0.94 0.94 0 4:30 PM 14 10 25 0 49 3 30 8 1 42 0 53 9 1 63 28 82 1 1 112 266 4:45 PM 15 17 25 0 57 4 25 5 0 34 7 58 6 0 71 25 90 5 0 120 282 5:00 PM 15 15 21 0 51 5 30 8 0 43 7 61 8 3 79 26 86 0 1 113 286 5:15 PM 14 13 21 0 48 4 32 10 0 46 5 56 9 0 70 24 70 7 0 101 265 Grand Total 58 55 92 0 205 16 117 31 1 165 19 228 32 4 283 103 328 13 2 446 1099 Medium Truck % 0.0 0.0 0.0 0.0 0.0 0.0 5.1 0.0 0.0 3.6 0.0 1.3 3.1 0.0 1.4 3.9 0.0 0.0 0.0 0.9 Heavy Truck % 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.3 0.0 0.0 1.1 0.0 0.6 0.0 0.0 0.4 Total Truck % 0.0 0.0 0.0 0.0 0.0 0.0 5.1 0.0 0.0 3.6 0.0 2.6 3.1 0.0 2.5 3.9 0.6 0.0 0.0 1.3 Total % 5.3 5.0 8.4 0.0 18.7 1.5 10.6 2.8 0.1 15.0 1.7 20.7 2.9 0.4 25.8 9.4 29.8 1.2 0.2 40.6 100.0 PHF 1.00 1.00 1.00 0.96 0.96 0.96 0.90 0.90 0.90 0.99 0.99 0.99 0.96 RT TH LT U 58 55 92 0 103RT328TH13LT2UU4LT32TH228RT191 31 117 16 U LT TH RT Rouse Avenue 446InE Main StreetTotal Entering 1099 88 165 Out In Rouse Avenue In Out 205 252 E Main StreetOut421Vehicle Volumes and Adjustments Rouse Avenue Rouse Avenue E Main Street E Main Street Southbound Northbound Eastbound Westbound In283338OutNorth/South Street: Rouse Avenue E Main Street Date Performed: Tuesday, December 28, 2021 Bozeman, MT /MDT Count Time Period: PM Peak Hour (4:30 - 5:30 PM) Project Number: 21391 Nest Brewery Development East/West Street: Agency/Company: Sanderson Stewart INTERSECTION TURNING MOVEMENT COUNT SUMMARY General Information Counted By: Gannon Chamberlain Rouse Avenue and E Main Street NNNNN Intersection: Jurisdiction: Project Description: Int. Start Time Right Thru Left U-turn Total Right Thru Left U-turn Total Right Thru Left U-turn Total Right Thru Left U-turn Total Total Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0 1.00 1.00 1.00 1.00 0 8:15 AM 4 9 6 0 19 0 9 10 0 19 8 8 3 0 19 2 5 0 0 7 64 8:30 AM 3 10 2 0 15 0 15 8 0 23 8 6 3 0 17 0 5 0 0 5 60 8:45 AM 3 11 4 0 18 0 9 9 0 18 18 8 2 0 28 1 3 0 0 4 68 9:00 AM 1 7 3 0 11 0 9 11 0 20 14 7 5 0 26 3 6 0 0 9 66 Grand Total 11 37 15 0 63 0 42 38 0 80 48 29 13 0 90 6 19 0 0 25 258 Medium Truck % 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Heavy Truck % 9.1 5.4 13.3 0.0 7.9 0.0 2.4 2.6 0.0 2.5 0.0 0.0 7.7 0.0 1.1 0.0 5.3 0.0 0.0 4.0 Total Truck % 9.1 5.4 13.3 0.0 7.9 0.0 2.4 2.6 0.0 2.5 0.0 0.0 7.7 0.0 1.1 0.0 5.3 0.0 0.0 4.0 Total % 4.3 14.3 5.8 0.0 24.4 0.0 16.3 14.7 0.0 31.0 18.6 11.2 5.0 0.0 34.9 2.3 7.4 0.0 0.0 9.7 100.0 PHF 0.85 0.85 0.85 1.00 1.00 1.00 0.80 0.80 0.80 1.00 1.00 1.00 0.93 RT TH LT U 11 37 15 0 6RT19TH0LT0UU0LT13TH29RT480 38 42 0 U LT TH RTIn68 In25Out44Total Entering 258Out Wallace Avenue 80 InOut 85 Wallace Avenue 63 In Out 61 Tamarack StreetTamarack Street90Bozeman, MT /MDTThursday, August 5, 2021Date Performed: Count Time Period: Nest Brewery Development Wallace Avenue Tamarack Street Tamarack Street Vehicle Volumes and Adjustments INTERSECTION TURNING MOVEMENT COUNT SUMMARY General Information Wallace Avenue and Tamarack StreetCounted By: Westbound Agency/Company: Gannon Chamberlain Sanderson Stewart North/South Street: Wallace Avenue AM Peak Hour (8:15 - 9:15 AM) 21391Project Number: Southbound Wallace Avenue Northbound Tamarack Street Eastbound East/West Street: NNNNN Intersection: Jurisdiction: Project Description: Int. Start Time Right Thru Left U-turn Total Right Thru Left U-turn Total Right Thru Left U-turn Total Right Thru Left U-turn Total Total Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0 1.00 1.00 1.00 1.00 0 4:30 PM 5 10 2 0 17 2 13 12 0 27 10 3 3 0 16 3 6 0 0 9 69 4:45 PM 2 21 3 0 26 0 14 17 0 31 2 4 6 0 12 3 6 1 0 10 79 5:00 PM 8 27 8 0 43 1 12 11 0 24 12 6 3 0 21 3 4 0 0 7 95 5:15 PM 4 14 1 0 19 0 14 17 0 31 11 8 3 0 22 3 0 0 0 3 75 Grand Total 19 72 14 0 105 3 53 57 0 113 35 21 15 0 71 12 16 1 0 29 318 Medium Truck % 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Heavy Truck % 21.1 1.4 0.0 0.0 4.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 20.0 0.0 4.2 0.0 0.0 0.0 0.0 0.0 Total Truck % 21.1 1.4 0.0 0.0 4.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 20.0 0.0 4.2 0.0 0.0 0.0 0.0 0.0 Total % 6.0 22.6 4.4 0.0 33.0 0.9 16.7 17.9 0.0 35.5 11.0 6.6 4.7 0.0 22.3 3.8 5.0 0.3 0.0 9.1 100.0 PHF 0.61 0.61 0.61 1.00 1.00 1.00 0.83 0.83 0.83 1.00 1.00 1.00 0.83 RT TH LT U 19 72 14 0 12RT16TH1LT0UU0LT15TH21RT350 57 53 3 U LT TH RT Wallace Avenue 29InTamarack StreetTotal Entering 318 108 113 Out In Wallace Avenue In Out 105 80 Tamarack StreetOut92Vehicle Volumes and Adjustments Wallace Avenue Wallace Avenue Tamarack Street Tamarack Street Southbound Northbound Eastbound Westbound In7138OutNorth/South Street: Wallace Avenue Tamarack Street Date Performed: Thursday, August 5, 2021 Bozeman, MT /MDT Count Time Period: PM Peak Hour (4:30 - 5:30 PM) Project Number: 21391 Nest Brewery Development East/West Street: Agency/Company: Sanderson Stewart INTERSECTION TURNING MOVEMENT COUNT SUMMARY General Information Counted By: Gannon Chamberlain Wallace Avenue and Tamarack Street NNNNN Intersection: Jurisdiction: Project Description: Int. Start Time Right Thru Left U-turn Total Right Thru Left U-turn Total Right Thru Left U-turn Total Right Thru Left U-turn Total Total Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0 0.85 0.85 0.85 0.85 0 8:15 AM 2 9 8 0 19 2 12 2 0 16 3 11 5 0 19 11 14 5 0 30 84 8:30 AM 2 9 5 0 16 2 13 3 0 18 7 12 7 0 26 13 13 2 0 28 88 8:45 AM 3 12 4 0 19 3 6 0 0 9 6 15 7 0 28 7 13 2 0 22 78 9:00 AM 5 9 6 0 20 4 19 5 0 28 3 18 8 0 29 3 9 2 0 14 91 Grand Total 12 39 23 0 74 11 50 10 0 71 19 56 27 0 102 34 49 11 0 94 341 Medium Truck % 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 5.3 0.0 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0 Heavy Truck % 0.0 2.6 0.0 0.0 1.4 0.0 0.0 10.0 0.0 1.4 0.0 7.1 0.0 0.0 3.9 8.8 2.0 0.0 0.0 4.3 Total Truck % 0.0 2.6 0.0 0.0 1.4 0.0 0.0 10.0 0.0 1.4 5.3 7.1 0.0 0.0 4.9 8.8 2.0 0.0 0.0 4.3 Total % 3.5 11.4 6.7 0.0 21.7 3.2 14.7 2.9 0.0 20.8 5.6 16.4 7.9 0.0 29.9 10.0 14.4 3.2 0.0 27.6 100.0 PHF 0.92 0.92 0.92 0.62 0.62 0.62 0.88 0.88 0.88 1.00 1.00 1.00 0.93 RT TH LT U 12 39 23 0 34RT49TH11LT0UU0LT27TH56RT190 10 50 11 U LT TH RTIn71 In94Out90Total Entering 341Out Wallace Avenue 71 InOut 69 Wallace Avenue 74 In Out 111 Peach StreetPeach Street102Bozeman, MT /MDTThursday, August 5, 2021Date Performed: Count Time Period: Nest Brewery Development Wallace Avenue Peach Street Peach Street Vehicle Volumes and Adjustments INTERSECTION TURNING MOVEMENT COUNT SUMMARY General Information Wallace Avenue and Peach StreetCounted By: Westbound Agency/Company: Gannon Chamberlain Sanderson Stewart North/South Street: Wallace Avenue AM Peak Hour (8:15 - 9:15 AM) 21391Project Number: Southbound Wallace Avenue Northbound Peach Street Eastbound East/West Street: NNNNN Intersection: Jurisdiction: Project Description: Int. Start Time Right Thru Left U-turn Total Right Thru Left U-turn Total Right Thru Left U-turn Total Right Thru Left U-turn Total Total Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0 0.85 0.85 0.85 0.85 0 4:30 PM 3 12 10 0 25 0 12 3 0 15 8 15 1 0 24 14 25 1 0 40 104 4:45 PM 4 14 7 0 25 2 11 3 0 16 4 22 3 0 29 10 21 2 0 33 103 5:00 PM 7 19 22 0 48 3 4 3 0 10 4 21 3 0 28 14 20 2 0 36 122 5:15 PM 3 13 11 0 27 3 10 1 0 14 3 21 3 0 27 16 35 3 0 54 122 Grand Total 17 58 50 0 125 8 37 10 0 55 19 79 10 0 108 54 101 8 0 163 451 Medium Truck % 0.0 0.0 0.0 0.0 0.0 0.0 0.0 10.0 0.0 1.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Heavy Truck % 0.0 1.7 2.0 0.0 1.6 0.0 0.0 0.0 0.0 0.0 5.3 3.8 0.0 0.0 3.7 0.0 1.0 0.0 0.0 0.6 Total Truck % 0.0 1.7 2.0 0.0 1.6 0.0 0.0 10.0 0.0 1.8 5.3 3.8 0.0 0.0 3.7 0.0 1.0 0.0 0.0 0.6 Total % 3.8 12.9 11.1 0.0 27.7 1.8 8.2 2.2 0.0 12.2 4.2 17.5 2.2 0.0 23.9 12.0 22.4 1.8 0.0 36.1 100.0 PHF 1.00 1.00 1.00 0.98 0.98 0.98 0.98 0.98 0.98 0.76 0.76 0.76 0.92 RT TH LT U 17 58 50 0 54RT101TH8LT0UU0LT10TH79RT190 10 37 8 U LT TH RT Wallace Avenue 163InPeach StreetTotal Entering 451 85 55 Out In Wallace Avenue In Out 125 101 Peach StreetOut128Vehicle Volumes and Adjustments Wallace Avenue Wallace Avenue Peach Street Peach Street Southbound Northbound Eastbound Westbound In108137OutNorth/South Street: Wallace Avenue Peach Street Date Performed: Thursday, August 5, 2021 Bozeman, MT /MDT Count Time Period: PM Peak Hour (4:30 - 5:30 PM) Project Number: 21391 Nest Brewery Development East/West Street: Agency/Company: Sanderson Stewart INTERSECTION TURNING MOVEMENT COUNT SUMMARY General Information Counted By: Gannon Chamberlain Wallace Avenue and Peach Street NNNNN Intersection: Jurisdiction: Project Description: Int. Start Time Right Thru Left U-turn Total Right Thru Left U-turn Total Right Thru Left U-turn Total Right Thru Left U-turn Total Total Factor 0.97 0.97 0.97 0.97 1.00 1.00 1.00 1.00 0.94 0.94 0.94 0.94 0 0.94 0.94 0.94 0.94 0 8:15 AM 3 0 17 0 20 0 0 0 0 0 0 51 6 0 57 22 81 0 1 104 181 8:30 AM 6 0 15 0 21 0 0 0 0 0 0 66 6 0 72 15 60 0 0 75 168 8:45 AM 7 0 20 0 27 0 0 0 0 0 0 71 5 0 76 24 101 0 0 125 228 9:00 AM 4 0 21 0 25 0 0 0 0 0 0 70 15 0 85 14 80 0 0 94 204 Grand Total 20 0 73 0 93 0 0 0 0 0 0 258 32 0 290 75 322 0 1 398 781 Medium Truck % 0.0 0.0 4.1 0.0 3.2 0.0 0.0 0.0 0.0 0.0 0.0 2.7 3.1 0.0 2.8 4.0 1.9 0.0 0.0 2.3 Heavy Truck % 5.0 0.0 1.4 0.0 2.2 0.0 0.0 0.0 0.0 0.0 0.0 0.8 0.0 0.0 0.7 1.3 0.6 0.0 0.0 0.8 Total Truck % 5.0 0.0 5.5 0.0 5.4 0.0 0.0 0.0 0.0 0.0 0.0 3.5 3.1 0.0 3.4 5.3 2.5 0.0 0.0 3.0 Total % 2.6 0.0 9.3 0.0 11.9 0.0 0.0 0.0 0.0 0.0 0.0 33.0 4.1 0.0 37.1 9.6 41.2 0.0 0.1 51.0 100.0 PHF 0.86 0.86 0.86 1.00 1.00 1.00 0.96 0.96 0.96 0.80 0.80 0.80 0.86 RT TH LT U 20 0 73 0 75RT322TH0LT1UU0LT32TH258RT00 0 0 0 U LT TH RT Westbound Agency/Company: Gannon Chamberlain Sanderson Stewart North/South Street: N Broadway Avenue AM Peak Hour (8:15 - 9:15 AM) 21391Project Number: Southbound N/A Northbound E Main Street Eastbound East/West Street: INTERSECTION TURNING MOVEMENT COUNT SUMMARY General Information N Broadway Avenue and E Main StreetCounted By:E Main StreetE Main Street290Bozeman, MT /MDTTuesday, December 28, 2021Date Performed: Count Time Period: Nest Brewery Development N Broadway Avenue E Main Street E Main Street Vehicle Volumes and Adjustments N Broadway Avenue 93 In Out 107 N/A 0 InOut 0In342 In398Out332Total Entering 781Out NNNNN Intersection: Jurisdiction: Project Description: Int. Start Time Right Thru Left U-turn Total Right Thru Left U-turn Total Right Thru Left U-turn Total Right Thru Left U-turn Total Total Factor 0.97 0.97 0.97 0.97 1.00 1.00 1.00 1.00 0.94 0.94 0.94 0.94 0 0.94 0.94 0.94 0.94 0 4:30 PM 10 0 33 0 43 0 0 0 0 0 0 109 11 0 120 20 103 0 0 123 286 4:45 PM 6 0 28 0 34 0 0 0 0 0 0 102 18 0 120 30 126 0 2 158 312 5:00 PM 6 0 38 1 45 0 0 0 0 0 0 116 14 0 130 39 115 0 0 154 329 5:15 PM 6 0 28 0 34 0 0 0 0 0 0 105 26 0 131 24 111 0 0 135 300 Grand Total 28 0 127 1 156 0 0 0 0 0 0 432 69 0 501 113 455 0 2 570 1227 Medium Truck % 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.5 0.0 0.0 0.4 0.0 0.9 0.0 0.0 0.7 Heavy Truck % 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 1.4 0.0 0.4 0.9 0.4 0.0 0.0 0.5 Total Truck % 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.7 1.4 0.0 0.8 0.9 1.3 0.0 0.0 1.2 Total % 2.3 0.0 10.4 0.1 12.7 0.0 0.0 0.0 0.0 0.0 0.0 35.2 5.6 0.0 40.8 9.2 37.1 0.0 0.2 46.5 100.0 PHF 0.87 0.87 0.87 1.00 1.00 1.00 0.97 0.97 0.97 0.93 0.93 0.93 0.94 RT TH LT U 28 0 127 1 113RT455TH0LT2UU0LT69TH432RT00 0 0 0 U LT TH RT Agency/Company: Sanderson Stewart INTERSECTION TURNING MOVEMENT COUNT SUMMARY General Information Counted By: Gannon Chamberlain N Broadway Avenue and E Main Street North/South Street: N Broadway Avenue E Main Street Date Performed: Tuesday, December 28, 2021 Bozeman, MT /MDT Count Time Period: PM Peak Hour (4:30 - 5:30 PM) Project Number: 21391 Nest Brewery Development East/West Street:E Main StreetOut483Vehicle Volumes and Adjustments N Broadway Avenue N/A E Main Street E Main Street Southbound Northbound Eastbound Westbound In501561OutN Broadway Avenue In Out 156 183 N/A 570InE Main StreetTotal Entering 1227 0 0 Out In NNNNN APPENDIX B CAPACITY CALCULATIONS – EXISTING CONDITIONS (2022) Avg Delay (s/veh) LOS 95th % Queue (veh) Avg Delay (s/veh) LOS 95th % Queue (veh) EB 19.3 B 7 30.5 C 10 WB 23.0 C 1 24.6 C 1 NB 6.6 A 5 7.5 A 7 SB 10.5 B 8 13.3 B 10 Intersection 12.3 B --15.9 B -- EB 22.1 C 2 21.2 C 2 WB 24.6 C 1 25.0 C 2 NB 9.6 A 7 10.1 B 9 SB 8.6 A 8 10.2 B 10 Intersection 11.5 B --12.5 B -- EB 20.8 C 3 21.0 C 3 WB 22.4 C 2 24.7 C 4 NB 10.5 B 6 11.1 B 8 SB 10.6 B 8 12.1 B 10 Intersection 13.7 B --15.4 B -- WB 18.5 B 2 18.7 B 2 NB 5.9 A 4 6.4 A 5 SB 6.0 A 3 6.8 A 4 Intersection 8.7 A --9.5 A -- EB 8.5 A 2 9.2 A 3 WB 9.0 A 3 9.9 A 4 NB 17.2 B 4 17.7 B 4 SB 11.8 B 2 11.7 B 2 Intersection 10.7 B --11.2 B -- EB 7.6 A 1 8.2 A 1 WB 7.4 A 1 7.6 A 1 NB 7.9 A 1 8.3 A 1 SB 7.8 A 1 8.0 A 1 Intersection 7.7 A --8.1 A -- EB 8.0 A 1 8.3 A 1 WB 7.8 A 1 8.5 A 1 NB 8.1 A 1 8.3 A 1 SB 7.9 A 1 8.7 A 1 Intersection 7.9 A --8.5 A -- EB 3.4 A 3 4.8 A 5 WB 3.6 A 3 5.0 A 5 NB 0.0 A 0 0.0 A 0 SB 18.8 B 2 18.5 B 3 Intersection 5.4 A --6.6 A -- East Tamarack Street & North Wallace Avenue East Mendenhall Street & North Rouse Avenue Intersection Control Signalized East Main Street & North Rouse Avenue Intersection Control All-Way Stop-Control East Tamarack Street & North Rouse Avenue Intersection Control Signalized East Peach Street & North Rouse Avenue Intersection Control Signalized Intersection Control Signalized East Oak Street & North Rouse Avenue Intersection Control Signalized Intersection Approach Existing (2021) AM Peak PM Peak Intersection Control All-Way Stop-Control East Main Street & North Broadway Avenue Intersection Control Signalized East Peach Street & North Wallace Avenue Queues 2: N Rouse Ave & E Mendenhall St 01/19/2022 Nest Brewery Site 01/18/2022 AM Peak Existing (2021)Synchro 10 Report Page 1 Lane Group WBT WBR NBL NBT SBL SBT SBR Lane Group Flow (vph) 122 57 60 272 36 182 87 v/c Ratio 0.24 0.19 0.08 0.27 0.05 0.19 0.11 Control Delay 18.5 4.2 3.7 8.7 3.6 9.4 3.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 18.5 4.2 3.7 8.7 3.6 9.4 3.1 Queue Length 50th (ft) 15 0 5 26 3 31 0 Queue Length 95th (ft) 34 14 14 99 10 67 19 Internal Link Dist (ft) 432 295 1843 Turn Bay Length (ft) 85 80 65 65 Base Capacity (vph) 1882 880 729 1213 720 1203 975 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.06 0.06 0.08 0.22 0.05 0.15 0.09 Intersection Summary HCM 6th Signalized Intersection Summary 2: N Rouse Ave & E Mendenhall St 01/19/2022 Nest Brewery Site 01/18/2022 AM Peak Existing (2021)Synchro 10 Report Page 2 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 0 0 0 8 102 51 54 235 10 32 164 78 Future Volume (veh/h) 0 0 0 8 102 51 54 235 10 32 164 78 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1750 1695 1695 1654 1709 1614 1709 1695 1586 Adj Flow Rate, veh/h 9 113 57 60 261 11 36 182 87 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Percent Heavy Veh, % 0 4 4 7 3 10 3 4 12 Cap, veh/h 24 324 152 721 821 35 691 822 652 Arrive On Green 0.11 0.11 0.11 0.06 0.50 0.50 0.04 0.48 0.48 Sat Flow, veh/h 232 3063 1437 1576 1628 69 1628 1695 1344 Grp Volume(v), veh/h 65 57 57 60 0 272 36 182 87 Grp Sat Flow(s),veh/h/ln 1684 1611 1437 1576 0 1697 1628 1695 1344 Q Serve(g_s), s 1.5 1.3 1.5 0.7 0.0 3.9 0.4 2.6 1.5 Cycle Q Clear(g_c), s 1.5 1.3 1.5 0.7 0.0 3.9 0.4 2.6 1.5 Prop In Lane 0.14 1.00 1.00 0.04 1.00 1.00 Lane Grp Cap(c), veh/h 178 170 152 721 0 856 691 822 652 V/C Ratio(X)0.37 0.33 0.38 0.08 0.00 0.32 0.05 0.22 0.13 Avail Cap(c_a), veh/h 1053 1008 899 855 0 1185 861 1184 939 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 17.2 17.1 17.2 4.5 0.0 6.0 4.9 6.1 5.8 Incr Delay (d2), s/veh 1.3 1.1 1.5 0.0 0.0 0.2 0.0 0.1 0.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.6 0.5 0.5 0.2 0.0 1.0 0.1 0.7 0.3 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 18.4 18.2 18.7 4.6 0.0 6.2 4.9 6.3 5.9 LnGrp LOS B B B A A A A A A Approach Vol, veh/h 179 332 305 Approach Delay, s/veh 18.5 5.9 6.0 Approach LOS B A A Timer - Assigned Phs 1 2 5 6 8 Phs Duration (G+Y+Rc), s 5.7 26.0 6.5 25.2 9.6 Change Period (Y+Rc), s 4.0 * 5.2 4.0 * 5.2 5.2 Max Green Setting (Gmax), s 6.0 * 29 6.0 * 29 25.8 Max Q Clear Time (g_c+I1), s 2.4 5.9 2.7 4.6 3.5 Green Ext Time (p_c), s 0.0 1.7 0.0 1.4 0.8 Intersection Summary HCM 6th Ctrl Delay 8.7 HCM 6th LOS A Notes * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. Queues 3: N Rouse Ave & E Peach St 01/19/2022 Nest Brewery Site 01/18/2022 AM Peak Existing (2021)Synchro 10 Report Page 3 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT SBL SBT Lane Group Flow (vph) 38 70 53 5 45 39 17 243 35 325 v/c Ratio 0.12 0.22 0.16 0.02 0.19 0.14 0.03 0.25 0.05 0.33 Control Delay 16.6 22.5 3.0 15.8 26.6 1.1 6.8 12.6 6.6 11.4 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 16.6 22.5 3.0 15.8 26.6 1.1 6.8 12.6 6.6 11.4 Queue Length 50th (ft) 8 16 0 1 10 0 1 26 3 37 Queue Length 95th (ft) 30 60 10 8 46 2 11 134 18 183 Internal Link Dist (ft) 361 770 1843 998 Turn Bay Length (ft) 80 80 75 80 30 30 Base Capacity (vph) 661 967 839 683 939 815 769 1183 825 1160 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.06 0.07 0.06 0.01 0.05 0.05 0.02 0.21 0.04 0.28 Intersection Summary HCM 6th Signalized Intersection Summary 3: N Rouse Ave & E Peach St 01/19/2022 Nest Brewery Site 01/18/2022 AM Peak Existing (2021)Synchro 10 Report Page 4 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 35 65 49 5 42 36 16 208 18 33 265 37 Future Volume (veh/h) 35 65 49 5 42 36 16 208 18 33 265 37 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 0.97 0.94 0.97 0.93 1.00 0.98 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1709 1723 1750 1750 1682 1709 1491 1723 1600 1586 1695 1600 Adj Flow Rate, veh/h 38 70 53 5 45 39 17 224 19 35 285 40 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Percent Heavy Veh, % 3 2 0 0 5 3 19 2 11 12 4 11 Cap, veh/h 329 285 230 300 223 179 451 688 58 545 662 93 Arrive On Green 0.04 0.17 0.17 0.01 0.13 0.13 0.02 0.44 0.44 0.04 0.46 0.46 Sat Flow, veh/h 1628 1723 1390 1667 1682 1354 1420 1562 133 1511 1449 203 Grp Volume(v), veh/h 38 70 53 5 45 39 17 0 243 35 0 325 Grp Sat Flow(s),veh/h/ln 1628 1723 1390 1667 1682 1354 1420 0 1695 1511 0 1653 Q Serve(g_s), s 1.1 2.0 1.9 0.1 1.4 1.5 0.4 0.0 5.3 0.7 0.0 7.6 Cycle Q Clear(g_c), s 1.1 2.0 1.9 0.1 1.4 1.5 0.4 0.0 5.3 0.7 0.0 7.6 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.08 1.00 0.12 Lane Grp Cap(c), veh/h 329 285 230 300 223 179 451 0 746 545 0 755 V/C Ratio(X) 0.12 0.25 0.23 0.02 0.20 0.22 0.04 0.00 0.33 0.06 0.00 0.43 Avail Cap(c_a), veh/h 866 889 717 905 867 698 947 0 1009 1047 0 983 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 19.9 20.6 20.6 21.1 22.0 22.0 8.7 0.0 10.4 8.2 0.0 10.4 Incr Delay (d2), s/veh 0.2 0.4 0.5 0.0 0.4 0.6 0.0 0.0 0.3 0.0 0.0 0.4 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.4 0.8 0.6 0.1 0.5 0.5 0.1 0.0 1.8 0.2 0.0 2.5 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 20.1 21.1 21.1 21.1 22.4 22.6 8.8 0.0 10.6 8.2 0.0 10.8 LnGrp LOS C C C C C C A A B A A B Approach Vol, veh/h 161 89 260 360 Approach Delay, s/veh 20.8 22.4 10.5 10.6 Approach LOS C C B B Timer - Assigned Phs 1 2 3 4 5 6 7 8 Phs Duration (G+Y+Rc), s 6.1 31.2 4.4 15.1 5.2 32.1 6.3 13.2 Change Period (Y+Rc), s 4.0 * 6.2 4.0 * 5.7 4.0 * 6.2 4.0 * 5.7 Max Green Setting (Gmax), s 21.0 * 34 21.0 * 29 21.0 * 34 21.0 * 29 Max Q Clear Time (g_c+I1), s 2.7 7.3 2.1 4.0 2.4 9.6 3.1 3.5 Green Ext Time (p_c), s 0.0 1.5 0.0 0.5 0.0 2.1 0.1 0.3 Intersection Summary HCM 6th Ctrl Delay 13.7 HCM 6th LOS B Notes * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. Queues 8: N Rouse Ave & E Oak St/E Birch St 01/19/2022 Nest Brewery Site 01/18/2022 AM Peak Existing (2021)Synchro 10 Report Page 5 Lane Group EBT EBR WBL WBR NBL NBT SBT SBR Lane Group Flow (vph) 230 176 5 1 93 283 282 171 v/c Ratio 0.71 0.25 0.02 0.00 0.16 0.30 0.43 0.28 Control Delay 35.2 2.5 18.5 0.0 7.7 10.0 19.9 8.0 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 35.2 2.5 18.5 0.0 7.7 10.0 19.9 8.0 Queue Length 50th (ft) 83 0 2 0 14 54 80 12 Queue Length 95th (ft) 159 23 9 0 41 124 182 59 Internal Link Dist (ft) 490 975 339 Turn Bay Length (ft) 140 30 30 200 80 Base Capacity (vph) 646 1052 411 1055 792 1642 1016 863 Starvation Cap Reductn 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.36 0.17 0.01 0.00 0.12 0.17 0.28 0.20 Intersection Summary HCM 6th Signalized Intersection Summary 8: N Rouse Ave & E Oak St/E Birch St 01/19/2022 Nest Brewery Site 01/18/2022 AM Peak Existing (2021)Synchro 10 Report Page 6 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 199 1 153 4 0 1 81 246 0 0 245 149 Future Volume (veh/h) 199 1 153 4 0 1 81 246 0 0 245 149 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 1.00 1.00 1.00 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1723 1750 1682 1409 1750 1750 1654 1709 1750 1750 1723 1682 Adj Flow Rate, veh/h 229 1 176 5 0 1 93 283 0 0 282 171 Peak Hour Factor 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 Percent Heavy Veh, % 2 0 5 25 0 0 7 3 0 0 2 5 Cap, veh/h 447 1 406 202 391 330 536 966 0 128 764 616 Arrive On Green 0.22 0.22 0.22 0.22 0.00 0.22 0.07 0.57 0.00 0.00 0.44 0.44 Sat Flow, veh/h 1427 6 1383 985 1750 1476 1576 1709 0 1114 1723 1388 Grp Volume(v), veh/h 230 0 176 5 0 1 93 283 0 0 282 171 Grp Sat Flow(s),veh/h/ln 1433 0 1383 985 1750 1476 1576 1709 0 1114 1723 1388 Q Serve(g_s), s 8.4 0.0 5.8 0.3 0.0 0.0 1.6 4.9 0.0 0.0 6.1 4.4 Cycle Q Clear(g_c), s 8.4 0.0 5.8 8.6 0.0 0.0 1.6 4.9 0.0 0.0 6.1 4.4 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 Lane Grp Cap(c), veh/h 448 0 406 202 391 330 536 966 0 128 764 616 V/C Ratio(X) 0.51 0.00 0.43 0.02 0.00 0.00 0.17 0.29 0.00 0.00 0.37 0.28 Avail Cap(c_a), veh/h 995 0 934 578 1059 894 1184 1183 0 405 1193 961 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 0.00 0.00 1.00 1.00 Uniform Delay (d), s/veh 20.2 0.0 16.2 24.2 0.0 17.0 6.8 6.4 0.0 0.0 10.4 9.9 Incr Delay (d2), s/veh 0.9 0.0 0.7 0.0 0.0 0.0 0.2 0.2 0.0 0.0 0.3 0.2 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.6 0.0 1.8 0.1 0.0 0.0 0.5 1.5 0.0 0.0 2.1 1.2 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 21.1 0.0 16.9 24.3 0.0 17.0 6.9 6.6 0.0 0.0 10.7 10.2 LnGrp LOS C A B C A B A A A A B B Approach Vol, veh/h 406 6 376 453 Approach Delay, s/veh 19.3 23.0 6.6 10.5 Approach LOS B C A B Timer - Assigned Phs 2 4 5 6 8 Phs Duration (G+Y+Rc), s 37.8 18.5 6.8 31.0 18.5 Change Period (Y+Rc), s 6.0 5.9 3.0 6.0 5.9 Max Green Setting (Gmax), s 39.0 34.1 27.0 39.0 34.1 Max Q Clear Time (g_c+I1), s 6.9 10.4 3.6 8.1 10.6 Green Ext Time (p_c), s 1.9 1.9 0.2 2.5 0.0 Intersection Summary HCM 6th Ctrl Delay 12.3 HCM 6th LOS B Queues 10: Private Entrance/N. Broadway Ave & E Main St 01/19/2022 Nest Brewery Site 01/18/2022 AM Peak Existing (2021)Synchro 10 Report Page 7 Lane Group EBT WBT SBT Lane Group Flow (vph) 337 462 108 v/c Ratio 0.19 0.24 0.39 Control Delay 6.8 6.2 14.3 Queue Delay 0.0 0.0 0.0 Total Delay 6.8 6.2 14.3 Queue Length 50th (ft) 18 23 15 Queue Length 95th (ft) 58 70 41 Internal Link Dist (ft) 1464 412 414 Turn Bay Length (ft) Base Capacity (vph) 2446 2615 599 Starvation Cap Reductn 0 0 0 Spillback Cap Reductn 0 0 0 Storage Cap Reductn 0 0 0 Reduced v/c Ratio 0.14 0.18 0.18 Intersection Summary HCM 6th Signalized Intersection Summary 10: Private Entrance/N. Broadway Ave & E Main St 01/19/2022 Nest Brewery Site 01/18/2022 AM Peak Existing (2021)Synchro 10 Report Page 8 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 32 258 0 1 322 75 0 0 0 73 0 20 Future Volume (veh/h) 32 258 0 1 322 75 0 0 0 73 0 20 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1709 1695 1750 1750 1723 1682 1750 1750 1750 1668 1750 1682 Adj Flow Rate, veh/h 37 300 0 1 374 87 0 0 0 85 0 23 Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 Percent Heavy Veh, % 3 4 0 0 2 5 0 0 0 6 0 5 Cap, veh/h 239 1701 0 89 1593 365 0 165 0 266 0 29 Arrive On Green 0.62 0.62 0.00 0.62 0.62 0.62 0.00 0.00 0.00 0.09 0.00 0.09 Sat Flow, veh/h 215 2841 0 1 2589 593 0 1750 0 1140 0 309 Grp Volume(v), veh/h 177 160 0 248 0 214 0 0 0 108 0 0 Grp Sat Flow(s),veh/h/ln 1513 1466 0 1722 0 1461 0 1750 0 1449 0 0 Q Serve(g_s), s 0.0 1.9 0.0 0.0 0.0 2.7 0.0 0.0 0.0 3.0 0.0 0.0 Cycle Q Clear(g_c), s 1.8 1.9 0.0 2.6 0.0 2.7 0.0 0.0 0.0 3.0 0.0 0.0 Prop In Lane 0.21 0.00 0.00 0.41 0.00 0.00 0.79 0.21 Lane Grp Cap(c), veh/h 1038 902 0 1149 0 899 0 165 0 295 0 0 V/C Ratio(X) 0.17 0.18 0.00 0.22 0.00 0.24 0.00 0.00 0.00 0.37 0.00 0.00 Avail Cap(c_a), veh/h 1608 1483 0 1830 0 1478 0 952 0 947 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 0.00 1.00 0.00 1.00 0.00 0.00 0.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 3.4 3.4 0.0 3.5 0.0 3.5 0.0 0.0 0.0 18.0 0.0 0.0 Incr Delay (d2), s/veh 0.1 0.1 0.0 0.1 0.0 0.1 0.0 0.0 0.0 0.8 0.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.4 0.3 0.0 0.5 0.0 0.5 0.0 0.0 0.0 0.9 0.0 0.0 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 3.4 3.5 0.0 3.6 0.0 3.7 0.0 0.0 0.0 18.8 0.0 0.0 LnGrp LOS A A A A A A A A A B A A Approach Vol, veh/h 337 462 0 108 Approach Delay, s/veh 3.4 3.6 0.0 18.8 Approach LOS A A B Timer - Assigned Phs 2 4 6 8 Phs Duration (G+Y+Rc), s 30.9 9.7 30.9 9.7 Change Period (Y+Rc), s 5.9 5.9 5.9 5.9 Max Green Setting (Gmax), s 41.1 22.1 41.1 22.1 Max Q Clear Time (g_c+I1), s 3.9 5.0 4.7 0.0 Green Ext Time (p_c), s 2.4 0.5 3.3 0.0 Intersection Summary HCM 6th Ctrl Delay 5.4 HCM 6th LOS A Queues 14: N Rouse Ave & E Tamarack St 01/19/2022 Nest Brewery Site 01/18/2022 AM Peak Existing (2021)Synchro 10 Report Page 9 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT SBL SBT Lane Group Flow (vph) 21 29 16 13 10 56 11 290 57 353 v/c Ratio 0.08 0.12 0.06 0.05 0.04 0.23 0.01 0.26 0.07 0.29 Control Delay 18.7 24.9 0.5 18.3 24.7 7.1 4.9 10.9 4.5 8.2 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 18.7 24.9 0.5 18.3 24.7 7.1 4.9 10.9 4.5 8.2 Queue Length 50th (ft) 6 8 0 4 3 0 1 55 4 38 Queue Length 95th (ft) 20 33 0 15 17 20 8 153 23 186 Internal Link Dist (ft) 417 774 998 975 Turn Bay Length (ft) 80 80 80 80 30 30 Base Capacity (vph) 838 1185 972 851 1232 972 1104 1436 1101 1389 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.03 0.02 0.02 0.02 0.01 0.06 0.01 0.20 0.05 0.25 Intersection Summary HCM 6th Signalized Intersection Summary 14: N Rouse Ave & E Tamarack St 01/19/2022 Nest Brewery Site 01/18/2022 AM Peak Existing (2021)Synchro 10 Report Page 10 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 20 27 15 12 9 53 10 270 3 54 305 27 Future Volume (veh/h) 20 27 15 12 9 53 10 270 3 54 305 27 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 0.99 0.96 0.99 0.96 1.00 0.98 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1614 1695 1654 1641 1750 1641 1750 1709 1750 1750 1682 1654 Adj Flow Rate, veh/h 21 29 16 13 10 56 11 287 3 57 324 29 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Percent Heavy Veh, % 10 4 7 8 0 8 0 3 0 0 5 7 Cap, veh/h 281 174 138 270 164 125 540 782 8 613 762 68 Arrive On Green 0.03 0.10 0.10 0.02 0.09 0.09 0.01 0.46 0.46 0.05 0.50 0.50 Sat Flow, veh/h 1537 1695 1349 1563 1750 1336 1667 1688 18 1667 1518 136 Grp Volume(v), veh/h 21 29 16 13 10 56 11 0 290 57 0 353 Grp Sat Flow(s),veh/h/ln 1537 1695 1349 1563 1750 1336 1667 0 1705 1667 0 1654 Q Serve(g_s), s 0.7 0.8 0.6 0.4 0.3 2.1 0.2 0.0 5.9 0.9 0.0 7.3 Cycle Q Clear(g_c), s 0.7 0.8 0.6 0.4 0.3 2.1 0.2 0.0 5.9 0.9 0.0 7.3 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.01 1.00 0.08 Lane Grp Cap(c), veh/h 281 174 138 270 164 125 540 0 790 613 0 830 V/C Ratio(X) 0.07 0.17 0.12 0.05 0.06 0.45 0.02 0.00 0.37 0.09 0.00 0.43 Avail Cap(c_a), veh/h 983 1077 857 997 1112 848 1319 0 1390 1327 0 1348 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 21.3 22.1 22.0 21.6 22.3 23.1 7.7 0.0 9.4 6.8 0.0 8.5 Incr Delay (d2), s/veh 0.1 0.4 0.4 0.1 0.2 2.5 0.0 0.0 0.3 0.1 0.0 0.3 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.2 0.3 0.2 0.1 0.1 0.7 0.1 0.0 1.9 0.3 0.0 2.2 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 21.4 22.6 22.4 21.6 22.4 25.6 7.7 0.0 9.7 6.9 0.0 8.9 LnGrp LOS C C C C C C A A A A A A Approach Vol, veh/h 66 79 301 410 Approach Delay, s/veh 22.1 24.6 9.6 8.6 Approach LOS C C A A Timer - Assigned Phs 1 2 3 4 5 6 7 8 Phs Duration (G+Y+Rc), s 6.9 31.0 4.9 11.2 4.8 33.1 5.4 10.8 Change Period (Y+Rc), s 4.0 6.0 4.0 * 5.7 4.0 6.0 4.0 * 5.7 Max Green Setting (Gmax), s 26.0 44.0 26.0 * 34 26.0 44.0 26.0 * 34 Max Q Clear Time (g_c+I1), s 2.9 7.9 2.4 2.8 2.2 9.3 2.7 4.1 Green Ext Time (p_c), s 0.1 2.0 0.0 0.2 0.0 2.5 0.0 0.2 Intersection Summary HCM 6th Ctrl Delay 11.5 HCM 6th LOS B Notes * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. HCM 6th AWSC 19: N. Wallace Ave & E Peach St 01/19/2022 Nest Brewery Site 01/18/2022 AM Peak Existing (2021)Synchro 10 Report Page 11 Intersection Intersection Delay, s/veh 7.9 Intersection LOS A Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 27 56 19 11 49 34 10 50 11 23 39 12 Future Vol, veh/h 27 56 19 11 49 34 10 50 11 23 39 12 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Heavy Vehicles, % 0 7 5 0 2 9 10 0 0 0 3 0 Mvmt Flow 29 60 20 12 53 37 11 54 12 25 42 13 Number of Lanes 0 1 0 0 1 0 0 1 0 0 1 0 Approach EB WB NB SB Opposing Approach WB EB SB NB Opposing Lanes 1 1 1 1 Conflicting Approach Left SB NB EB WB Conflicting Lanes Left 1 1 1 1 Conflicting Approach Right NB SB WB EB Conflicting Lanes Right 1 1 1 1 HCM Control Delay 8 7.8 8.1 7.9 HCM LOS A A A A Lane NBLn1 EBLn1 WBLn1 SBLn1 Vol Left, % 14% 26% 12% 31% Vol Thru, % 70% 55% 52% 53% Vol Right, % 15% 19% 36% 16% Sign Control Stop Stop Stop Stop Traffic Vol by Lane 71 102 94 74 LT Vol 10 27 11 23 Through Vol 50 56 49 39 RT Vol 11 19 34 12 Lane Flow Rate 76 110 101 80 Geometry Grp 1 1 1 1 Degree of Util (X) 0.097 0.131 0.118 0.098 Departure Headway (Hd) 4.56 4.31 4.188 4.418 Convergence, Y/N Yes Yes Yes Yes Cap 788 834 858 813 Service Time 2.577 2.326 2.203 2.435 HCM Lane V/C Ratio 0.096 0.132 0.118 0.098 HCM Control Delay 8.1 8 7.8 7.9 HCM Lane LOS A A A A HCM 95th-tile Q 0.3 0.5 0.4 0.3 Queues 22: E Main St & N Rouse Ave 01/19/2022 Nest Brewery Site 01/18/2022 AM Peak Existing (2021)Synchro 10 Report Page 12 Lane Group EBT WBT NBT SBL SBT Lane Group Flow (vph) 222 343 143 79 60 v/c Ratio 0.16 0.22 0.39 0.18 0.10 Control Delay 11.0 9.7 21.3 9.7 7.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 Total Delay 11.0 9.7 21.3 9.7 7.1 Queue Length 50th (ft) 22 31 39 14 7 Queue Length 95th (ft) 45 60 79 31 22 Internal Link Dist (ft) 314 1464 268 295 Turn Bay Length (ft) 50 Base Capacity (vph) 1851 2051 707 453 1121 Starvation Cap Reductn 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 Reduced v/c Ratio 0.12 0.17 0.20 0.17 0.05 Intersection Summary HCM 6th Signalized Intersection Summary 22: E Main St & N Rouse Ave 01/19/2022 Nest Brewery Site 01/18/2022 AM Peak Existing (2021)Synchro 10 Report Page 13 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 33 148 12 6 225 67 10 106 9 69 33 19 Future Volume (veh/h) 33 148 12 6 225 67 10 106 9 69 33 19 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1627 1682 1750 1750 1723 1695 1750 1682 1750 1668 1750 1682 Adj Flow Rate, veh/h 38 170 14 7 259 77 11 122 10 79 38 22 Peak Hour Factor 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 Percent Heavy Veh, % 9 5 0 0 2 4 0 5 0 6 0 5 Cap, veh/h 255 1009 84 86 1036 296 93 291 23 517 350 203 Arrive On Green 0.42 0.42 0.42 0.42 0.42 0.42 0.20 0.20 0.20 0.05 0.34 0.34 Sat Flow, veh/h 363 2380 197 16 2444 698 55 1475 115 1589 1040 602 Grp Volume(v), veh/h 116 0 106 184 0 159 143 0 0 79 0 60 Grp Sat Flow(s),veh/h/ln 1446 0 1495 1716 0 1442 1645 0 0 1589 0 1642 Q Serve(g_s), s 0.0 0.0 2.1 0.0 0.0 3.4 0.0 0.0 0.0 1.7 0.0 1.2 Cycle Q Clear(g_c), s 2.0 0.0 2.1 3.2 0.0 3.4 3.6 0.0 0.0 1.7 0.0 1.2 Prop In Lane 0.33 0.13 0.04 0.48 0.08 0.07 1.00 0.37 Lane Grp Cap(c), veh/h 714 0 634 807 0 611 407 0 0 517 0 553 V/C Ratio(X) 0.16 0.00 0.17 0.23 0.00 0.26 0.35 0.00 0.00 0.15 0.00 0.11 Avail Cap(c_a), veh/h 1026 0 970 1187 0 935 813 0 0 700 0 1152 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 0.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 8.4 0.0 8.4 8.8 0.0 8.8 16.6 0.0 0.0 12.4 0.0 10.8 Incr Delay (d2), s/veh 0.1 0.0 0.1 0.1 0.0 0.2 0.5 0.0 0.0 0.1 0.0 0.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.6 0.0 0.6 1.0 0.0 0.9 1.3 0.0 0.0 0.6 0.0 0.4 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 8.5 0.0 8.6 8.9 0.0 9.0 17.2 0.0 0.0 12.5 0.0 10.9 LnGrp LOS A A A A A A B A A B A B Approach Vol, veh/h 222 343 143 139 Approach Delay, s/veh 8.5 9.0 17.2 11.8 Approach LOS A A B B Timer - Assigned Phs 2 4 6 7 8 Phs Duration (G+Y+Rc), s 25.4 21.8 25.4 6.6 15.2 Change Period (Y+Rc), s 5.4 5.9 5.4 4.0 5.9 Max Green Setting (Gmax), s 30.6 33.1 30.6 8.0 21.1 Max Q Clear Time (g_c+I1), s 4.1 3.2 5.4 3.7 5.6 Green Ext Time (p_c), s 1.4 0.3 2.2 0.1 0.6 Intersection Summary HCM 6th Ctrl Delay 10.7 HCM 6th LOS B HCM 6th AWSC 28: N. Wallace Ave & E Tamarack St 01/19/2022 Nest Brewery Site 01/18/2022 AM Peak Existing (2021)Synchro 10 Report Page 14 Intersection Intersection Delay, s/veh 7.7 Intersection LOS A Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 13 29 48 0 19 6 38 42 0 15 37 11 Future Vol, veh/h 13 29 48 0 19 6 38 42 0 15 37 11 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Heavy Vehicles, % 8 0 0 0 5 0 3 2 0 13 5 9 Mvmt Flow 14 31 52 0 20 6 41 45 0 16 40 12 Number of Lanes 0 1 0 0 1 0 0 1 0 0 1 0 Approach EB WB NB SB Opposing Approach WB EB SB NB Opposing Lanes 1 1 1 1 Conflicting Approach Left SB NB EB WB Conflicting Lanes Left 1 1 1 1 Conflicting Approach Right NB SB WB EB Conflicting Lanes Right 1 1 1 1 HCM Control Delay 7.6 7.4 7.9 7.8 HCM LOS A A A A Lane NBLn1 EBLn1 WBLn1 SBLn1 Vol Left, % 47% 14% 0% 24% Vol Thru, % 53% 32% 76% 59% Vol Right, % 0% 53% 24% 17% Sign Control Stop Stop Stop Stop Traffic Vol by Lane 80 90 25 63 LT Vol 38 13 0 15 Through Vol 42 29 19 37 RT Vol 0 48 6 11 Lane Flow Rate 86 97 27 68 Geometry Grp 1 1 1 1 Degree of Util (X) 0.103 0.111 0.032 0.082 Departure Headway (Hd) 4.313 4.13 4.297 4.346 Convergence, Y/N Yes Yes Yes Yes Cap 820 873 838 813 Service Time 2.398 2.131 2.3 2.435 HCM Lane V/C Ratio 0.105 0.111 0.032 0.084 HCM Control Delay 7.9 7.6 7.4 7.8 HCM Lane LOS A A A A HCM 95th-tile Q 0.3 0.4 0.1 0.3 Queues 2: N Rouse Ave & E Mendenhall St 01/19/2022 Nest Brewery Site 01/18/2022 PM Peak Existing (2021)Synchro 10 Report Page 1 Lane Group WBT WBR NBL NBT SBL SBT SBR Lane Group Flow (vph) 186 61 72 276 45 246 155 v/c Ratio 0.32 0.19 0.11 0.31 0.07 0.29 0.20 Control Delay 18.6 4.4 4.3 9.8 4.1 10.7 3.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 18.6 4.4 4.3 9.8 4.1 10.7 3.1 Queue Length 50th (ft) 24 0 6 28 4 45 0 Queue Length 95th (ft) 47 15 19 110 13 97 27 Internal Link Dist (ft) 432 295 1843 Turn Bay Length (ft) 85 80 65 65 Base Capacity (vph) 1819 838 661 1076 675 1101 984 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.10 0.07 0.11 0.26 0.07 0.22 0.16 Intersection Summary HCM 6th Signalized Intersection Summary 2: N Rouse Ave & E Mendenhall St 01/19/2022 Nest Brewery Site 01/18/2022 PM Peak Existing (2021)Synchro 10 Report Page 2 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 0 0 0 3 168 56 66 249 5 41 226 143 Future Volume (veh/h) 0 0 0 3 168 56 66 249 5 41 226 143 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1750 1723 1695 1709 1709 1750 1750 1750 1736 Adj Flow Rate, veh/h 3 183 61 72 271 5 45 246 155 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 0 2 4 3 3 0 0 0 1 Cap, veh/h 6 406 176 654 819 15 689 824 693 Arrive On Green 0.12 0.12 0.12 0.07 0.49 0.49 0.05 0.47 0.47 Sat Flow, veh/h 52 3305 1437 1628 1673 31 1667 1750 1471 Grp Volume(v), veh/h 100 86 61 72 0 276 45 246 155 Grp Sat Flow(s),veh/h/ln 1720 1637 1437 1628 0 1703 1667 1750 1471 Q Serve(g_s), s 2.3 2.1 1.7 0.9 0.0 4.2 0.6 3.7 2.6 Cycle Q Clear(g_c), s 2.3 2.1 1.7 0.9 0.0 4.2 0.6 3.7 2.6 Prop In Lane 0.03 1.00 1.00 0.02 1.00 1.00 Lane Grp Cap(c), veh/h 211 201 176 654 0 834 689 824 693 V/C Ratio(X)0.47 0.43 0.35 0.11 0.00 0.33 0.07 0.30 0.22 Avail Cap(c_a), veh/h 1045 994 873 775 0 1155 843 1187 998 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 17.4 17.3 17.1 4.9 0.0 6.6 5.2 6.9 6.6 Incr Delay (d2), s/veh 1.6 1.5 1.2 0.1 0.0 0.2 0.0 0.2 0.2 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.9 0.8 0.5 0.2 0.0 1.2 0.1 1.1 0.7 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 19.0 18.7 18.2 5.0 0.0 6.8 5.2 7.1 6.8 LnGrp LOS B B B A A A A A A Approach Vol, veh/h 247 348 446 Approach Delay, s/veh 18.7 6.4 6.8 Approach LOS B A A Timer - Assigned Phs 1 2 5 6 8 Phs Duration (G+Y+Rc), s 6.1 26.0 6.9 25.2 10.4 Change Period (Y+Rc), s 4.0 * 5.2 4.0 * 5.2 5.2 Max Green Setting (Gmax), s 6.0 * 29 6.0 * 29 25.8 Max Q Clear Time (g_c+I1), s 2.6 6.2 2.9 5.7 4.3 Green Ext Time (p_c), s 0.0 1.7 0.0 2.0 1.2 Intersection Summary HCM 6th Ctrl Delay 9.5 HCM 6th LOS A Notes * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. Queues 3: N Rouse Ave & E Peach St 01/19/2022 Nest Brewery Site 01/18/2022 PM Peak Existing (2021)Synchro 10 Report Page 3 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT SBL SBT Lane Group Flow (vph) 60 76 75 6 96 71 46 292 41 361 v/c Ratio 0.17 0.18 0.18 0.02 0.35 0.23 0.08 0.32 0.07 0.41 Control Delay 17.7 22.3 5.0 16.8 31.5 5.9 8.5 16.9 8.5 18.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 17.7 22.3 5.0 16.8 31.5 5.9 8.5 16.9 8.5 18.1 Queue Length 50th (ft) 17 23 0 2 38 0 8 92 7 118 Queue Length 95th (ft) 46 69 23 10 89 22 25 180 23 230 Internal Link Dist (ft) 361 770 1843 998 Turn Bay Length (ft) 80 80 75 80 30 30 Base Capacity (vph) 657 923 810 514 923 806 839 1047 832 1027 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.09 0.08 0.09 0.01 0.10 0.09 0.05 0.28 0.05 0.35 Intersection Summary HCM 6th Signalized Intersection Summary 3: N Rouse Ave & E Peach St 01/19/2022 Nest Brewery Site 01/18/2022 PM Peak Existing (2021)Synchro 10 Report Page 4 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 57 72 71 6 91 67 44 265 12 39 282 61 Future Volume (veh/h) 57 72 71 6 91 67 44 265 12 39 282 61 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 0.99 0.98 0.98 0.94 1.00 0.98 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1723 1736 1750 1300 1736 1750 1750 1723 1750 1682 1723 1750 Adj Flow Rate, veh/h 60 76 75 6 96 71 46 279 13 41 297 64 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 2 1 0 33 1 0 0 2 0 5 2 0 Cap, veh/h 302 298 250 250 219 176 483 710 33 529 590 127 Arrive On Green 0.05 0.17 0.17 0.01 0.13 0.13 0.05 0.44 0.44 0.04 0.43 0.43 Sat Flow, veh/h 1641 1736 1457 1238 1736 1393 1667 1631 76 1602 1366 294 Grp Volume(v), veh/h 60 76 75 6 96 71 46 0 292 41 0 361 Grp Sat Flow(s),veh/h/ln 1641 1736 1457 1238 1736 1393 1667 0 1707 1602 0 1660 Q Serve(g_s), s 1.8 2.2 2.6 0.2 3.0 2.7 0.9 0.0 6.8 0.8 0.0 9.1 Cycle Q Clear(g_c), s 1.8 2.2 2.6 0.2 3.0 2.7 0.9 0.0 6.8 0.8 0.0 9.1 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.04 1.00 0.18 Lane Grp Cap(c), veh/h 302 298 250 250 219 176 483 0 743 529 0 717 V/C Ratio(X) 0.20 0.25 0.30 0.02 0.44 0.40 0.10 0.00 0.39 0.08 0.00 0.50 Avail Cap(c_a), veh/h 809 878 737 688 878 705 1012 0 996 1043 0 969 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 19.8 20.8 20.9 21.8 23.4 23.3 8.9 0.0 11.1 8.6 0.0 12.0 Incr Delay (d2), s/veh 0.3 0.4 0.7 0.0 1.4 1.5 0.1 0.0 0.3 0.1 0.0 0.5 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.7 0.9 0.9 0.1 1.2 0.9 0.3 0.0 2.3 0.3 0.0 3.1 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 20.1 21.2 21.6 21.9 24.8 24.8 9.0 0.0 11.5 8.7 0.0 12.5 LnGrp LOS C C C C C C A A B A A B Approach Vol, veh/h 211 173 338 402 Approach Delay, s/veh 21.0 24.7 11.1 12.1 Approach LOS C C B B Timer - Assigned Phs 1 2 3 4 5 6 7 8 Phs Duration (G+Y+Rc), s 6.4 31.4 4.5 15.6 6.6 31.2 7.1 13.0 Change Period (Y+Rc), s 4.0 * 6.2 4.0 * 5.7 4.0 * 6.2 4.0 * 5.7 Max Green Setting (Gmax), s 21.0 * 34 21.0 * 29 21.0 * 34 21.0 * 29 Max Q Clear Time (g_c+I1), s 2.8 8.8 2.2 4.6 2.9 11.1 3.8 5.0 Green Ext Time (p_c), s 0.1 1.9 0.0 0.6 0.1 2.4 0.1 0.8 Intersection Summary HCM 6th Ctrl Delay 15.4 HCM 6th LOS B Notes * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. Queues 8: N Rouse Ave & E Oak St/E Birch St 01/19/2022 Nest Brewery Site 01/18/2022 PM Peak Existing (2021)Synchro 10 Report Page 5 Lane Group EBT EBR WBT NBL NBT SBT SBR Lane Group Flow (vph) 237 177 3 223 326 296 233 v/c Ratio 0.79 0.37 0.01 0.34 0.30 0.40 0.33 Control Delay 51.9 6.7 26.3 9.3 9.9 22.9 9.2 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 51.9 6.7 26.3 9.3 9.9 22.9 9.2 Queue Length 50th (ft) 127 0 1 46 78 113 25 Queue Length 95th (ft) 232 50 8 108 167 246 100 Internal Link Dist (ft) 490 107 975 339 Turn Bay Length (ft) 140 200 80 Base Capacity (vph) 468 647 659 766 1321 739 704 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.51 0.27 0.00 0.29 0.25 0.40 0.33 Intersection Summary HCM 6th Signalized Intersection Summary 8: N Rouse Ave & E Oak St/E Birch St 01/19/2022 Nest Brewery Site 01/18/2022 PM Peak Existing (2021)Synchro 10 Report Page 6 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 215 1 161 0 3 0 203 296 1 0 269 212 Future Volume (veh/h) 215 1 161 0 3 0 203 296 1 0 269 212 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 1.00 1.00 0.98 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1723 1750 1723 1750 1750 1750 1736 1736 1750 1750 1723 1736 Adj Flow Rate, veh/h 236 1 177 0 3 0 223 325 1 0 296 233 Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Percent Heavy Veh, % 2 0 2 0 0 0 1 1 0 0 2 1 Cap, veh/h 390 1 299 0 369 313 588 1104 3 91 852 709 Arrive On Green 0.21 0.21 0.21 0.00 0.21 0.00 0.09 0.64 0.64 0.00 0.49 0.49 Sat Flow, veh/h 1419 6 1420 0 1750 1483 1654 1730 5 1071 1723 1433 Grp Volume(v), veh/h 237 0 177 0 3 0 223 0 326 0 296 233 Grp Sat Flow(s),veh/h/ln 1425 0 1420 0 1750 1483 1654 0 1735 1071 1723 1433 Q Serve(g_s), s 12.3 0.0 8.9 0.0 0.1 0.0 4.8 0.0 6.6 0.0 8.3 7.7 Cycle Q Clear(g_c), s 12.4 0.0 8.9 0.0 0.1 0.0 4.8 0.0 6.6 0.0 8.3 7.7 Prop In Lane 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 Lane Grp Cap(c), veh/h 391 0 299 0 369 313 588 0 1107 91 852 709 V/C Ratio(X) 0.61 0.00 0.59 0.00 0.01 0.00 0.38 0.00 0.29 0.00 0.35 0.33 Avail Cap(c_a), veh/h 709 0 614 0 757 642 980 0 1107 91 852 709 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 0.00 1.00 0.00 1.00 0.00 1.00 0.00 1.00 1.00 Uniform Delay (d), s/veh 29.5 0.0 28.0 0.0 24.6 0.0 7.7 0.0 6.4 0.0 12.1 12.0 Incr Delay (d2), s/veh 1.5 0.0 1.9 0.0 0.0 0.0 0.4 0.0 0.7 0.0 1.1 1.2 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 4.3 0.0 3.1 0.0 0.0 0.0 1.6 0.0 2.3 0.0 3.3 2.6 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 31.0 0.0 29.9 0.0 24.6 0.0 8.1 0.0 7.0 0.0 13.3 13.3 LnGrp LOS C A C A C A A A A A B B Approach Vol, veh/h 414 3 549 529 Approach Delay, s/veh 30.5 24.6 7.5 13.3 Approach LOS C C A B Timer - Assigned Phs 2 4 5 6 8 Phs Duration (G+Y+Rc), s 56.3 22.5 11.3 45.0 22.5 Change Period (Y+Rc), s 6.0 5.9 4.0 6.0 5.9 Max Green Setting (Gmax), s 39.0 34.1 26.0 39.0 34.1 Max Q Clear Time (g_c+I1), s 8.6 14.4 6.8 10.3 2.1 Green Ext Time (p_c), s 2.2 2.0 0.6 2.9 0.0 Intersection Summary HCM 6th Ctrl Delay 15.9 HCM 6th LOS B Queues 10: Private Entrance/N. Broadway Ave & E Main St 01/19/2022 Nest Brewery Site 01/18/2022 PM Peak Existing (2021)Synchro 10 Report Page 7 Lane Group EBT WBT SBT Lane Group Flow (vph) 533 606 166 v/c Ratio 0.37 0.36 0.52 Control Delay 8.7 7.6 17.8 Queue Delay 0.0 0.0 0.0 Total Delay 8.7 7.6 17.8 Queue Length 50th (ft) 37 37 29 Queue Length 95th (ft) 102 101 69 Internal Link Dist (ft) 1464 412 414 Turn Bay Length (ft) Base Capacity (vph) 2175 2501 596 Starvation Cap Reductn 0 0 0 Spillback Cap Reductn 0 0 0 Storage Cap Reductn 0 0 0 Reduced v/c Ratio 0.25 0.24 0.28 Intersection Summary HCM 6th Signalized Intersection Summary 10: Private Entrance/N. Broadway Ave & E Main St 01/19/2022 Nest Brewery Site 01/18/2022 PM Peak Existing (2021)Synchro 10 Report Page 8 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 69 432 0 2 455 113 0 0 0 128 0 28 Future Volume (veh/h) 69 432 0 2 455 113 0 0 0 128 0 28 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1736 1736 1750 1750 1736 1736 1750 1750 1750 1750 1750 1750 Adj Flow Rate, veh/h 73 460 0 2 484 120 0 0 0 136 0 30 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Percent Heavy Veh, % 1 1 0 0 1 1 0 0 0 0 0 0 Cap, veh/h 271 1519 0 84 1483 364 0 263 0 329 1 39 Arrive On Green 0.58 0.58 0.00 0.58 0.58 0.58 0.00 0.00 0.00 0.15 0.00 0.15 Sat Flow, veh/h 287 2711 0 1 2569 631 0 1750 0 1183 3 262 Grp Volume(v), veh/h 268 265 0 327 0 279 0 0 0 166 0 0 Grp Sat Flow(s),veh/h/ln 1418 1501 0 1735 0 1467 0 1750 0 1448 0 0 Q Serve(g_s), s 0.0 3.9 0.0 0.0 0.0 4.3 0.0 0.0 0.0 4.7 0.0 0.0 Cycle Q Clear(g_c), s 3.3 3.9 0.0 4.2 0.0 4.3 0.0 0.0 0.0 4.8 0.0 0.0 Prop In Lane 0.27 0.00 0.01 0.43 0.00 0.00 0.82 0.18 Lane Grp Cap(c), veh/h 924 866 0 1085 0 847 0 263 0 369 0 0 V/C Ratio(X) 0.29 0.31 0.00 0.30 0.00 0.33 0.00 0.00 0.00 0.45 0.00 0.00 Avail Cap(c_a), veh/h 1420 1424 0 1727 0 1392 0 893 0 890 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 0.00 1.00 0.00 1.00 0.00 0.00 0.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 4.6 4.7 0.0 4.8 0.0 4.8 0.0 0.0 0.0 17.7 0.0 0.0 Incr Delay (d2), s/veh 0.2 0.2 0.0 0.2 0.0 0.2 0.0 0.0 0.0 0.9 0.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.8 0.8 0.0 1.0 0.0 0.9 0.0 0.0 0.0 1.5 0.0 0.0 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 4.7 4.9 0.0 4.9 0.0 5.0 0.0 0.0 0.0 18.5 0.0 0.0 LnGrp LOS A A A A A A A A A B A A Approach Vol, veh/h 533 606 0 166 Approach Delay, s/veh 4.8 5.0 0.0 18.5 Approach LOS A A B Timer - Assigned Phs 2 4 6 8 Phs Duration (G+Y+Rc), s 30.9 12.4 30.9 12.4 Change Period (Y+Rc), s 5.9 5.9 5.9 5.9 Max Green Setting (Gmax), s 41.1 22.1 41.1 22.1 Max Q Clear Time (g_c+I1), s 5.9 6.8 6.3 0.0 Green Ext Time (p_c), s 4.1 0.8 4.5 0.0 Intersection Summary HCM 6th Ctrl Delay 6.6 HCM 6th LOS A Queues 14: N Rouse Ave & E Tamarack St 01/19/2022 Nest Brewery Site 01/18/2022 PM Peak Existing (2021)Synchro 10 Report Page 9 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT SBL SBT Lane Group Flow (vph) 31 28 24 3 31 65 27 370 39 423 v/c Ratio 0.11 0.10 0.08 0.01 0.15 0.27 0.04 0.38 0.06 0.42 Control Delay 19.0 24.2 0.5 18.0 29.0 9.5 6.0 13.8 6.0 13.3 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 19.0 24.2 0.5 18.0 29.0 9.5 6.0 13.8 6.0 13.3 Queue Length 50th (ft) 9 8 0 1 9 0 2 75 3 49 Queue Length 95th (ft) 29 33 0 7 37 27 14 203 18 242 Internal Link Dist (ft) 417 774 998 975 Turn Bay Length (ft) 80 80 80 80 30 30 Base Capacity (vph) 770 1058 929 792 1069 897 962 1370 918 1331 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.04 0.03 0.03 0.00 0.03 0.07 0.03 0.27 0.04 0.32 Intersection Summary HCM 6th Signalized Intersection Summary 14: N Rouse Ave & E Tamarack St 01/19/2022 Nest Brewery Site 01/18/2022 PM Peak Existing (2021)Synchro 10 Report Page 10 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 30 27 24 3 30 64 26 355 8 38 361 54 Future Volume (veh/h) 30 27 24 3 30 64 26 355 8 38 361 54 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 0.99 0.99 0.99 0.99 1.00 0.98 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1709 1695 1695 1750 1709 1682 1750 1723 1750 1682 1709 1723 Adj Flow Rate, veh/h 31 28 24 3 31 65 27 362 8 39 368 55 Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 Percent Heavy Veh, % 3 4 4 0 3 5 0 2 0 5 3 2 Cap, veh/h 288 210 177 268 160 132 475 780 17 513 687 103 Arrive On Green 0.03 0.12 0.12 0.00 0.09 0.09 0.03 0.46 0.46 0.04 0.47 0.47 Sat Flow, veh/h 1628 1695 1425 1667 1709 1410 1667 1678 37 1602 1447 216 Grp Volume(v), veh/h 31 28 24 3 31 65 27 0 370 39 0 423 Grp Sat Flow(s),veh/h/ln 1628 1695 1425 1667 1709 1410 1667 0 1715 1602 0 1663 Q Serve(g_s), s 0.9 0.8 0.8 0.1 0.9 2.4 0.4 0.0 7.9 0.7 0.0 9.6 Cycle Q Clear(g_c), s 0.9 0.8 0.8 0.1 0.9 2.4 0.4 0.0 7.9 0.7 0.0 9.6 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.02 1.00 0.13 Lane Grp Cap(c), veh/h 288 210 177 268 160 132 475 0 797 513 0 790 V/C Ratio(X) 0.11 0.13 0.14 0.01 0.19 0.49 0.06 0.00 0.46 0.08 0.00 0.54 Avail Cap(c_a), veh/h 1019 1081 909 1067 1090 899 1229 0 1403 1222 0 1360 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 20.9 21.0 21.0 21.9 22.5 23.2 7.7 0.0 9.8 7.3 0.0 9.9 Incr Delay (d2), s/veh 0.2 0.3 0.3 0.0 0.6 2.8 0.0 0.0 0.4 0.1 0.0 0.6 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.3 0.3 0.3 0.0 0.4 0.8 0.1 0.0 2.6 0.2 0.0 3.1 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 21.0 21.3 21.3 22.0 23.1 26.0 7.8 0.0 10.2 7.4 0.0 10.5 LnGrp LOS C C C C C C A A B A A B Approach Vol, veh/h 83 99 397 462 Approach Delay, s/veh 21.2 25.0 10.1 10.2 Approach LOS C C B B Timer - Assigned Phs 1 2 3 4 5 6 7 8 Phs Duration (G+Y+Rc), s 6.2 31.0 4.2 12.4 5.7 31.5 5.9 10.7 Change Period (Y+Rc), s 4.0 6.0 4.0 * 5.7 4.0 6.0 4.0 * 5.7 Max Green Setting (Gmax), s 26.0 44.0 26.0 * 34 26.0 44.0 26.0 * 34 Max Q Clear Time (g_c+I1), s 2.7 9.9 2.1 2.8 2.4 11.6 2.9 4.4 Green Ext Time (p_c), s 0.1 2.6 0.0 0.2 0.0 3.1 0.0 0.4 Intersection Summary HCM 6th Ctrl Delay 12.5 HCM 6th LOS B Notes * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. HCM 6th AWSC 19: N. Wallace Ave & E Peach St 01/19/2022 Nest Brewery Site 01/18/2022 PM Peak Existing (2021)Synchro 10 Report Page 11 Intersection Intersection Delay, s/veh 8.5 Intersection LOS A Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 10 79 19 8 101 54 10 37 8 50 58 17 Future Vol, veh/h 10 79 19 8 101 54 10 37 8 50 58 17 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Heavy Vehicles, % 0 4 5 0 1 0 10 0 0 2 2 0 Mvmt Flow 11 86 21 9 110 59 11 40 9 54 63 18 Number of Lanes 0 1 0 0 1 0 0 1 0 0 1 0 Approach EB WB NB SB Opposing Approach WB EB SB NB Opposing Lanes 1 1 1 1 Conflicting Approach Left SB NB EB WB Conflicting Lanes Left 1 1 1 1 Conflicting Approach Right NB SB WB EB Conflicting Lanes Right 1 1 1 1 HCM Control Delay 8.3 8.5 8.3 8.7 HCM LOS A A A A Lane NBLn1 EBLn1 WBLn1 SBLn1 Vol Left, % 18% 9% 5% 40% Vol Thru, % 67% 73% 62% 46% Vol Right, % 15% 18% 33% 14% Sign Control Stop Stop Stop Stop Traffic Vol by Lane 55 108 163 125 LT Vol 10 10 8 50 Through Vol 37 79 101 58 RT Vol 8 19 54 17 Lane Flow Rate 60 117 177 136 Geometry Grp 1 1 1 1 Degree of Util (X) 0.08 0.146 0.212 0.176 Departure Headway (Hd) 4.845 4.48 4.316 4.665 Convergence, Y/N Yes Yes Yes Yes Cap 738 801 831 769 Service Time 2.88 2.507 2.342 2.694 HCM Lane V/C Ratio 0.081 0.146 0.213 0.177 HCM Control Delay 8.3 8.3 8.5 8.7 HCM Lane LOS A A A A HCM 95th-tile Q 0.3 0.5 0.8 0.6 Queues 22: E Main St & N Rouse Ave 01/19/2022 Nest Brewery Site 01/18/2022 PM Peak Existing (2021)Synchro 10 Report Page 12 Lane Group EBT WBT NBT SBL SBT Lane Group Flow (vph) 296 465 172 96 117 v/c Ratio 0.22 0.31 0.47 0.20 0.17 Control Delay 12.5 11.7 22.8 9.3 5.9 Queue Delay 0.0 0.0 0.0 0.0 0.0 Total Delay 12.5 11.7 22.8 9.3 5.9 Queue Length 50th (ft) 32 47 48 17 10 Queue Length 95th (ft) 65 92 97 37 34 Internal Link Dist (ft) 314 1464 268 295 Turn Bay Length (ft) 50 Base Capacity (vph) 1761 1907 663 512 1115 Starvation Cap Reductn 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 Reduced v/c Ratio 0.17 0.24 0.26 0.19 0.10 Intersection Summary HCM 6th Signalized Intersection Summary 22: E Main St & N Rouse Ave 01/19/2022 Nest Brewery Site 01/18/2022 PM Peak Existing (2021)Synchro 10 Report Page 13 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 36 228 19 15 328 103 32 117 16 92 55 58 Future Volume (veh/h) 36 228 19 15 328 103 32 117 16 92 55 58 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1709 1709 1750 1750 1736 1695 1750 1682 1750 1750 1750 1750 Adj Flow Rate, veh/h 38 238 20 16 342 107 33 122 17 96 57 60 Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Percent Heavy Veh, % 3 3 0 0 1 4 0 5 0 0 0 0 Cap, veh/h 198 1063 88 95 1001 301 126 255 32 535 272 286 Arrive On Green 0.42 0.42 0.42 0.42 0.42 0.42 0.20 0.20 0.20 0.06 0.35 0.35 Sat Flow, veh/h 251 2554 212 38 2404 724 180 1253 157 1667 781 822 Grp Volume(v), veh/h 153 0 143 251 0 214 172 0 0 96 0 117 Grp Sat Flow(s),veh/h/ln 1501 0 1517 1716 0 1450 1590 0 0 1667 0 1602 Q Serve(g_s), s 0.0 0.0 2.9 0.0 0.0 4.9 0.6 0.0 0.0 2.0 0.0 2.5 Cycle Q Clear(g_c), s 2.8 0.0 2.9 4.7 0.0 4.9 4.5 0.0 0.0 2.0 0.0 2.5 Prop In Lane 0.25 0.14 0.06 0.50 0.19 0.10 1.00 0.51 Lane Grp Cap(c), veh/h 718 0 631 794 0 603 413 0 0 535 0 559 V/C Ratio(X) 0.21 0.00 0.23 0.32 0.00 0.36 0.42 0.00 0.00 0.18 0.00 0.21 Avail Cap(c_a), veh/h 1031 0 966 1164 0 923 778 0 0 710 0 1104 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 0.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 9.0 0.0 9.0 9.6 0.0 9.6 17.0 0.0 0.0 12.2 0.0 11.0 Incr Delay (d2), s/veh 0.1 0.0 0.2 0.2 0.0 0.4 0.7 0.0 0.0 0.2 0.0 0.2 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.9 0.0 0.8 1.6 0.0 1.4 1.6 0.0 0.0 0.7 0.0 0.8 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 9.1 0.0 9.2 9.8 0.0 10.0 17.7 0.0 0.0 12.4 0.0 11.2 LnGrp LOS A A A A A A B A A B A B Approach Vol, veh/h 296 465 172 213 Approach Delay, s/veh 9.2 9.9 17.7 11.7 Approach LOS A A B B Timer - Assigned Phs 2 4 6 7 8 Phs Duration (G+Y+Rc), s 25.4 22.7 25.4 7.0 15.7 Change Period (Y+Rc), s 5.4 5.9 5.4 4.0 5.9 Max Green Setting (Gmax), s 30.6 33.1 30.6 8.0 21.1 Max Q Clear Time (g_c+I1), s 4.9 4.5 6.9 4.0 6.5 Green Ext Time (p_c), s 1.9 0.7 3.1 0.1 0.8 Intersection Summary HCM 6th Ctrl Delay 11.2 HCM 6th LOS B HCM 6th AWSC 28: N. Wallace Ave & E Tamarack St 01/19/2022 Nest Brewery Site 01/18/2022 PM Peak Existing (2021)Synchro 10 Report Page 14 Intersection Intersection Delay, s/veh 8.1 Intersection LOS A Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 15 21 35 1 16 12 57 53 3 14 72 19 Future Vol, veh/h 15 21 35 1 16 12 57 53 3 14 72 19 Peak Hour Factor 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 Heavy Vehicles, % 20 0 0 0 0 0 0 0 0 0 1 21 Mvmt Flow 18 25 42 1 19 14 69 64 4 17 87 23 Number of Lanes 0 1 0 0 1 0 0 1 0 0 1 0 Approach EB WB NB SB Opposing Approach WB EB SB NB Opposing Lanes 1 1 1 1 Conflicting Approach Left SB NB EB WB Conflicting Lanes Left 1 1 1 1 Conflicting Approach Right NB SB WB EB Conflicting Lanes Right 1 1 1 1 HCM Control Delay 8.2 7.6 8.3 8 HCM LOS A A A A Lane NBLn1 EBLn1 WBLn1 SBLn1 Vol Left, % 50% 21% 3% 13% Vol Thru, % 47% 30% 55% 69% Vol Right, % 3% 49% 41% 18% Sign Control Stop Stop Stop Stop Traffic Vol by Lane 113 71 29 105 LT Vol 57 15 1 14 Through Vol 53 21 16 72 RT Vol 3 35 12 19 Lane Flow Rate 136 86 35 127 Geometry Grp 1 1 1 1 Degree of Util (X) 0.166 0.11 0.042 0.149 Departure Headway (Hd) 4.401 4.613 4.347 4.249 Convergence, Y/N Yes Yes Yes Yes Cap 817 779 825 846 Service Time 2.415 2.629 2.367 2.262 HCM Lane V/C Ratio 0.166 0.11 0.042 0.15 HCM Control Delay 8.3 8.2 7.6 8 HCM Lane LOS A A A A HCM 95th-tile Q 0.6 0.4 0.1 0.5 APPENDIX C CAPACITY CALCULATIONS – DESIGN YEAR (2024) Avg Delay (s/veh) LOS 95th % Queue (veh) Avg Delay (s/veh) LOS 95th % Queue (veh) EB 19.5 B 8 32.7 C 11 WB 22.9 C 1 25.2 C 1 NB 7.0 A 6 9.1 A 9 SB 11.3 B 11 16.2 B 14 Intersection 12.8 B --17.8 B -- EB 23.5 C 3 21.5 C 3 WB 26.1 C 2 26.1 C 3 NB 12.3 B 9 16.7 B 12 SB 9.2 A 9 14.6 B 13 Intersection 13.2 B --18.1 B -- EB 21.2 C 4 22.2 C 4 WB 22.8 C 3 24.5 C 5 NB 11.7 B 8 12.9 B 10 SB 11.4 B 9 14.3 B 13 Intersection 14.5 B --17.0 B -- WB 18.6 B 2 18.7 B 3 NB 6.3 A 6 7.0 A 6 SB 6.2 A 4 7.4 A 6 Intersection 8.8 A --9.7 A -- EB 8.9 A 3 10.0 B 4 WB 9.2 A 3 10.8 B 5 NB 17.2 B 4 18.5 B 5 SB 11.8 B 2 11.9 B 2 Intersection 10.8 B --11.9 B -- EB 10.3 B 2 10.4 B 2 WB 8.1 A 1 8.6 A 1 NB 9.4 A 1 9.9 A 2 SB 8.8 A 1 11.2 B 3 Intersection 9.6 A --10.6 B -- EB 8.7 A 1 9.3 A 1 WB 8.2 A 1 9.5 A 2 NB 8.7 A 1 9.0 A 1 SB 8.4 A 1 10.1 B 2 Intersection 8.5 A --9.6 A -- EB 3.6 A 3 5.6 A 5 WB 3.8 A 4 5.9 A 5 NB 0.0 A 0 0.0 A 0 SB 18.7 B 2 18.4 B 4 Intersection 5.5 A --7.4 A -- EB 0.0 A 0 0.0 A 0 WB 0.4 A 0 0.4 A 0 NB 10.6 B 1 11.3 B 1 Intersection 0.7 A --0.9 A -- East Main Street & North Rouse Avenue Intersection Approach Future Year (2024) AM Peak PM Peak Signalized Intersection Control Signalized Intersection Control East Oak Street & North Rouse Avenue Intersection Control Signalized East Tamarack Street & North Rouse Avenue East Peach Street & North Rouse Avenue Intersection Control Signalized East Mendenhall Street & North Rouse Avenue Intersection Control Signalized Intersection Control All-Way Stop-Control East Tamarack Street & North Wallace Avenue Intersection Control All-Way Stop-Control East Tamarack Street & Site Access East Peach Street & North Wallace Avenue Intersection Control Signalized East Main Street & North Broadway Avenue Intersection Control One-Way Stop-Control (NB) Queues 2: N Rouse Ave & E Mendenhall St 02/08/2022 Nest Brewery Site 01/18/2022 AM Peak Future (2024)Synchro 10 Report Page 1 Lane Group WBT WBR NBL NBT SBL SBT SBR Lane Group Flow (vph) 131 60 63 336 37 208 92 v/c Ratio 0.25 0.19 0.09 0.33 0.05 0.22 0.12 Control Delay 18.4 4.5 3.8 9.4 3.7 9.7 3.3 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 18.4 4.5 3.8 9.4 3.7 9.7 3.3 Queue Length 50th (ft) 17 0 5 34 3 36 0 Queue Length 95th (ft) 35 15 15 128 10 78 20 Internal Link Dist (ft) 432 295 1843 Turn Bay Length (ft) 85 80 65 65 Base Capacity (vph) 1875 876 714 1210 689 1210 980 Starvation Cap Reductn 0 0 0 122 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.07 0.07 0.09 0.31 0.05 0.17 0.09 Intersection Summary HCM 6th Signalized Intersection Summary 2: N Rouse Ave & E Mendenhall St 02/08/2022 Nest Brewery Site 01/18/2022 AM Peak Future (2024)Synchro 10 Report Page 2 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 0 0 0 9 111 55 58 298 11 34 191 85 Future Volume (veh/h) 0 0 0 9 111 55 58 298 11 34 191 85 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1750 1695 1695 1654 1709 1614 1709 1709 1600 Adj Flow Rate, veh/h 10 121 60 63 324 12 37 208 92 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 0 4 4 7 3 10 3 3 11 Cap, veh/h 26 328 154 698 824 31 636 825 655 Arrive On Green 0.11 0.11 0.11 0.06 0.50 0.50 0.04 0.48 0.48 Sat Flow, veh/h 240 3054 1437 1576 1637 61 1628 1709 1356 Grp Volume(v), veh/h 70 61 60 63 0 336 37 208 92 Grp Sat Flow(s),veh/h/ln 1683 1611 1437 1576 0 1698 1628 1709 1356 Q Serve(g_s), s 1.6 1.5 1.6 0.8 0.0 5.1 0.5 3.0 1.6 Cycle Q Clear(g_c), s 1.6 1.5 1.6 0.8 0.0 5.1 0.5 3.0 1.6 Prop In Lane 0.14 1.00 1.00 0.04 1.00 1.00 Lane Grp Cap(c), veh/h 181 173 154 698 0 855 636 825 655 V/C Ratio(X)0.39 0.35 0.39 0.09 0.00 0.39 0.06 0.25 0.14 Avail Cap(c_a), veh/h 1049 1003 895 828 0 1181 804 1188 943 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 17.2 17.2 17.2 4.6 0.0 6.4 5.0 6.3 5.9 Incr Delay (d2), s/veh 1.4 1.2 1.6 0.1 0.0 0.3 0.0 0.2 0.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.6 0.5 0.5 0.2 0.0 1.3 0.1 0.8 0.3 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 18.6 18.4 18.8 4.6 0.0 6.7 5.1 6.5 6.0 LnGrp LOS B B B A A A A A A Approach Vol, veh/h 191 399 337 Approach Delay, s/veh 18.6 6.3 6.2 Approach LOS B A A Timer - Assigned Phs 1 2 5 6 8 Phs Duration (G+Y+Rc), s 5.7 26.0 6.6 25.2 9.6 Change Period (Y+Rc), s 4.0 * 5.2 4.0 * 5.2 5.2 Max Green Setting (Gmax), s 6.0 * 29 6.0 * 29 25.8 Max Q Clear Time (g_c+I1), s 2.5 7.1 2.8 5.0 3.6 Green Ext Time (p_c), s 0.0 2.1 0.0 1.6 0.9 Intersection Summary HCM 6th Ctrl Delay 8.8 HCM 6th LOS A Notes * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. Queues 3: N Rouse Ave & E Peach St 02/08/2022 Nest Brewery Site 01/18/2022 AM Peak Future (2024)Synchro 10 Report Page 3 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT SBL SBT Lane Group Flow (vph) 53 89 58 11 52 42 18 313 39 368 v/c Ratio 0.16 0.23 0.15 0.04 0.23 0.16 0.03 0.34 0.07 0.38 Control Delay 16.9 22.2 3.2 16.2 29.1 1.4 7.7 14.6 7.7 13.2 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 16.9 22.2 3.2 16.2 29.1 1.4 7.7 14.6 7.7 13.2 Queue Length 50th (ft) 11 20 0 2 16 0 3 65 6 80 Queue Length 95th (ft) 40 76 13 14 53 3 12 181 20 216 Internal Link Dist (ft) 361 770 1843 998 Turn Bay Length (ft) 80 80 75 80 30 30 Base Capacity (vph) 625 905 791 650 888 769 724 1104 772 1104 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.08 0.10 0.07 0.02 0.06 0.05 0.02 0.28 0.05 0.33 Intersection Summary HCM 6th Signalized Intersection Summary 3: N Rouse Ave & E Peach St 02/08/2022 Nest Brewery Site 01/18/2022 AM Peak Future (2024)Synchro 10 Report Page 4 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 49 82 53 10 48 39 17 247 41 36 295 43 Future Volume (veh/h) 49 82 53 10 48 39 17 247 41 36 295 43 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 0.97 0.94 0.97 0.93 1.00 0.98 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1709 1723 1750 1750 1695 1709 1504 1723 1682 1600 1709 1641 Adj Flow Rate, veh/h 53 89 58 11 52 42 18 268 45 39 321 47 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 3 2 0 0 4 3 18 2 5 11 3 8 Cap, veh/h 337 289 234 298 224 179 418 620 104 485 656 96 Arrive On Green 0.05 0.17 0.17 0.01 0.13 0.13 0.02 0.43 0.43 0.04 0.45 0.45 Sat Flow, veh/h 1628 1723 1391 1667 1695 1354 1433 1432 240 1524 1452 213 Grp Volume(v), veh/h 53 89 58 11 52 42 18 0 313 39 0 368 Grp Sat Flow(s),veh/h/ln 1628 1723 1391 1667 1695 1354 1433 0 1672 1524 0 1664 Q Serve(g_s), s 1.6 2.6 2.1 0.3 1.6 1.6 0.4 0.0 7.5 0.8 0.0 9.0 Cycle Q Clear(g_c), s 1.6 2.6 2.1 0.3 1.6 1.6 0.4 0.0 7.5 0.8 0.0 9.0 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.14 1.00 0.13 Lane Grp Cap(c), veh/h 337 289 234 298 224 179 418 0 724 485 0 752 V/C Ratio(X) 0.16 0.31 0.25 0.04 0.23 0.23 0.04 0.00 0.43 0.08 0.00 0.49 Avail Cap(c_a), veh/h 848 874 706 881 860 687 908 0 979 978 0 975 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 19.9 21.1 20.9 21.2 22.4 22.4 9.2 0.0 11.4 8.7 0.0 11.1 Incr Delay (d2), s/veh 0.2 0.6 0.5 0.0 0.5 0.7 0.0 0.0 0.4 0.1 0.0 0.5 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.6 1.0 0.7 0.1 0.6 0.5 0.1 0.0 2.6 0.2 0.0 3.0 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 20.2 21.7 21.4 21.2 22.9 23.1 9.3 0.0 11.8 8.8 0.0 11.6 LnGrp LOS C C C C C C A A B A A B Approach Vol, veh/h 200 105 331 407 Approach Delay, s/veh 21.2 22.8 11.7 11.4 Approach LOS C C B B Timer - Assigned Phs 1 2 3 4 5 6 7 8 Phs Duration (G+Y+Rc), s 6.3 31.2 4.8 15.4 5.3 32.3 6.9 13.3 Change Period (Y+Rc), s 4.0 * 6.2 4.0 * 5.7 4.0 * 6.2 4.0 * 5.7 Max Green Setting (Gmax), s 21.0 * 34 21.0 * 29 21.0 * 34 21.0 * 29 Max Q Clear Time (g_c+I1), s 2.8 9.5 2.3 4.6 2.4 11.0 3.6 3.6 Green Ext Time (p_c), s 0.1 2.0 0.0 0.7 0.0 2.4 0.1 0.4 Intersection Summary HCM 6th Ctrl Delay 14.5 HCM 6th LOS B Notes * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. Queues 8: N Rouse Ave & E Oak St/E Birch St 02/08/2022 Nest Brewery Site 01/18/2022 AM Peak Future (2024)Synchro 10 Report Page 5 Lane Group EBT EBR WBL WBR NBL NBT SBT SBR Lane Group Flow (vph) 234 228 4 1 109 303 348 174 v/c Ratio 0.71 0.30 0.02 0.00 0.20 0.32 0.53 0.29 Control Delay 36.3 2.6 20.0 0.0 8.3 10.5 22.6 10.3 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 36.3 2.6 20.0 0.0 8.3 10.5 22.6 10.3 Queue Length 50th (ft) 85 0 1 0 17 60 107 19 Queue Length 95th (ft) 192 31 9 0 52 150 256 80 Internal Link Dist (ft) 490 975 339 Turn Bay Length (ft) 140 30 30 200 80 Base Capacity (vph) 622 1071 386 1026 785 1591 979 834 Starvation Cap Reductn 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.38 0.21 0.01 0.00 0.14 0.19 0.36 0.21 Intersection Summary HCM 6th Signalized Intersection Summary 8: N Rouse Ave & E Oak St/E Birch St 02/08/2022 Nest Brewery Site 01/18/2022 AM Peak Future (2024)Synchro 10 Report Page 6 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 214 1 210 4 0 1 100 279 0 0 320 160 Future Volume (veh/h) 214 1 210 4 0 1 100 279 0 0 320 160 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 1.00 1.00 1.00 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1723 1750 1709 1409 1750 1750 1709 1709 1750 1750 1723 1695 Adj Flow Rate, veh/h 233 1 228 4 0 1 109 303 0 0 348 174 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 0 3 25 0 0 3 3 0 0 2 4 Cap, veh/h 453 1 426 200 400 338 501 962 0 126 755 613 Arrive On Green 0.23 0.23 0.23 0.23 0.00 0.23 0.07 0.56 0.00 0.00 0.44 0.44 Sat Flow, veh/h 1427 6 1406 940 1750 1477 1628 1709 0 1093 1723 1400 Grp Volume(v), veh/h 234 0 228 4 0 1 109 303 0 0 348 174 Grp Sat Flow(s),veh/h/ln 1434 0 1406 940 1750 1477 1628 1709 0 1093 1723 1400 Q Serve(g_s), s 8.6 0.0 7.7 0.2 0.0 0.0 1.9 5.4 0.0 0.0 8.1 4.6 Cycle Q Clear(g_c), s 8.6 0.0 7.7 8.8 0.0 0.0 1.9 5.4 0.0 0.0 8.1 4.6 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 Lane Grp Cap(c), veh/h 454 0 426 200 400 338 501 962 0 126 755 613 V/C Ratio(X) 0.52 0.00 0.54 0.02 0.00 0.00 0.22 0.32 0.00 0.00 0.46 0.28 Avail Cap(c_a), veh/h 982 0 945 546 1046 882 1154 1168 0 394 1177 956 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 0.00 0.00 1.00 1.00 Uniform Delay (d), s/veh 20.3 0.0 16.6 24.3 0.0 17.0 7.4 6.6 0.0 0.0 11.3 10.3 Incr Delay (d2), s/veh 0.9 0.0 1.0 0.0 0.0 0.0 0.2 0.2 0.0 0.0 0.4 0.3 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.7 0.0 2.4 0.1 0.0 0.0 0.6 1.6 0.0 0.0 2.8 1.3 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 21.2 0.0 17.7 24.4 0.0 17.0 7.6 6.8 0.0 0.0 11.7 10.5 LnGrp LOS C A B C A B A A A A B B Approach Vol, veh/h 462 5 412 522 Approach Delay, s/veh 19.5 22.9 7.0 11.3 Approach LOS B C A B Timer - Assigned Phs 2 4 5 6 8 Phs Duration (G+Y+Rc), s 38.1 19.0 7.1 31.0 19.0 Change Period (Y+Rc), s 6.0 5.9 3.0 6.0 5.9 Max Green Setting (Gmax), s 39.0 34.1 27.0 39.0 34.1 Max Q Clear Time (g_c+I1), s 7.4 10.6 3.9 10.1 10.8 Green Ext Time (p_c), s 2.0 2.1 0.3 3.0 0.0 Intersection Summary HCM 6th Ctrl Delay 12.8 HCM 6th LOS B Queues 10: Private Entrance/N. Broadway Ave & E Main St 02/08/2022 Nest Brewery Site 01/18/2022 AM Peak Future (2024)Synchro 10 Report Page 7 Lane Group EBT WBT SBT Lane Group Flow (vph) 349 511 114 v/c Ratio 0.20 0.27 0.40 Control Delay 7.0 6.5 14.7 Queue Delay 0.0 0.0 0.0 Total Delay 7.0 6.5 14.7 Queue Length 50th (ft) 20 26 16 Queue Length 95th (ft) 64 84 47 Internal Link Dist (ft) 1464 412 414 Turn Bay Length (ft) Base Capacity (vph) 2415 2637 608 Starvation Cap Reductn 0 0 0 Spillback Cap Reductn 0 0 0 Storage Cap Reductn 0 0 0 Reduced v/c Ratio 0.14 0.19 0.19 Intersection Summary HCM 6th Signalized Intersection Summary 10: Private Entrance/N. Broadway Ave & E Main St 02/08/2022 Nest Brewery Site 01/18/2022 AM Peak Future (2024)Synchro 10 Report Page 8 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 39 282 0 1 382 87 0 0 0 83 0 22 Future Volume (veh/h) 39 282 0 1 382 87 0 0 0 83 0 22 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1709 1695 1750 1750 1723 1695 1750 1750 1750 1682 1750 1682 Adj Flow Rate, veh/h 42 307 0 1 415 95 0 0 0 90 0 24 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 3 4 0 0 2 4 0 0 0 5 0 5 Cap, veh/h 255 1649 0 89 1587 359 0 175 0 272 0 31 Arrive On Green 0.61 0.61 0.00 0.61 0.61 0.61 0.00 0.00 0.00 0.10 0.00 0.10 Sat Flow, veh/h 239 2775 0 1 2596 587 0 1750 0 1144 0 305 Grp Volume(v), veh/h 182 167 0 274 0 237 0 0 0 114 0 0 Grp Sat Flow(s),veh/h/ln 1471 1466 0 1722 0 1462 0 1750 0 1449 0 0 Q Serve(g_s), s 0.0 2.0 0.0 0.0 0.0 3.1 0.0 0.0 0.0 3.1 0.0 0.0 Cycle Q Clear(g_c), s 1.9 2.0 0.0 3.0 0.0 3.1 0.0 0.0 0.0 3.1 0.0 0.0 Prop In Lane 0.23 0.00 0.00 0.40 0.00 0.00 0.79 0.21 Lane Grp Cap(c), veh/h 1008 896 0 1141 0 894 0 175 0 303 0 0 V/C Ratio(X) 0.18 0.19 0.00 0.24 0.00 0.26 0.00 0.00 0.00 0.38 0.00 0.00 Avail Cap(c_a), veh/h 1557 1473 0 1818 0 1469 0 946 0 940 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 0.00 1.00 0.00 1.00 0.00 0.00 0.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 3.5 3.5 0.0 3.7 0.0 3.7 0.0 0.0 0.0 18.0 0.0 0.0 Incr Delay (d2), s/veh 0.1 0.1 0.0 0.1 0.0 0.2 0.0 0.0 0.0 0.8 0.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.4 0.4 0.0 0.6 0.0 0.5 0.0 0.0 0.0 1.0 0.0 0.0 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 3.5 3.6 0.0 3.8 0.0 3.8 0.0 0.0 0.0 18.7 0.0 0.0 LnGrp LOS A A A A A A A A A B A A Approach Vol, veh/h 349 511 0 114 Approach Delay, s/veh 3.6 3.8 0.0 18.7 Approach LOS A A B Timer - Assigned Phs 2 4 6 8 Phs Duration (G+Y+Rc), s 30.9 10.0 30.9 10.0 Change Period (Y+Rc), s 5.9 5.9 5.9 5.9 Max Green Setting (Gmax), s 41.1 22.1 41.1 22.1 Max Q Clear Time (g_c+I1), s 4.0 5.1 5.1 0.0 Green Ext Time (p_c), s 2.5 0.5 3.7 0.0 Intersection Summary HCM 6th Ctrl Delay 5.5 HCM 6th LOS A HCM 6th TWSC 11: Site Access & E Tamarack St 02/08/2022 Nest Brewery Site 01/18/2022 AM Peak Future (2024)Synchro 10 Report Page 9 Intersection Int Delay, s/veh 0.7 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 237 8 6 104 13 6 Future Vol, veh/h 237 8 6 104 13 6 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 0 0 0 0 0 0 Mvmt Flow 258 9 7 113 14 7 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 267 0 390 263 Stage 1 - - - - 263 - Stage 2 - - - - 127 - Critical Hdwy - - 4.1 - 6.4 6.2 Critical Hdwy Stg 1 - - - - 5.4 - Critical Hdwy Stg 2 - - - - 5.4 - Follow-up Hdwy - - 2.2 - 3.5 3.3 Pot Cap-1 Maneuver - - 1308 - 618 781 Stage 1 - - - - 786 - Stage 2 - - - - 904 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - 1308 - 614 781 Mov Cap-2 Maneuver - - - - 614 - Stage 1 - - - - 786 - Stage 2 - - - - 899 - Approach EB WB NB HCM Control Delay, s 0 0.4 10.6 HCM LOS B Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h) 658 - - 1308 - HCM Lane V/C Ratio 0.031 - - 0.005 - HCM Control Delay (s) 10.6 - - 7.8 0 HCM Lane LOS B - - A A HCM 95th %tile Q(veh) 0.1 - - 0 - Queues 14: N Rouse Ave & E Tamarack St 02/08/2022 Nest Brewery Site 01/18/2022 AM Peak Future (2024)Synchro 10 Report Page 10 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT SBL SBT Lane Group Flow (vph) 24 46 17 28 15 91 12 356 173 389 v/c Ratio 0.09 0.21 0.07 0.10 0.07 0.36 0.02 0.47 0.26 0.35 Control Delay 20.3 30.3 0.6 20.5 29.3 12.3 6.4 17.7 6.6 10.3 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 20.3 30.3 0.6 20.5 29.3 12.3 6.4 17.7 6.6 10.3 Queue Length 50th (ft) 7 14 0 8 5 0 1 81 15 47 Queue Length 95th (ft) 26 51 0 28 24 40 8 220 63 217 Internal Link Dist (ft) 417 591 998 975 Turn Bay Length (ft) 80 80 80 80 30 30 Base Capacity (vph) 689 1013 843 722 1043 862 979 1267 938 1247 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.03 0.05 0.02 0.04 0.01 0.11 0.01 0.28 0.18 0.31 Intersection Summary HCM 6th Signalized Intersection Summary 14: N Rouse Ave & E Tamarack St 02/08/2022 Nest Brewery Site 01/18/2022 AM Peak Future (2024)Synchro 10 Report Page 11 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 22 42 16 26 14 84 11 291 37 159 328 29 Future Volume (veh/h) 22 42 16 26 14 84 11 291 37 159 328 29 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 0.99 0.96 0.99 0.96 1.00 0.98 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1627 1709 1668 1695 1750 1682 1750 1723 1750 1750 1695 1682 Adj Flow Rate, veh/h 24 46 17 28 15 91 12 316 40 173 357 32 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 9 3 6 4 0 5 0 2 0 0 4 5 Cap, veh/h 294 188 150 286 199 156 506 644 81 561 771 69 Arrive On Green 0.03 0.11 0.11 0.03 0.11 0.11 0.02 0.43 0.43 0.09 0.50 0.50 Sat Flow, veh/h 1550 1709 1362 1615 1750 1374 1667 1494 189 1667 1530 137 Grp Volume(v), veh/h 24 46 17 28 15 91 12 0 356 173 0 389 Grp Sat Flow(s),veh/h/ln 1550 1709 1362 1615 1750 1374 1667 0 1683 1667 0 1667 Q Serve(g_s), s 0.8 1.4 0.7 0.9 0.4 3.6 0.2 0.0 8.9 3.0 0.0 8.8 Cycle Q Clear(g_c), s 0.8 1.4 0.7 0.9 0.4 3.6 0.2 0.0 8.9 3.0 0.0 8.8 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.11 1.00 0.08 Lane Grp Cap(c), veh/h 294 188 150 286 199 156 506 0 725 561 0 840 V/C Ratio(X) 0.08 0.24 0.11 0.10 0.08 0.58 0.02 0.00 0.49 0.31 0.00 0.46 Avail Cap(c_a), veh/h 946 1010 805 959 1035 812 1228 0 1276 1161 0 1264 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 21.9 23.6 23.3 21.8 23.0 24.4 9.1 0.0 11.9 7.7 0.0 9.3 Incr Delay (d2), s/veh 0.1 0.7 0.3 0.1 0.2 3.4 0.0 0.0 0.5 0.3 0.0 0.4 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.3 0.6 0.2 0.3 0.2 1.3 0.1 0.0 3.1 0.9 0.0 2.8 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 22.0 24.3 23.6 21.9 23.1 27.8 9.2 0.0 12.4 8.0 0.0 9.7 LnGrp LOS C C C C C C A A B A A A Approach Vol, veh/h 87 134 368 562 Approach Delay, s/veh 23.5 26.1 12.3 9.2 Approach LOS C C B A Timer - Assigned Phs 1 2 3 4 5 6 7 8 Phs Duration (G+Y+Rc), s 9.1 31.0 5.8 12.1 4.9 35.2 5.6 12.3 Change Period (Y+Rc), s 4.0 6.0 4.0 * 5.7 4.0 6.0 4.0 * 5.7 Max Green Setting (Gmax), s 26.0 44.0 26.0 * 34 26.0 44.0 26.0 * 34 Max Q Clear Time (g_c+I1), s 5.0 10.9 2.9 3.4 2.2 10.8 2.8 5.6 Green Ext Time (p_c), s 0.5 2.5 0.0 0.3 0.0 2.8 0.0 0.4 Intersection Summary HCM 6th Ctrl Delay 13.2 HCM 6th LOS B Notes * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. HCM 6th AWSC 19: N. Wallace Ave & E Peach St 02/08/2022 Nest Brewery Site 01/18/2022 AM Peak Future (2024)Synchro 10 Report Page 12 Intersection Intersection Delay, s/veh 8.5 Intersection LOS A Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 63 60 20 12 54 47 11 79 13 27 52 20 Future Vol, veh/h 63 60 20 12 54 47 11 79 13 27 52 20 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Heavy Vehicles, % 0 7 5 0 2 6 10 0 0 0 2 0 Mvmt Flow 68 65 22 13 59 51 12 86 14 29 57 22 Number of Lanes 0 1 0 0 1 0 0 1 0 0 1 0 Approach EB WB NB SB Opposing Approach WB EB SB NB Opposing Lanes 1 1 1 1 Conflicting Approach Left SB NB EB WB Conflicting Lanes Left 1 1 1 1 Conflicting Approach RightNB SB WB EB Conflicting Lanes Right 1 1 1 1 HCM Control Delay 8.7 8.2 8.7 8.4 HCM LOS A A A A Lane NBLn1 EBLn1WBLn1 SBLn1 Vol Left, % 11% 44% 11% 27% Vol Thru, % 77% 42% 48% 53% Vol Right, % 13% 14% 42% 20% Sign Control Stop Stop Stop Stop Traffic Vol by Lane 103 143 113 99 LT Vol 11 63 12 27 Through Vol 79 60 54 52 RT Vol 13 20 47 20 Lane Flow Rate 112 155 123 108 Geometry Grp 1 1 1 1 Degree of Util (X) 0.149 0.197 0.149 0.138 Departure Headway (Hd) 4.779 4.566 4.378 4.605 Convergence, Y/N Yes Yes Yes Yes Cap 749 785 818 777 Service Time 2.814 2.598 2.411 2.641 HCM Lane V/C Ratio 0.15 0.197 0.15 0.139 HCM Control Delay 8.7 8.7 8.2 8.4 HCM Lane LOS A A A A HCM 95th-tile Q 0.5 0.7 0.5 0.5 Queues 22: E Main St & N Rouse Ave 02/08/2022 Nest Brewery Site 01/18/2022 AM Peak Future (2024)Synchro 10 Report Page 13 Lane Group EBT WBT NBT SBL SBT Lane Group Flow (vph) 269 372 148 84 73 v/c Ratio 0.20 0.24 0.41 0.20 0.12 Control Delay 11.4 9.2 21.4 9.8 6.5 Queue Delay 0.0 0.0 0.0 0.0 0.0 Total Delay 11.4 9.2 21.4 9.8 6.5 Queue Length 50th (ft) 28 31 41 14 7 Queue Length 95th (ft) 58 64 85 34 26 Internal Link Dist (ft) 314 1464 268 295 Turn Bay Length (ft) 50 Base Capacity (vph) 1752 2040 703 450 1108 Starvation Cap Reductn 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 Reduced v/c Ratio 0.15 0.18 0.21 0.19 0.07 Intersection Summary HCM 6th Signalized Intersection Summary 22: E Main St & N Rouse Ave 02/08/2022 Nest Brewery Site 01/18/2022 AM Peak Future (2024)Synchro 10 Report Page 14 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 59 176 13 6 243 93 11 115 10 77 37 30 Future Volume (veh/h) 59 176 13 6 243 93 11 115 10 77 37 30 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1682 1695 1750 1750 1723 1695 1750 1682 1750 1668 1750 1695 Adj Flow Rate, veh/h 64 191 14 7 264 101 12 125 11 84 40 33 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 5 4 0 0 2 4 0 5 0 6 0 4 Cap, veh/h 318 882 67 85 962 352 94 291 24 518 302 249 Arrive On Green 0.42 0.42 0.42 0.42 0.42 0.42 0.20 0.20 0.20 0.06 0.34 0.34 Sat Flow, veh/h 489 2093 159 15 2283 836 59 1461 122 1589 887 732 Grp Volume(v), veh/h 136 0 133 201 0 171 148 0 0 84 0 73 Grp Sat Flow(s),veh/h/ln 1226 0 1514 1716 0 1417 1642 0 0 1589 0 1618 Q Serve(g_s), s 0.4 0.0 2.6 0.0 0.0 3.8 0.0 0.0 0.0 1.9 0.0 1.5 Cycle Q Clear(g_c), s 4.2 0.0 2.6 3.6 0.0 3.8 3.7 0.0 0.0 1.9 0.0 1.5 Prop In Lane 0.47 0.11 0.03 0.59 0.08 0.07 1.00 0.45 Lane Grp Cap(c), veh/h 629 0 638 802 0 598 409 0 0 518 0 550 V/C Ratio(X) 0.22 0.00 0.21 0.25 0.00 0.29 0.36 0.00 0.00 0.16 0.00 0.13 Avail Cap(c_a), veh/h 914 0 977 1181 0 914 807 0 0 696 0 1129 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 0.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 8.7 0.0 8.7 9.0 0.0 9.0 16.7 0.0 0.0 12.3 0.0 10.8 Incr Delay (d2), s/veh 0.2 0.0 0.2 0.2 0.0 0.3 0.5 0.0 0.0 0.1 0.0 0.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.8 0.0 0.8 1.2 0.0 1.0 1.3 0.0 0.0 0.6 0.0 0.5 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 8.9 0.0 8.9 9.1 0.0 9.3 17.2 0.0 0.0 12.5 0.0 10.9 LnGrp LOS A A A A A A B A A B A B Approach Vol, veh/h 269 372 148 157 Approach Delay, s/veh 8.9 9.2 17.2 11.8 Approach LOS A A B B Timer - Assigned Phs 2 4 6 7 8 Phs Duration (G+Y+Rc), s 25.4 22.0 25.4 6.7 15.4 Change Period (Y+Rc), s 5.4 5.9 5.4 4.0 5.9 Max Green Setting (Gmax), s 30.6 33.1 30.6 8.0 21.1 Max Q Clear Time (g_c+I1), s 6.2 3.5 5.8 3.9 5.7 Green Ext Time (p_c), s 1.8 0.4 2.4 0.1 0.7 Intersection Summary HCM 6th Ctrl Delay 10.8 HCM 6th LOS B HCM 6th AWSC 28: N. Wallace Ave & E Tamarack St 02/08/2022 Nest Brewery Site 01/18/2022 AM Peak Future (2024)Synchro 10 Report Page 15 Intersection Intersection Delay, s/veh 9.6 Intersection LOS A Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 153 31 59 0 20 6 48 108 0 16 52 42 Future Vol, veh/h 153 31 59 0 20 6 48 108 0 16 52 42 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Heavy Vehicles, % 7 0 0 0 5 0 2 1 0 13 3 2 Mvmt Flow 166 34 64 0 22 7 52 117 0 17 57 46 Number of Lanes 0 1 0 0 1 0 0 1 0 0 1 0 Approach EB WB NB SB Opposing Approach WB EB SB NB Opposing Lanes 1 1 1 1 Conflicting Approach Left SB NB EB WB Conflicting Lanes Left 1 1 1 1 Conflicting Approach RightNB SB WB EB Conflicting Lanes Right 1 1 1 1 HCM Control Delay 10.3 8.1 9.4 8.8 HCM LOS B A A A Lane NBLn1 EBLn1WBLn1 SBLn1 Vol Left, % 31% 63% 0% 15% Vol Thru, % 69% 13% 77% 47% Vol Right, % 0% 24% 23% 38% Sign Control Stop Stop Stop Stop Traffic Vol by Lane 156 243 26 110 LT Vol 48 153 0 16 Through Vol 108 31 20 52 RT Vol 0 59 6 42 Lane Flow Rate 170 264 28 120 Geometry Grp 1 1 1 1 Degree of Util (X) 0.229 0.348 0.038 0.161 Departure Headway (Hd) 4.86 4.737 4.886 4.85 Convergence, Y/N Yes Yes Yes Yes Cap 736 758 728 737 Service Time 2.907 2.778 2.946 2.901 HCM Lane V/C Ratio 0.231 0.348 0.038 0.163 HCM Control Delay 9.4 10.3 8.1 8.8 HCM Lane LOS A B A A HCM 95th-tile Q 0.9 1.6 0.1 0.6 Queues 2: N Rouse Ave & E Mendenhall St 02/08/2022 Nest Brewery Site 01/18/2022 PM Peak Future (2024)Synchro 10 Report Page 1 Lane Group WBT WBR NBL NBT SBL SBT SBR Lane Group Flow (vph) 201 65 77 333 48 322 170 v/c Ratio 0.33 0.19 0.13 0.38 0.07 0.39 0.22 Control Delay 18.8 4.8 4.6 10.6 4.3 11.8 3.9 Queue Delay 0.0 0.0 0.0 0.1 0.0 0.0 0.0 Total Delay 18.8 4.8 4.6 10.7 4.3 11.8 3.9 Queue Length 50th (ft) 26 0 6 37 4 62 4 Queue Length 95th (ft) 52 17 21 137 15 131 34 Internal Link Dist (ft) 432 295 1843 Turn Bay Length (ft) 85 80 65 65 Base Capacity (vph) 1838 846 615 1077 644 1102 982 Starvation Cap Reductn 0 0 0 124 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.11 0.08 0.13 0.35 0.07 0.29 0.17 Intersection Summary HCM 6th Signalized Intersection Summary 2: N Rouse Ave & E Mendenhall St 02/08/2022 Nest Brewery Site 01/18/2022 PM Peak Future (2024)Synchro 10 Report Page 2 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 0 0 0 3 182 60 71 302 5 44 296 156 Future Volume (veh/h) 0 0 0 3 182 60 71 302 5 44 296 156 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1750 1723 1695 1709 1709 1750 1750 1750 1736 Adj Flow Rate, veh/h 3 198 65 77 328 5 48 322 170 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 0 2 4 3 3 0 0 0 1 Cap, veh/h 6 430 187 591 813 12 634 814 685 Arrive On Green 0.13 0.13 0.13 0.07 0.48 0.48 0.05 0.47 0.47 Sat Flow, veh/h 48 3309 1437 1628 1679 26 1667 1750 1471 Grp Volume(v), veh/h 108 93 65 77 0 333 48 322 170 Grp Sat Flow(s),veh/h/ln 1720 1637 1437 1628 0 1704 1667 1750 1471 Q Serve(g_s), s 2.5 2.3 1.8 1.0 0.0 5.4 0.6 5.2 3.0 Cycle Q Clear(g_c), s 2.5 2.3 1.8 1.0 0.0 5.4 0.6 5.2 3.0 Prop In Lane 0.03 1.00 1.00 0.02 1.00 1.00 Lane Grp Cap(c), veh/h 223 212 187 591 0 826 634 814 685 V/C Ratio(X)0.48 0.44 0.35 0.13 0.00 0.40 0.08 0.40 0.25 Avail Cap(c_a), veh/h 1033 982 862 704 0 1142 782 1172 986 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 17.4 17.3 17.0 5.2 0.0 7.1 5.4 7.5 6.9 Incr Delay (d2), s/veh 1.6 1.4 1.1 0.1 0.0 0.3 0.1 0.3 0.2 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.0 0.8 0.6 0.2 0.0 1.5 0.2 1.5 0.7 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 19.0 18.7 18.2 5.3 0.0 7.4 5.5 7.8 7.1 LnGrp LOS B B B A A A A A A Approach Vol, veh/h 266 410 540 Approach Delay, s/veh 18.7 7.0 7.4 Approach LOS B A A Timer - Assigned Phs 1 2 5 6 8 Phs Duration (G+Y+Rc), s 6.2 26.0 7.0 25.2 10.8 Change Period (Y+Rc), s 4.0 * 5.2 4.0 * 5.2 5.2 Max Green Setting (Gmax), s 6.0 * 29 6.0 * 29 25.8 Max Q Clear Time (g_c+I1), s 2.6 7.4 3.0 7.2 4.5 Green Ext Time (p_c), s 0.0 2.1 0.0 2.6 1.3 Intersection Summary HCM 6th Ctrl Delay 9.7 HCM 6th LOS A Notes * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. Queues 3: N Rouse Ave & E Peach St 02/08/2022 Nest Brewery Site 01/18/2022 PM Peak Future (2024)Synchro 10 Report Page 3 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT SBL SBT Lane Group Flow (vph) 75 96 83 34 122 78 51 361 46 448 v/c Ratio 0.20 0.27 0.22 0.10 0.46 0.26 0.11 0.48 0.09 0.60 Control Delay 20.0 30.0 6.8 19.3 37.3 7.2 9.2 19.6 9.1 22.3 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 20.0 30.0 6.8 19.3 37.3 7.2 9.2 19.6 9.1 22.3 Queue Length 50th (ft) 25 42 0 11 55 0 10 125 9 167 Queue Length 95th (ft) 57 89 29 32 114 27 29 240 27 316 Internal Link Dist (ft) 361 770 1843 998 Turn Bay Length (ft) 80 80 75 80 30 30 Base Capacity (vph) 569 765 688 561 765 685 687 866 694 852 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.13 0.13 0.12 0.06 0.16 0.11 0.07 0.42 0.07 0.53 Intersection Summary HCM 6th Signalized Intersection Summary 3: N Rouse Ave & E Peach St 02/08/2022 Nest Brewery Site 01/18/2022 PM Peak Future (2024)Synchro 10 Report Page 4 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 69 88 76 31 112 72 47 302 30 42 334 78 Future Volume (veh/h) 69 88 76 31 112 72 47 302 30 42 334 78 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 0.99 0.98 0.98 0.94 1.00 0.98 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1723 1736 1750 1668 1736 1750 1750 1723 1750 1682 1723 1750 Adj Flow Rate, veh/h 75 96 83 34 122 78 51 328 33 46 363 85 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 1 0 6 1 0 0 2 0 5 2 0 Cap, veh/h 306 284 238 310 244 196 395 648 65 456 562 132 Arrive On Green 0.06 0.16 0.16 0.04 0.14 0.14 0.05 0.42 0.42 0.04 0.42 0.42 Sat Flow, veh/h 1641 1736 1456 1589 1736 1399 1667 1536 155 1602 1342 314 Grp Volume(v), veh/h 75 96 83 34 122 78 51 0 361 46 0 448 Grp Sat Flow(s),veh/h/ln 1641 1736 1456 1589 1736 1399 1667 0 1691 1602 0 1656 Q Serve(g_s), s 2.3 2.9 3.0 1.1 3.9 3.0 1.0 0.0 9.4 0.9 0.0 12.9 Cycle Q Clear(g_c), s 2.3 2.9 3.0 1.1 3.9 3.0 1.0 0.0 9.4 0.9 0.0 12.9 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.09 1.00 0.19 Lane Grp Cap(c), veh/h 306 284 238 310 244 196 395 0 713 456 0 694 V/C Ratio(X) 0.24 0.34 0.35 0.11 0.50 0.40 0.13 0.00 0.51 0.10 0.00 0.65 Avail Cap(c_a), veh/h 786 852 715 812 852 687 902 0 957 948 0 938 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 20.2 22.1 22.1 20.7 23.7 23.4 10.2 0.0 12.7 9.6 0.0 13.8 Incr Delay (d2), s/veh 0.4 0.7 0.9 0.2 1.6 1.3 0.1 0.0 0.6 0.1 0.0 1.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.9 1.2 1.0 0.4 1.6 1.0 0.3 0.0 3.3 0.3 0.0 4.5 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 20.6 22.8 23.0 20.9 25.3 24.7 10.4 0.0 13.2 9.7 0.0 14.8 LnGrp LOS C C C C C C B A B A A B Approach Vol, veh/h 254 234 412 494 Approach Delay, s/veh 22.2 24.5 12.9 14.3 Approach LOS C C B B Timer - Assigned Phs 1 2 3 4 5 6 7 8 Phs Duration (G+Y+Rc), s 6.7 31.4 6.2 15.5 6.9 31.2 7.6 14.1 Change Period (Y+Rc), s 4.0 * 6.2 4.0 * 5.7 4.0 * 6.2 4.0 * 5.7 Max Green Setting (Gmax), s 21.0 * 34 21.0 * 29 21.0 * 34 21.0 * 29 Max Q Clear Time (g_c+I1), s 2.9 11.4 3.1 5.0 3.0 14.9 4.3 5.9 Green Ext Time (p_c), s 0.1 2.3 0.0 0.8 0.1 2.9 0.1 0.9 Intersection Summary HCM 6th Ctrl Delay 17.0 HCM 6th LOS B Notes * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. Queues 8: N Rouse Ave & E Oak St/E Birch St 02/08/2022 Nest Brewery Site 01/18/2022 PM Peak Future (2024)Synchro 10 Report Page 5 Lane Group EBT EBR WBT NBL NBT SBT SBR Lane Group Flow (vph) 253 226 3 295 419 362 248 v/c Ratio 0.83 0.43 0.01 0.48 0.38 0.52 0.38 Control Delay 57.8 6.9 28.3 11.1 11.1 28.1 13.0 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 57.8 6.9 28.3 11.1 11.1 28.1 13.0 Queue Length 50th (ft) 148 0 1 72 119 168 45 Queue Length 95th (ft) 263 57 9 143 222 327 133 Internal Link Dist (ft) 490 107 975 339 Turn Bay Length (ft) 140 200 80 Base Capacity (vph) 442 652 622 701 1247 698 661 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.57 0.35 0.00 0.42 0.34 0.52 0.38 Intersection Summary HCM 6th Signalized Intersection Summary 8: N Rouse Ave & E Oak St/E Birch St 02/08/2022 Nest Brewery Site 01/18/2022 PM Peak Future (2024)Synchro 10 Report Page 6 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 232 1 208 0 3 0 271 385 1 0 333 228 Future Volume (veh/h) 232 1 208 0 3 0 271 385 1 0 333 228 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 1.00 1.00 0.98 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1723 1750 1723 1750 1750 1750 1736 1736 1750 1750 1723 1736 Adj Flow Rate, veh/h 252 1 226 0 3 0 295 418 1 0 362 248 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 0 2 0 0 0 1 1 0 0 2 1 Cap, veh/h 401 1 314 0 387 328 550 1100 3 87 808 672 Arrive On Green 0.22 0.22 0.22 0.00 0.22 0.00 0.12 0.64 0.64 0.00 0.47 0.47 Sat Flow, veh/h 1420 6 1420 0 1750 1483 1654 1731 4 983 1723 1432 Grp Volume(v), veh/h 253 0 226 0 3 0 295 0 419 0 362 248 Grp Sat Flow(s),veh/h/ln 1425 0 1420 0 1750 1483 1654 0 1735 983 1723 1432 Q Serve(g_s), s 13.9 0.0 12.2 0.0 0.1 0.0 7.0 0.0 9.6 0.0 11.7 9.2 Cycle Q Clear(g_c), s 14.0 0.0 12.2 0.0 0.1 0.0 7.0 0.0 9.6 0.0 11.7 9.2 Prop In Lane 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 Lane Grp Cap(c), veh/h 402 0 314 0 387 328 550 0 1103 87 808 672 V/C Ratio(X) 0.63 0.00 0.72 0.00 0.01 0.00 0.54 0.00 0.38 0.00 0.45 0.37 Avail Cap(c_a), veh/h 673 0 583 0 718 608 872 0 1103 87 808 672 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 0.00 1.00 0.00 1.00 0.00 1.00 0.00 1.00 1.00 Uniform Delay (d), s/veh 30.7 0.0 30.0 0.0 25.2 0.0 9.4 0.0 7.3 0.0 14.8 14.2 Incr Delay (d2), s/veh 1.6 0.0 3.1 0.0 0.0 0.0 0.8 0.0 1.0 0.0 1.8 1.6 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 4.9 0.0 4.4 0.0 0.0 0.0 2.4 0.0 3.5 0.0 4.8 3.2 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 32.3 0.0 33.1 0.0 25.2 0.0 10.2 0.0 8.3 0.0 16.6 15.7 LnGrp LOS C A C A C A B A A A B B Approach Vol, veh/h 479 3 714 610 Approach Delay, s/veh 32.7 25.2 9.1 16.2 Approach LOS C C A B Timer - Assigned Phs 2 4 5 6 8 Phs Duration (G+Y+Rc), s 58.8 24.3 13.8 45.0 24.3 Change Period (Y+Rc), s 6.0 5.9 4.0 6.0 5.9 Max Green Setting (Gmax), s 39.0 34.1 26.0 39.0 34.1 Max Q Clear Time (g_c+I1), s 11.6 16.0 9.0 13.7 2.1 Green Ext Time (p_c), s 2.9 2.3 0.8 3.4 0.0 Intersection Summary HCM 6th Ctrl Delay 17.8 HCM 6th LOS B Queues 10: Private Entrance/N. Broadway Ave & E Main St 02/08/2022 Nest Brewery Site 01/18/2022 PM Peak Future (2024)Synchro 10 Report Page 7 Lane Group EBT WBT SBT Lane Group Flow (vph) 597 703 198 v/c Ratio 0.45 0.44 0.58 Control Delay 10.0 8.7 19.5 Queue Delay 0.0 0.0 0.0 Total Delay 10.0 8.7 19.5 Queue Length 50th (ft) 47 50 38 Queue Length 95th (ft) 118 122 86 Internal Link Dist (ft) 1464 412 414 Turn Bay Length (ft) Base Capacity (vph) 2159 2587 615 Starvation Cap Reductn 0 0 0 Spillback Cap Reductn 0 0 0 Storage Cap Reductn 0 0 0 Reduced v/c Ratio 0.28 0.27 0.32 Intersection Summary HCM 6th Signalized Intersection Summary 10: Private Entrance/N. Broadway Ave & E Main St 02/08/2022 Nest Brewery Site 01/18/2022 PM Peak Future (2024)Synchro 10 Report Page 8 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 78 471 0 2 518 127 0 0 0 149 0 33 Future Volume (veh/h) 78 471 0 2 518 127 0 0 0 149 0 33 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1736 1736 1750 1750 1736 1736 1750 1750 1750 1750 1750 1750 Adj Flow Rate, veh/h 85 512 0 2 563 138 0 0 0 162 0 36 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 1 1 0 0 1 1 0 0 0 0 0 0 Cap, veh/h 262 1411 0 82 1437 350 0 312 0 355 3 47 Arrive On Green 0.56 0.56 0.00 0.56 0.56 0.56 0.00 0.00 0.00 0.18 0.00 0.18 Sat Flow, veh/h 284 2607 0 1 2574 627 0 1750 0 1170 17 264 Grp Volume(v), veh/h 292 305 0 380 0 323 0 0 0 198 0 0 Grp Sat Flow(s),veh/h/ln 1311 1501 0 1735 0 1467 0 1750 0 1451 0 0 Q Serve(g_s), s 0.2 5.0 0.0 0.0 0.0 5.6 0.0 0.0 0.0 5.7 0.0 0.0 Cycle Q Clear(g_c), s 5.8 5.0 0.0 5.5 0.0 5.6 0.0 0.0 0.0 5.8 0.0 0.0 Prop In Lane 0.29 0.00 0.01 0.43 0.00 0.00 0.82 0.18 Lane Grp Cap(c), veh/h 835 838 0 1049 0 819 0 312 0 405 0 0 V/C Ratio(X) 0.35 0.36 0.00 0.36 0.00 0.39 0.00 0.00 0.00 0.49 0.00 0.00 Avail Cap(c_a), veh/h 1287 1377 0 1670 0 1346 0 863 0 861 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 0.00 1.00 0.00 1.00 0.00 0.00 0.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 5.3 5.5 0.0 5.6 0.0 5.6 0.0 0.0 0.0 17.5 0.0 0.0 Incr Delay (d2), s/veh 0.3 0.3 0.0 0.2 0.0 0.3 0.0 0.0 0.0 0.9 0.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.0 1.1 0.0 1.4 0.0 1.2 0.0 0.0 0.0 1.8 0.0 0.0 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 5.5 5.8 0.0 5.8 0.0 5.9 0.0 0.0 0.0 18.4 0.0 0.0 LnGrp LOS A A A A A A A A A B A A Approach Vol, veh/h 597 703 0 198 Approach Delay, s/veh 5.6 5.9 0.0 18.4 Approach LOS A A B Timer - Assigned Phs 2 4 6 8 Phs Duration (G+Y+Rc), s 30.9 13.9 30.9 13.9 Change Period (Y+Rc), s 5.9 5.9 5.9 5.9 Max Green Setting (Gmax), s 41.1 22.1 41.1 22.1 Max Q Clear Time (g_c+I1), s 7.8 7.8 7.6 0.0 Green Ext Time (p_c), s 4.8 0.9 5.3 0.0 Intersection Summary HCM 6th Ctrl Delay 7.4 HCM 6th LOS A HCM 6th TWSC 11: Site Access & E Tamarack St 02/08/2022 Nest Brewery Site 01/18/2022 PM Peak Future (2024)Synchro 10 Report Page 9 Intersection Int Delay, s/veh 0.9 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 169 19 15 255 18 9 Future Vol, veh/h 169 19 15 255 18 9 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 0 0 0 0 0 0 Mvmt Flow 184 21 16 277 20 10 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 205 0 504 195 Stage 1 - - - - 195 - Stage 2 - - - - 309 - Critical Hdwy - - 4.1 - 6.4 6.2 Critical Hdwy Stg 1 - - - - 5.4 - Critical Hdwy Stg 2 - - - - 5.4 - Follow-up Hdwy - - 2.2 - 3.5 3.3 Pot Cap-1 Maneuver - - 1378 - 531 851 Stage 1 - - - - 843 - Stage 2 - - - - 749 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - 1378 - 524 851 Mov Cap-2 Maneuver - - - - 524 - Stage 1 - - - - 843 - Stage 2 - - - - 739 - Approach EB WB NB HCM Control Delay, s 0 0.4 11.3 HCM LOS B Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h) 601 - - 1378 - HCM Lane V/C Ratio 0.049 - - 0.012 - HCM Control Delay (s) 11.3 - - 7.6 0 HCM Lane LOS B - - A A HCM 95th %tile Q(veh) 0.2 - - 0 - Queues 14: N Rouse Ave & E Tamarack St 02/08/2022 Nest Brewery Site 01/18/2022 PM Peak Future (2024)Synchro 10 Report Page 10 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT SBL SBT Lane Group Flow (vph) 35 41 28 49 50 203 30 452 129 486 v/c Ratio 0.12 0.20 0.12 0.16 0.25 0.58 0.06 0.61 0.26 0.55 Control Delay 22.4 34.6 1.0 22.8 35.2 13.0 6.9 20.9 7.7 17.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 22.4 34.6 1.0 22.8 35.2 13.0 6.9 20.9 7.7 17.1 Queue Length 50th (ft) 12 18 0 17 21 0 5 156 22 166 Queue Length 95th (ft) 36 51 0 47 60 62 17 300 52 309 Internal Link Dist (ft) 417 555 998 975 Turn Bay Length (ft) 80 80 80 80 30 30 Base Capacity (vph) 630 870 771 649 870 826 846 1115 784 1094 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.06 0.05 0.04 0.08 0.06 0.25 0.04 0.41 0.16 0.44 Intersection Summary HCM 6th Signalized Intersection Summary 14: N Rouse Ave & E Tamarack St 02/08/2022 Nest Brewery Site 01/18/2022 PM Peak Future (2024)Synchro 10 Report Page 11 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 32 38 26 45 46 187 28 382 34 119 389 58 Future Volume (veh/h) 32 38 26 45 46 187 28 382 34 119 389 58 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 0.98 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1709 1709 1695 1750 1709 1723 1750 1723 1750 1723 1709 1723 Adj Flow Rate, veh/h 35 41 28 49 50 203 30 415 37 129 423 63 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 3 3 4 0 3 2 0 2 0 2 3 2 Cap, veh/h 352 301 252 399 317 269 354 614 55 397 630 94 Arrive On Green 0.04 0.18 0.18 0.05 0.19 0.19 0.03 0.39 0.39 0.07 0.44 0.44 Sat Flow, veh/h 1628 1709 1429 1667 1709 1452 1667 1555 139 1641 1447 216 Grp Volume(v), veh/h 35 41 28 49 50 203 30 0 452 129 0 486 Grp Sat Flow(s),veh/h/ln 1628 1709 1429 1667 1709 1452 1667 0 1694 1641 0 1663 Q Serve(g_s), s 1.1 1.3 1.0 1.5 1.6 8.4 0.7 0.0 14.0 2.8 0.0 14.8 Cycle Q Clear(g_c), s 1.1 1.3 1.0 1.5 1.6 8.4 0.7 0.0 14.0 2.8 0.0 14.8 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.08 1.00 0.13 Lane Grp Cap(c), veh/h 352 301 252 399 317 269 354 0 668 397 0 723 V/C Ratio(X) 0.10 0.14 0.11 0.12 0.16 0.75 0.08 0.00 0.68 0.33 0.00 0.67 Avail Cap(c_a), veh/h 961 925 773 1007 925 786 984 0 1176 950 0 1155 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 20.1 22.0 21.9 19.8 21.7 24.4 11.8 0.0 15.8 11.4 0.0 14.3 Incr Delay (d2), s/veh 0.1 0.2 0.2 0.1 0.2 4.3 0.1 0.0 1.2 0.5 0.0 1.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.4 0.5 0.4 0.6 0.6 3.1 0.2 0.0 5.1 1.0 0.0 5.2 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 20.2 22.2 22.1 19.9 21.9 28.7 11.9 0.0 17.1 11.8 0.0 15.4 LnGrp LOS C C C B C C B A B B A B Approach Vol, veh/h 104 302 482 615 Approach Delay, s/veh 21.5 26.1 16.7 14.6 Approach LOS C C B B Timer - Assigned Phs 1 2 3 4 5 6 7 8 Phs Duration (G+Y+Rc), s 8.6 31.0 6.9 16.9 6.1 33.6 6.3 17.5 Change Period (Y+Rc), s 4.0 6.0 4.0 * 5.7 4.0 6.0 4.0 * 5.7 Max Green Setting (Gmax), s 26.0 44.0 26.0 * 34 26.0 44.0 26.0 * 34 Max Q Clear Time (g_c+I1), s 4.8 16.0 3.5 3.3 2.7 16.8 3.1 10.4 Green Ext Time (p_c), s 0.3 3.3 0.1 0.3 0.0 3.6 0.1 1.0 Intersection Summary HCM 6th Ctrl Delay 18.1 HCM 6th LOS B Notes * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. HCM 6th AWSC 19: N. Wallace Ave & E Peach St 02/08/2022 Nest Brewery Site 01/18/2022 PM Peak Future (2024)Synchro 10 Report Page 12 Intersection Intersection Delay, s/veh 9.6 Intersection LOS A Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 38 85 20 10 110 66 11 62 10 66 94 56 Future Vol, veh/h 38 85 20 10 110 66 11 62 10 66 94 56 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Heavy Vehicles, % 0 4 5 0 1 0 10 0 0 2 2 0 Mvmt Flow 41 92 22 11 120 72 12 67 11 72 102 61 Number of Lanes 0 1 0 0 1 0 0 1 0 0 1 0 Approach EB WB NB SB Opposing Approach WB EB SB NB Opposing Lanes 1 1 1 1 Conflicting Approach Left SB NB EB WB Conflicting Lanes Left 1 1 1 1 Conflicting Approach RightNB SB WB EB Conflicting Lanes Right 1 1 1 1 HCM Control Delay 9.3 9.5 9 10.1 HCM LOS A A A B Lane NBLn1 EBLn1WBLn1 SBLn1 Vol Left, % 13% 27% 5% 31% Vol Thru, % 75% 59% 59% 44% Vol Right, % 12% 14% 35% 26% Sign Control Stop Stop Stop Stop Traffic Vol by Lane 83 143 186 216 LT Vol 11 38 10 66 Through Vol 62 85 110 94 RT Vol 10 20 66 56 Lane Flow Rate 90 155 202 235 Geometry Grp 1 1 1 1 Degree of Util (X) 0.13 0.212 0.264 0.314 Departure Headway (Hd) 5.181 4.918 4.695 4.807 Convergence, Y/N Yes Yes Yes Yes Cap 686 723 758 742 Service Time 3.264 2.992 2.764 2.876 HCM Lane V/C Ratio 0.131 0.214 0.266 0.317 HCM Control Delay 9 9.3 9.5 10.1 HCM Lane LOS A A A B HCM 95th-tile Q 0.4 0.8 1.1 1.3 Queues 22: E Main St & N Rouse Ave 02/08/2022 Nest Brewery Site 01/18/2022 PM Peak Future (2024)Synchro 10 Report Page 13 Lane Group EBT WBT NBT SBL SBT Lane Group Flow (vph) 365 538 194 123 174 v/c Ratio 0.29 0.36 0.49 0.25 0.23 Control Delay 13.6 12.5 23.1 9.9 5.2 Queue Delay 0.0 0.0 0.0 0.0 0.0 Total Delay 13.6 12.5 23.1 9.9 5.2 Queue Length 50th (ft) 43 58 55 22 12 Queue Length 95th (ft) 86 112 114 49 42 Internal Link Dist (ft) 314 1464 268 295 Turn Bay Length (ft) 50 Base Capacity (vph) 1628 1890 694 521 1091 Starvation Cap Reductn 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 Reduced v/c Ratio 0.22 0.28 0.28 0.24 0.16 Intersection Summary HCM 6th Signalized Intersection Summary 22: E Main St & N Rouse Ave 02/08/2022 Nest Brewery Site 01/18/2022 PM Peak Future (2024)Synchro 10 Report Page 14 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 58 258 20 16 355 124 34 128 17 113 60 100 Future Volume (veh/h) 58 258 20 16 355 124 34 128 17 113 60 100 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1723 1709 1750 1750 1736 1709 1750 1695 1750 1750 1750 1750 Adj Flow Rate, veh/h 63 280 22 17 386 135 37 139 18 123 65 109 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 3 0 0 1 3 0 4 0 0 0 0 Cap, veh/h 227 911 74 92 949 321 125 254 30 538 213 357 Arrive On Green 0.41 0.41 0.41 0.41 0.41 0.41 0.20 0.20 0.20 0.08 0.36 0.36 Sat Flow, veh/h 313 2236 181 36 2330 787 186 1257 148 1667 587 985 Grp Volume(v), veh/h 180 0 185 291 0 247 194 0 0 123 0 174 Grp Sat Flow(s),veh/h/ln 1208 0 1523 1715 0 1438 1590 0 0 1667 0 1573 Q Serve(g_s), s 0.4 0.0 4.0 0.0 0.0 6.0 1.6 0.0 0.0 2.7 0.0 3.9 Cycle Q Clear(g_c), s 6.4 0.0 4.0 5.9 0.0 6.0 5.3 0.0 0.0 2.7 0.0 3.9 Prop In Lane 0.35 0.12 0.06 0.55 0.19 0.09 1.00 0.63 Lane Grp Cap(c), veh/h 591 0 620 776 0 586 409 0 0 538 0 570 V/C Ratio(X) 0.30 0.00 0.30 0.38 0.00 0.42 0.47 0.00 0.00 0.23 0.00 0.31 Avail Cap(c_a), veh/h 868 0 949 1139 0 897 761 0 0 679 0 1060 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 0.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 9.7 0.0 9.8 10.4 0.0 10.4 17.7 0.0 0.0 12.2 0.0 11.2 Incr Delay (d2), s/veh 0.3 0.0 0.3 0.3 0.0 0.5 0.9 0.0 0.0 0.2 0.0 0.3 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.1 0.0 1.2 2.0 0.0 1.7 1.9 0.0 0.0 0.9 0.0 1.2 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 10.0 0.0 10.1 10.7 0.0 10.9 18.5 0.0 0.0 12.4 0.0 11.5 LnGrp LOS A A B B A B B A A B A B Approach Vol, veh/h 365 538 194 297 Approach Delay, s/veh 10.0 10.8 18.5 11.9 Approach LOS B B B B Timer - Assigned Phs 2 4 6 7 8 Phs Duration (G+Y+Rc), s 25.4 23.7 25.4 7.9 15.8 Change Period (Y+Rc), s 5.4 5.9 5.4 4.0 5.9 Max Green Setting (Gmax), s 30.6 33.1 30.6 8.0 21.1 Max Q Clear Time (g_c+I1), s 8.4 5.9 8.0 4.7 7.3 Green Ext Time (p_c), s 2.4 1.1 3.6 0.1 0.9 Intersection Summary HCM 6th Ctrl Delay 11.9 HCM 6th LOS B HCM 6th AWSC 28: N. Wallace Ave & E Tamarack St 02/08/2022 Nest Brewery Site 01/18/2022 PM Peak Future (2024)Synchro 10 Report Page 15 Intersection Intersection Delay, s/veh10.6 Intersection LOS B Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 109 23 47 1 17 13 77 100 3 15 150 175 Future Vol, veh/h 109 23 47 1 17 13 77 100 3 15 150 175 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Heavy Vehicles, % 3 0 0 0 0 0 0 0 0 0 1 2 Mvmt Flow 118 25 51 1 18 14 84 109 3 16 163 190 Number of Lanes 0 1 0 0 1 0 0 1 0 0 1 0 Approach EB WB NB SB Opposing Approach WB EB SB NB Opposing Lanes 1 1 1 1 Conflicting Approach Left SB NB EB WB Conflicting Lanes Left 1 1 1 1 Conflicting Approach RightNB SB WB EB Conflicting Lanes Right 1 1 1 1 HCM Control Delay 10.4 8.6 9.9 11.2 HCM LOS B A A B Lane NBLn1 EBLn1WBLn1 SBLn1 Vol Left, % 43% 61% 3% 4% Vol Thru, % 56% 13% 55% 44% Vol Right, % 2% 26% 42% 51% Sign Control Stop Stop Stop Stop Traffic Vol by Lane 180 179 31 340 LT Vol 77 109 1 15 Through Vol 100 23 17 150 RT Vol 3 47 13 175 Lane Flow Rate 196 195 34 370 Geometry Grp 1 1 1 1 Degree of Util (X) 0.271 0.283 0.05 0.456 Departure Headway (Hd) 4.993 5.229 5.35 4.446 Convergence, Y/N Yes Yes Yes Yes Cap 712 679 673 806 Service Time 3.071 3.318 3.35 2.509 HCM Lane V/C Ratio 0.275 0.287 0.051 0.459 HCM Control Delay 9.9 10.4 8.6 11.2 HCM Lane LOS A B A B HCM 95th-tile Q 1.1 1.2 0.2 2.4 APPENDIX D TRAFFIC SIGNAL WARRANT WORKSHEETS x x x x x x x x x x x x x x x x -- -- -- -- x x x x x x x x x x x x -- -- -- -- Yes No x x x x E Peach Street & N Wallace Avenue Future Volumes (2024) TRAFFIC SIGNAL WARRANTS 8. Roadway Network N Wallace Avenue & E Tamarack Street N Wallace Avenue & E Tamarack Street E Peach Street & N Wallace Avenue Existing Volumes (2021) Signals Warranted 1. Eight-Hour Vehicular Volume 2. Four-Hour Vehicular Volume 3. Peak Hour 4. Pedestrian Volume 5. School Crossing 6. Coordinated Signal System 7. Crash History 9. Intersection Near a Grade Crossing Sanderson Stewart 2/8/2022 21391 Nest Brewery Development City of Bozeman/MDT 25 MPH N Wallace Avenue E Tamarack Street Analysis Year/Case: Existing (2021) Hour Begin NB SB EB WB 0:00 1 1 2 0 2 2 1:00 2 2 3 1 4 3 2:00 2 0 3 0 2 3 3:00 1 5 0 0 6 0 4:00 1 3 2 0 4 2 5:00 11 15 17 1 26 17 6:00 36 19 27 4 55 27 7:00 54 56 62 14 110 62 8:00 83 67 88 18 150 88 9:00 74 57 84 32 131 84 10:00 80 78 75 33 158 75 11:00 80 80 77 33 160 77 12:00 106 83 110 46 189 110 13:00 86 61 82 26 147 82 14:00 112 72 84 35 184 84 15:00 83 68 83 33 151 83 16:00 101 86 64 34 187 64 17:00 110 92 69 25 202 69 18:00 77 40 63 22 117 63 19:00 55 46 42 12 101 42 20:00 29 25 25 10 54 25 21:00 24 22 16 10 46 16 22:00 15 8 2 13 23 13 23:00 7 1 8 0 8 8 TOTAL 1230 987 1088 402 2217 1099 Condition A - Minimum Vehicular Volume (100% Columns): No (0 hrs) Condition B - Interruption of Continuous Traffic (100% Columns): No (0 hrs) Combination of Conditions A & B (80% Columns): No (0 hrs) No (0 hrs) Warrant 1 Satisfied?No Warrant 1: Eight-Hour Vehicular Volume General Information Agency/Company: Date: Project Number: Project Description: Jurisdiction: Major Street Speed Limit: Major Street (Approach Lanes): Minor Street (Approach Lanes): Avg. Entering Volume Major Street Total (Both Approaches) Major Street Total > 500 and Higher Minor Street Total > 150 for 8 hours? Major Street Total > 750 and Higher Minor Street Total > 75 for 8 hours? Major Street Total > 400 and Higher Minor Street Total > 120 for 8 hours? Major Street Total > 600 and Higher Minor Street Total > 60 for 8 hours? Higher Volume Minor Approach Sanderson Stewart 2/8/2022 21391 Nest Brewery Development City of Bozeman/MDT 25 MPH N Wallace Avenue E Tamarack Street Analysis Year/Case: Design Year (2024) Hour Begin NB SB EB WB 0:00 2 3 5 0 5 5 1:00 3 5 8 1 8 8 2:00 3 0 8 0 3 8 3:00 2 13 0 0 15 0 4:00 2 8 5 0 10 5 5:00 19 40 45 1 59 45 6:00 63 51 71 4 114 71 7:00 94 150 163 15 244 163 8:00 144 179 231 19 323 231 9:00 129 153 220 34 282 220 10:00 139 209 197 35 348 197 11:00 139 214 202 35 353 202 12:00 185 222 288 49 407 288 13:00 150 163 215 27 313 215 14:00 195 193 220 37 388 220 15:00 144 182 218 35 326 218 16:00 176 230 168 36 406 168 17:00 192 246 181 26 438 181 18:00 134 107 165 23 241 165 19:00 96 123 110 13 219 110 20:00 50 67 66 11 117 66 21:00 42 59 42 11 101 42 22:00 26 21 5 14 47 14 23:00 12 3 21 0 15 21 TOTAL 2141 2641 2854 426 4782 2863 Condition A - Minimum Vehicular Volume (100% Columns): No (0 hrs) Condition B - Interruption of Continuous Traffic (100% Columns): No (0 hrs) Combination of Conditions A & B (80% Columns): No (3 hrs) No (0 hrs) Warrant 1 Satisfied?No Warrant 1: Eight-Hour Vehicular Volume General Information Agency/Company: Date: Project Number: Project Description: Jurisdiction: Major Street Speed Limit: Major Street (Approach Lanes): Minor Street (Approach Lanes): Avg. Entering Volume Major Street Total (Both Approaches) Major Street Total > 500 and Higher Minor Street Total > 150 for 8 hours? Major Street Total > 750 and Higher Minor Street Total > 75 for 8 hours? Major Street Total > 400 and Higher Minor Street Total > 120 for 8 hours? Major Street Total > 600 and Higher Minor Street Total > 60 for 8 hours? Higher Volume Minor Approach Sanderson Stewart 2/8/2022 21391 Nest Brewery Development City of Bozeman/MDT 25 MPH N Wallace Avenue E Tamarack Street Analysis Year/Case: Existing (2021) Hour Begin NB SB EB WB 0:00 1 1 2 0 2 2 1:00 2 2 3 1 4 3 2:00 2 0 3 0 2 3 3:00 1 5 0 0 6 0 4:00 1 3 2 0 4 2 5:00 11 15 17 1 26 17 6:00 36 19 27 4 55 27 7:00 54 56 62 14 110 62 8:00 83 67 88 18 150 88 9:00 74 57 84 32 131 84 10:00 80 78 75 33 158 75 11:00 80 80 77 33 160 77 12:00 106 83 110 46 189 110 13:00 86 61 82 26 147 82 14:00 112 72 84 35 184 84 15:00 83 68 83 33 151 83 16:00 101 86 64 34 187 64 17:00 110 92 69 25 202 69 18:00 77 40 63 22 117 63 19:00 55 46 42 12 101 42 20:00 29 25 25 10 54 25 21:00 24 22 16 10 46 16 22:00 15 8 2 13 23 13 23:00 7 1 8 0 8 8 TOTAL 1230 987 1088 402 2217 1099 Meets warrant criteria on graph for minimum of 4 hours (100% thresholds)?No (0 hrs) Warrant 2 Satisfied?No Warrant 2: Four-Hour Vehicular Volume General Information Agency/Company: Date: Project Number: Project Description: Higher Volume Minor Approach Jurisdiction: Major Street Speed Limit: Major Street (Approach Lanes): Minor Street (Approach Lanes): Avg. Entering Volume Major Street Total (Both Approaches) Sanderson Stewart 2/8/2022 21391 Nest Brewery Development City of Bozeman/MDT 25 MPH N Wallace Avenue E Tamarack Street Analysis Year/Case: Design Year (2024) Hour Begin NB SB EB WB 0:00 2 3 5 0 5 5 1:00 3 5 8 1 8 8 2:00 3 0 8 0 3 8 3:00 2 13 0 0 15 0 4:00 2 8 5 0 10 5 5:00 19 40 45 1 59 45 6:00 63 51 71 4 114 71 7:00 94 150 163 15 244 163 8:00 144 179 231 19 323 231 9:00 129 153 220 34 282 220 10:00 139 209 197 35 348 197 11:00 139 214 202 35 353 202 12:00 185 222 288 49 407 288 13:00 150 163 215 27 313 215 14:00 195 193 220 37 388 220 15:00 144 182 218 35 326 218 16:00 176 230 168 36 406 168 17:00 192 246 181 26 438 181 18:00 134 107 165 23 241 165 19:00 96 123 110 13 219 110 20:00 50 67 66 11 117 66 21:00 42 59 42 11 101 42 22:00 26 21 5 14 47 14 23:00 12 3 21 0 15 21 TOTAL 2141 2641 2854 426 4782 2863 Meets warrant criteria on graph for minimum of 4 hours (100% thresholds)?No (0 hrs) Warrant 2 Satisfied?No Warrant 2: Four-Hour Vehicular Volume General Information Agency/Company: Date: Project Number: Project Description: Higher Volume Minor Approach Jurisdiction: Major Street Speed Limit: Major Street (Approach Lanes): Minor Street (Approach Lanes): Avg. Entering Volume Major Street Total (Both Approaches) Sanderson Stewart 2/8/2022 21391 Nest Brewery Development City of Bozeman/MDT 25 MPH N Wallace Avenue E Tamarack Street Analysis Year/Case: Existing (2021) Category A:Peak Period: PM Total stopped time delay for minor approach > 4 veh-hrs?No (0.19) High minor approach volume > 100 for peak hour?No (90) Total entering volume > 800 for peak hour?No (318) Category A warrant satisfied?No Category B: Meets warrant criteria on graph for minimum of one hour (100% thresholds)?No Warrant 3 Satisfied?No Total Volume of Major Approaches (vehs) 218 High Minor Approach Volume (vehs) 71 Total Entering Volume (vehs) 318 Total Entering Volume (vehs) 258 PM Peak Hour 4:30-5:30 PM High Minor Total Stopped Time Delay (hrs) 0.16 8:15-9:15 AM High Minor Total Stopped Time Delay (hrs) 0.19 Total Volume of Major Approaches (vehs) 143 High Minor Approach Volume (vehs) 90 Jurisdiction: Major Street Speed Limit: Major Street (Approach Lanes): Minor Street (Approach Lanes): AM Peak Hour Warrant 3: Peak Hour General Information Agency/Company: Date: Project Number: Project Description: Sanderson Stewart 2/8/2022 21391 Nest Brewery Development City of Bozeman/MDT 25 MPH N Wallace Avenue E Tamarack Street Analysis Year/Case: Design Year (2024) Category A:Peak Period: PM Total stopped time delay for minor approach > 4 veh-hrs?No (0.52) High minor approach volume > 100 for peak hour?Yes (179) Total entering volume > 800 for peak hour?No (730) Category A warrant satisfied?No Category B: Meets warrant criteria on graph for minimum of one hour (100% thresholds)?No Warrant 3 Satisfied?No 730 179 520 0.52 4:30 - 5:30 PM 535 Total Volume of Major Approaches (vehs) High Minor Approach Volume (vehs) Total Entering Volume (vehs) Total Entering Volume (vehs) PM Peak Hour High Minor Total Stopped Time Delay (hrs) 8:15 - 5:15 AM High Minor Total Stopped Time Delay (hrs) 0.70 Total Volume of Major Approaches (vehs) 266 High Minor Approach Volume (vehs) 243 Jurisdiction: Major Street Speed Limit: Major Street (Approach Lanes): Minor Street (Approach Lanes): AM Peak Hour Warrant 3: Peak Hour General Information Agency/Company: Date: Project Number: Project Description: Sanderson Stewart 2/8/2022 21391 Nest Brewery Development City of Bozeman/MDT 25 MPH N Wallace Avenue E Tamarack Street Analysis Year/Case: Design Year (2024) This warrant is intended for application where the traffic volume on a major street is so heavy that pedestrians experience excessive delay in crossing the major street. Hour Begin 0:00 5 0 1:00 8 0 2:00 3 0 3:00 15 0 4:00 10 1 5:00 59 1 6:00 114 2 7:00 244 12 8:00 323 4 9:00 282 4 10:00 348 6 11:00 353 9 12:00 407 11 13:00 313 15 14:00 388 4 15:00 326 6 16:00 406 6 17:00 438 13 18:00 241 2 19:00 219 17 For each of any 4 hours of an average day, do the plotted points representing 20:00 117 2 representing the vehicles per hour on the major street and the corresponding 21:00 101 1 pedestrians per hour crossing the major street fall above the curve in 22:00 47 4 Figure 4C-5?No 23:00 15 0 TOTAL 4,782 120 For 1 hour of an average day, does the plotted point representing vehicles per hour on the major street and the corresponding pedestrians per hour crossing the major street fall above the curve in Figure 4C-7?No Warrant 4 Satisfied?No Warrant 4: Pedestrian Volume General Information Agency/Company: Date: Project Number: Project Description: Jurisdiction: Major Street Speed Limit: Major Street (Approach Lanes): Minor Street (Approach Lanes): Major Street Total Traffic Pedestrian Volume Crossing Major Street Sanderson Stewart 2/8/2022 21391 Nest Brewery Development City of Bozeman/MDT 25 MPH N Wallace Avenue E Tamarack Street Analysis Year/Case: Existing (2021) This warrant is intended for application where the fact that school children (elementary through high school students) cross the major street is the principle reason to consider installing a traffic signal. This warrant shall not be applied at locations where the distance to the nearest traffic control signal along the major street is less than 300 feet, unless it can be shown that the proposed traffic signal would not restrict the progressive movement of traffic. Is the number of adequate gaps in the major crossing traffic steam during the primary crossing period less than the number of minutes in that crossing period?N/A Do 20 or more students cross at this location during the highest crossing hour?N/A Warrant 5 Satisfied?N/A Are any adjacent traffic signals located so far away that they do not provide a necessary degree of platooning and/or progressive operation?No Warrant 6 Satisfied?No This warrant is intended for application where the severity and frequency of crashes are the principal reasons to consider installing a traffic control signal Have adequate trials of alternatives failed to reduce the crash frequency?N/A Have 5 or more crashes, of types susceptible to correction by a signal, occurred within a 12-month period?No Is Condition A criterion met for 80% columns of Warrant 1 met?No Is Condition B criterion met for 80% columns of Warrant 1 met?No Are observed pedestrian volumes equal to or greater than 80% of what is required for Warrant 4? No Warrant 7 Satisfied?No General Information Agency/Company: Date: Project Number: Project Description: Jurisdiction: Warrant 7: Crash Experience Major Street Speed Limit: Major Street (Approach Lanes): Minor Street (Approach Lanes): Warrant 5: School Crossing Warrant 6: Coordinated Signal System This warrant is intended for application where installation of a traffic signal would help to provide proper platooning of vehicles and therefore provide progressive movement in a coordinated signal system. Sanderson Stewart 2/8/2022 21391 Nest Brewery Development City of Bozeman/MDT 25 MPH N Wallace Avenue E Tamarack Street Analysis Year/Case: Design Year (2024) This warrant is intended for application where the fact that school children (elementary through high school students) cross the major street is the principle reason to consider installing a traffic signal. This warrant shall not be applied at locations where the distance to the nearest traffic control signal along the major street is less than 300 feet, unless it can be shown that the proposed traffic signal would not restrict the progressive movement of traffic. Is the number of adequate gaps in the major crossing traffic steam during the primary crossing period less than the number of minutes in that crossing period?N/A Do 20 or more students cross at this location during the highest crossing hour?N/A Warrant 5 Satisfied?N/A Are any adjacent traffic signals located so far away that they do not provide a necessary degree of platooning and/or progressive operation?No Warrant 6 Satisfied?No This warrant is intended for application where the severity and frequency of crashes are the principal reasons to consider installing a traffic control signal Have adequate trials of alternatives failed to reduce the crash frequency?N/A Have 5 or more crashes, of types susceptible to correction by a signal, occurred within a 12-month period?No Is Condition A criterion met for 80% columns of Warrant 1 met?No Is Condition B criterion met for 80% columns of Warrant 1 met?No Are observed pedestrian volumes equal to or greater than 80% of what is required for Warrant 4? No Warrant 7 Satisfied?No General Information Agency/Company: Date: Project Number: Project Description: Jurisdiction: Warrant 7: Crash Experience Major Street Speed Limit: Major Street (Approach Lanes): Minor Street (Approach Lanes): Warrant 5: School Crossing Warrant 6: Coordinated Signal System This warrant is intended for application where installation of a traffic signal would help to provide proper platooning of vehicles and therefore provide progressive movement in a coordinated signal system. Sanderson Stewart 2/8/2022 21391 Nest Brewery Development City of Bozeman/MDT 25 MPH N Wallace Avenue E Tamarack Street Analysis Year/Case: Existing (2021) This warrant is intended for application where installation of a traffic signal could be justified in order to encourage concentration and organization of traffic flow on a roadway network Do two or more of the intersecting routes at this location have at least one of the following characteristics: A. It is part of the street or highway system that serves as the principal roadway network for through traffic flow; or B. It includes rural or suburban highways outside, entering, or traversing a City; or C. It appears as a major route on an official plan. No Does this intersection have an existing or immediately projected total entering volume of a least 1000 vehicles during a weekday typical peak hour and have a 5-year projected traffic volume that meets one or more of Warrants 1, 2, and 3 during an average weekday?No Does this intersection have an existing or immediately projected total entering volume of at least 1000 vph for each of any 5 hours of a Saturday or Sunday?N/A Warrant 8 Satisfied?No This warrant is intended for application where none of the conditions described in the other eight traffic signal warrants are met, but the proximity to the intersection of a grade crossing on an intersection approach controlled by a STOP or YIELD sign is the principal reason to consider installing a traffic signal. Does a grade crossing exist on an approach controlled by a STOP or YIELD sign whereby the center of the track nearest to the intersection is within 140 feet of the stop or yield line? No During the highest traffic volume hour during which the rail traffic uses the crossing, does the plotted point representing vehicles per hour on the major street and the corresponding vehicles per hour on the minor-street approach that crosses the track fall above the applicable curve in Figure 4C-9 or 4C-10 (whichever is applicable) for the existing combination of approach lanes over the track and the distance D, which is the clear storage distance?N/A Warrant 9 Satisfied?N/A General Information Agency/Company: Date: Project Number: Project Description: Jurisdiction: Major Street Speed Limit: Major Street (Approach Lanes): Minor Street (Approach Lanes): Warrant 8: Roadway Network Warrant 9: Intersection Near a Grade Crossing Sanderson Stewart 2/8/2022 21391 Nest Brewery Development City of Bozeman/MDT 25 MPH N Wallace Avenue E Tamarack Street Analysis Year/Case: Design Year (2024) This warrant is intended for application where installation of a traffic signal could be justified in order to encourage concentration and organization of traffic flow on a roadway network Do two or more of the intersecting routes at this location have at least one of the following characteristics: A. It is part of the street or highway system that serves as the principal roadway network for through traffic flow; or B. It includes rural or suburban highways outside, entering, or traversing a City; or C. It appears as a major route on an official plan. No Does this intersection have an existing or immediately projected total entering volume of a least 1000 vehicles during a weekday typical peak hour and have a 5-year projected traffic volume that meets one or more of Warrants 1, 2, and 3 during an average weekday?No Does this intersection have an existing or immediately projected total entering volume of at least 1000 vph for each of any 5 hours of a Saturday or Sunday?N/A Warrant 8 Satisfied?No This warrant is intended for application where none of the conditions described in the other eight traffic signal warrants are met, but the proximity to the intersection of a grade crossing on an intersection approach controlled by a STOP or YIELD sign is the principal reason to consider installing a traffic signal. Does a grade crossing exist on an approach controlled by a STOP or YIELD sign whereby the center of the track nearest to the intersection is within 140 feet of the stop or yield line? No During the highest traffic volume hour during which the rail traffic uses the crossing, does the plotted point representing vehicles per hour on the major street and the corresponding vehicles per hour on the minor-street approach that crosses the track fall above the applicable curve in Figure 4C-9 or 4C-10 (whichever is applicable) for the existing combination of approach lanes over the track and the distance D, which is the clear storage distance?N/A Warrant 9 Satisfied?N/A Jurisdiction: Major Street Speed Limit: Major Street (Approach Lanes): Minor Street (Approach Lanes): Warrant 8: Roadway Network Warrant 9: Intersection Near a Grade Crossing General Information Agency/Company: Date: Project Number: Project Description: Sanderson Stewart 2/10/2022 21391 Nest Brewery Development City of Bozeman/MDT 25 MPH E Peach Street N Wallace Avenue Analysis Year/Case: Existing (2021) Hour Begin NB SB EB WB 0:00 4 0 8 4 12 4 1:00 0 1 3 7 10 1 2:00 1 2 1 3 4 2 3:00 1 2 2 1 3 2 4:00 1 2 4 2 6 2 5:00 12 13 18 11 29 13 6:00 24 19 30 32 62 24 7:00 50 70 91 60 151 70 8:00 64 71 105 96 201 71 9:00 64 88 100 71 171 88 10:00 71 85 93 79 172 85 11:00 66 100 90 101 191 100 12:00 80 128 123 120 243 128 13:00 75 82 94 97 191 82 14:00 59 94 86 136 222 94 15:00 58 84 85 122 207 84 16:00 59 109 105 126 231 109 17:00 62 117 110 156 266 117 18:00 50 54 78 95 173 54 19:00 37 49 51 69 120 49 20:00 28 36 35 43 78 36 21:00 17 27 17 27 44 27 22:00 12 11 9 7 16 12 23:00 5 6 9 11 20 6 TOTAL 900 1250 1347 1476 2823 1260 Condition A - Minimum Vehicular Volume (100% Columns): No (0 hrs) Condition B - Interruption of Continuous Traffic (100% Columns): No (0 hrs) Combination of Conditions A & B (80% Columns): No (0 hrs) No (0 hrs) Warrant 1 Satisfied?No Major Street Total > 500 and Higher Minor Street Total > 150 for 8 hours? Major Street Total > 750 and Higher Minor Street Total > 75 for 8 hours? Major Street Total > 400 and Higher Minor Street Total > 120 for 8 hours? Major Street Total > 600 and Higher Minor Street Total > 60 for 8 hours? Higher Volume Minor Approach Jurisdiction: Major Street Speed Limit: Major Street (Approach Lanes): Minor Street (Approach Lanes): Avg. Entering Volume Major Street Total (Both Approaches) Warrant 1: Eight-Hour Vehicular Volume General Information Agency/Company: Date: Project Number: Project Description: Sanderson Stewart 2/10/2022 21391 Nest Brewery Development City of Bozeman/MDT 25 MPH E Peach Street N Wallace Avenue Analysis Year/Case: Design Year (2024) Hour Begin NB SB EB WB 0:00 6 0 11 5 16 6 1:00 0 2 4 8 12 2 2:00 1 3 1 3 4 3 3:00 1 3 3 1 4 3 4:00 1 3 5 2 7 3 5:00 18 21 25 13 38 21 6:00 35 30 41 37 78 35 7:00 74 111 124 70 194 111 8:00 94 112 143 112 255 112 9:00 94 139 136 83 219 139 10:00 105 135 127 92 219 135 11:00 97 158 123 118 241 158 12:00 118 203 168 140 308 203 13:00 111 130 128 113 241 130 14:00 87 149 117 158 275 149 15:00 86 133 116 142 258 133 16:00 87 173 143 147 290 173 17:00 92 185 150 181 331 185 18:00 74 85 106 111 217 85 19:00 55 78 69 80 149 78 20:00 41 57 48 50 98 57 21:00 25 43 23 31 54 43 22:00 18 17 12 8 20 18 23:00 7 9 12 13 25 9 TOTAL 1327 1979 1835 1718 3553 1991 Condition A - Minimum Vehicular Volume (100% Columns): No (0 hrs) Condition B - Interruption of Continuous Traffic (100% Columns): No (0 hrs) Combination of Conditions A & B (80% Columns): No (0 hrs) No (0 hrs) Warrant 1 Satisfied?No Major Street Total > 500 and Higher Minor Street Total > 150 for 8 hours? Major Street Total > 750 and Higher Minor Street Total > 75 for 8 hours? Major Street Total > 400 and Higher Minor Street Total > 120 for 8 hours? Major Street Total > 600 and Higher Minor Street Total > 60 for 8 hours? Higher Volume Minor Approach Jurisdiction: Major Street Speed Limit: Major Street (Approach Lanes): Minor Street (Approach Lanes): Avg. Entering Volume Major Street Total (Both Approaches) Warrant 1: Eight-Hour Vehicular Volume General Information Agency/Company: Date: Project Number: Project Description: Sanderson Stewart 2/10/2022 21391 Nest Brewery Development City of Bozeman/MDT 25 MPH E Peach Street N Wallace Avenue Analysis Year/Case: Existing (2021) Hour Begin NB SB EB WB 0:00 4 0 8 4 12 4 1:00 0 1 3 7 10 1 2:00 1 2 1 3 4 2 3:00 1 2 2 1 3 2 4:00 1 2 4 2 6 2 5:00 12 13 18 11 29 13 6:00 24 19 30 32 62 24 7:00 50 70 91 60 151 70 8:00 64 71 105 96 201 71 9:00 64 88 100 71 171 88 10:00 71 85 93 79 172 85 11:00 66 100 90 101 191 100 12:00 80 128 123 120 243 128 13:00 75 82 94 97 191 82 14:00 59 94 86 136 222 94 15:00 58 84 85 122 207 84 16:00 59 109 105 126 231 109 17:00 62 117 110 156 266 117 18:00 50 54 78 95 173 54 19:00 37 49 51 69 120 49 20:00 28 36 35 43 78 36 21:00 17 27 17 27 44 27 22:00 12 11 9 7 16 12 23:00 5 6 9 11 20 6 TOTAL 900 1250 1347 1476 2823 1260 Meets warrant criteria on graph for minimum of 4 hours (100% thresholds)?No (0 hrs) Warrant 2 Satisfied?No Higher Volume Minor Approach Jurisdiction: Major Street Speed Limit: Major Street (Approach Lanes): Minor Street (Approach Lanes): Avg. Entering Volume Major Street Total (Both Approaches) Warrant 2: Four-Hour Vehicular Volume General Information Agency/Company: Date: Project Number: Project Description: Sanderson Stewart 2/10/2022 21391 Nest Brewery Development City of Bozeman/MDT 25 MPH E Peach Street N Wallace Avenue Analysis Year/Case: Design Year (2024) Hour Begin NB SB EB WB 0:00 6 0 11 5 16 6 1:00 0 2 4 8 12 2 2:00 1 3 1 3 4 3 3:00 1 3 3 1 4 3 4:00 1 3 5 2 7 3 5:00 18 21 25 13 38 21 6:00 35 30 41 37 78 35 7:00 74 111 124 70 194 111 8:00 94 112 143 112 255 112 9:00 94 139 136 83 219 139 10:00 105 135 127 92 219 135 11:00 97 158 123 118 241 158 12:00 118 203 168 140 308 203 13:00 111 130 128 113 241 130 14:00 87 149 117 158 275 149 15:00 86 133 116 142 258 133 16:00 87 173 143 147 290 173 17:00 92 185 150 181 331 185 18:00 74 85 106 111 217 85 19:00 55 78 69 80 149 78 20:00 41 57 48 50 98 57 21:00 25 43 23 31 54 43 22:00 18 17 12 8 20 18 23:00 7 9 12 13 25 9 TOTAL 1327 1979 1835 1718 3553 1991 Meets warrant criteria on graph for minimum of 4 hours (100% thresholds)?No (0 hrs) Warrant 2 Satisfied?No Higher Volume Minor Approach Jurisdiction: Major Street Speed Limit: Major Street (Approach Lanes): Minor Street (Approach Lanes): Avg. Entering Volume Major Street Total (Both Approaches) Warrant 2: Four-Hour Vehicular Volume General Information Agency/Company: Date: Project Number: Project Description: Sanderson Stewart 2/10/2022 21391 Nest Brewery Development City of Bozeman/MDT 25 MPH E Peach Street N Wallace Avenue Analysis Year/Case: Existing (2021) Category A:Peak Period: PM Total stopped time delay for minor approach > 4 veh-hrs?No (0.30) High minor approach volume > 100 for peak hour?Yes (125) Total entering volume > 800 for peak hour?No (451) Category A warrant satisfied?No Category B: Meets warrant criteria on graph for minimum of one hour (100% thresholds)?No Warrant 3 Satisfied?No Warrant 3: Peak Hour General Information Agency/Company: Date: Project Number: Project Description: Jurisdiction: Major Street Speed Limit: Major Street (Approach Lanes): Minor Street (Approach Lanes): AM Peak Hour 8:15-9:15 AM High Minor Total Stopped Time Delay (hrs) 0.17 Total Volume of Major Approaches (vehs) 196 High Minor Approach Volume (vehs) 74 Total Entering Volume (vehs) 341 PM Peak Hour 4:30-5:30 PM High Minor Total Stopped Time Delay (hrs) 0.30 Total Volume of Major Approaches (vehs) 271 High Minor Approach Volume (vehs) 125 Total Entering Volume (vehs) 451 Sanderson Stewart 2/10/2022 21391 Nest Brewery Development City of Bozeman/MDT 25 MPH E Peach Street N Wallace Avenue Analysis Year/Case: Design Year (2024) Category A:Peak Period: PM Total stopped time delay for minor approach > 4 veh-hrs?No (0.61) High minor approach volume > 100 for peak hour?Yes (216) Total entering volume > 800 for peak hour?No (628) Category A warrant satisfied?No Category B: Meets warrant criteria on graph for minimum of one hour (100% thresholds)?No Warrant 3 Satisfied?No Warrant 3: Peak Hour General Information Agency/Company: Date: Project Number: Project Description: Jurisdiction: Major Street Speed Limit: Major Street (Approach Lanes): Minor Street (Approach Lanes): AM Peak Hour 8:15 - 5:15 AM High Minor Total Stopped Time Delay (hrs) 0.25 Total Volume of Major Approaches (vehs) 256 High Minor Approach Volume (vehs) 103 Total Volume of Major Approaches (vehs) High Minor Approach Volume (vehs) Total Entering Volume (vehs) Total Entering Volume (vehs) PM Peak Hour High Minor Total Stopped Time Delay (hrs) 628 216 329 0.61 4:30 - 5:30 PM 458 Sanderson Stewart 2/10/2022 21391 Nest Brewery Development City of Bozeman/MDT 25 MPH E Peach Street N Wallace Avenue Analysis Year/Case: Design Year (2024) This warrant is intended for application where the traffic volume on a major street is so heavy that pedestrians experience excessive delay in crossing the major street. Hour Begin 0:00 16 0 1:00 12 0 2:00 4 0 3:00 4 0 4:00 7 1 5:00 38 0 6:00 78 0 7:00 194 37 8:00 255 61 9:00 219 56 10:00 219 55 11:00 241 56 12:00 308 112 13:00 241 73 14:00 275 34 15:00 258 19 16:00 290 10 17:00 331 16 18:00 217 36 19:00 149 21 For each of any 4 hours of an average day, do the plotted points representing 20:00 98 10 representing the vehicles per hour on the major street and the corresponding 21:00 54 2 pedestrians per hour crossing the major street fall above the curve in 22:00 20 2 Figure 4C-5?No 23:00 25 0 TOTAL 3,553 601 For 1 hour of an average day, does the plotted point representing vehicles per hour on the major street and the corresponding pedestrians per hour crossing the major street fall above the curve in Figure 4C-7?No Warrant 4 Satisfied?No Jurisdiction: Major Street Speed Limit: Major Street (Approach Lanes): Minor Street (Approach Lanes): Major Street Total Traffic Pedestrian Volume Crossing Major Street Warrant 4: Pedestrian Volume General Information Agency/Company: Date: Project Number: Project Description: Sanderson Stewart 2/10/2022 21391 Nest Brewery Development City of Bozeman/MDT 25 MPH E Peach Street N Wallace Avenue Analysis Year/Case: Existing (2021) This warrant is intended for application where the fact that school children (elementary through high school students) cross the major street is the principle reason to consider installing a traffic signal. This warrant shall not be applied at locations where the distance to the nearest traffic control signal along the major street is less than 300 feet, unless it can be shown that the proposed traffic signal would not restrict the progressive movement of traffic. Is the number of adequate gaps in the major crossing traffic steam during the primary crossing period less than the number of minutes in that crossing period?N/A Do 20 or more students cross at this location during the highest crossing hour?N/A Warrant 5 Satisfied?N/A Are any adjacent traffic signals located so far away that they do not provide a necessary degree of platooning and/or progressive operation?No Warrant 6 Satisfied?No This warrant is intended for application where the severity and frequency of crashes are the principal reasons to consider installing a traffic control signal Have adequate trials of alternatives failed to reduce the crash frequency?N/A Have 5 or more crashes, of types susceptible to correction by a signal, occurred within a 12-month period?No Is Condition A criterion met for 80% columns of Warrant 1 met?No Is Condition B criterion met for 80% columns of Warrant 1 met?No Are observed pedestrian volumes equal to or greater than 80% of what is required for Warrant 4? No Warrant 7 Satisfied?No Jurisdiction: Warrant 7: Crash Experience Major Street Speed Limit: Major Street (Approach Lanes): Minor Street (Approach Lanes): Warrant 5: School Crossing Warrant 6: Coordinated Signal System This warrant is intended for application where installation of a traffic signal would help to provide proper platooning of vehicles and therefore provide progressive movement in a coordinated signal system. General Information Agency/Company: Date: Project Number: Project Description: Sanderson Stewart 2/10/2022 21391 Nest Brewery Development City of Bozeman/MDT 25 MPH E Peach Street N Wallace Avenue Analysis Year/Case: Design Year (2024) This warrant is intended for application where the fact that school children (elementary through high school students) cross the major street is the principle reason to consider installing a traffic signal. This warrant shall not be applied at locations where the distance to the nearest traffic control signal along the major street is less than 300 feet, unless it can be shown that the proposed traffic signal would not restrict the progressive movement of traffic. Is the number of adequate gaps in the major crossing traffic steam during the primary crossing period less than the number of minutes in that crossing period?N/A Do 20 or more students cross at this location during the highest crossing hour?N/A Warrant 5 Satisfied?N/A Are any adjacent traffic signals located so far away that they do not provide a necessary degree of platooning and/or progressive operation?No Warrant 6 Satisfied?No This warrant is intended for application where the severity and frequency of crashes are the principal reasons to consider installing a traffic control signal Have adequate trials of alternatives failed to reduce the crash frequency?N/A Have 5 or more crashes, of types susceptible to correction by a signal, occurred within a 12-month period?No Is Condition A criterion met for 80% columns of Warrant 1 met?No Is Condition B criterion met for 80% columns of Warrant 1 met?No Are observed pedestrian volumes equal to or greater than 80% of what is required for Warrant 4? No Warrant 7 Satisfied?No Jurisdiction: Warrant 7: Crash Experience Major Street Speed Limit: Major Street (Approach Lanes): Minor Street (Approach Lanes): Warrant 5: School Crossing Warrant 6: Coordinated Signal System This warrant is intended for application where installation of a traffic signal would help to provide proper platooning of vehicles and therefore provide progressive movement in a coordinated signal system. General Information Agency/Company: Date: Project Number: Project Description: Sanderson Stewart 2/10/2022 21391 Nest Brewery Development City of Bozeman/MDT 25 MPH E Peach Street N Wallace Avenue Analysis Year/Case: Existing (2021) This warrant is intended for application where installation of a traffic signal could be justified in order to encourage concentration and organization of traffic flow on a roadway network Do two or more of the intersecting routes at this location have at least one of the following characteristics: A. It is part of the street or highway system that serves as the principal roadway network for through traffic flow; or B. It includes rural or suburban highways outside, entering, or traversing a City; or C. It appears as a major route on an official plan. No Does this intersection have an existing or immediately projected total entering volume of a least 1000 vehicles during a weekday typical peak hour and have a 5-year projected traffic volume that meets one or more of Warrants 1, 2, and 3 during an average weekday?No Does this intersection have an existing or immediately projected total entering volume of at least 1000 vph for each of any 5 hours of a Saturday or Sunday?N/A Warrant 8 Satisfied?No This warrant is intended for application where none of the conditions described in the other eight traffic signal warrants are met, but the proximity to the intersection of a grade crossing on an intersection approach controlled by a STOP or YIELD sign is the principal reason to consider installing a traffic signal. Does a grade crossing exist on an approach controlled by a STOP or YIELD sign whereby the center of the track nearest to the intersection is within 140 feet of the stop or yield line? No During the highest traffic volume hour during which the rail traffic uses the crossing, does the plotted point representing vehicles per hour on the major street and the corresponding vehicles per hour on the minor-street approach that crosses the track fall above the applicable curve in Figure 4C-9 or 4C-10 (whichever is applicable) for the existing combination of approach lanes over the track and the distance D, which is the clear storage distance?N/A Warrant 9 Satisfied?N/A Jurisdiction: Major Street Speed Limit: Major Street (Approach Lanes): Minor Street (Approach Lanes): Warrant 8: Roadway Network Warrant 9: Intersection Near a Grade Crossing General Information Agency/Company: Date: Project Number: Project Description: Sanderson Stewart 2/10/2022 21391 Nest Brewery Development City of Bozeman/MDT 25 MPH E Peach Street N Wallace Avenue Analysis Year/Case: Design Year (2024) This warrant is intended for application where installation of a traffic signal could be justified in order to encourage concentration and organization of traffic flow on a roadway network Do two or more of the intersecting routes at this location have at least one of the following characteristics: A. It is part of the street or highway system that serves as the principal roadway network for through traffic flow; or B. It includes rural or suburban highways outside, entering, or traversing a City; or C. It appears as a major route on an official plan. No Does this intersection have an existing or immediately projected total entering volume of a least 1000 vehicles during a weekday typical peak hour and have a 5-year projected traffic volume that meets one or more of Warrants 1, 2, and 3 during an average weekday?No Does this intersection have an existing or immediately projected total entering volume of at least 1000 vph for each of any 5 hours of a Saturday or Sunday?N/A Warrant 8 Satisfied?No This warrant is intended for application where none of the conditions described in the other eight traffic signal warrants are met, but the proximity to the intersection of a grade crossing on an intersection approach controlled by a STOP or YIELD sign is the principal reason to consider installing a traffic signal. Does a grade crossing exist on an approach controlled by a STOP or YIELD sign whereby the center of the track nearest to the intersection is within 140 feet of the stop or yield line? No During the highest traffic volume hour during which the rail traffic uses the crossing, does the plotted point representing vehicles per hour on the major street and the corresponding vehicles per hour on the minor-street approach that crosses the track fall above the applicable curve in Figure 4C-9 or 4C-10 (whichever is applicable) for the existing combination of approach lanes over the track and the distance D, which is the clear storage distance?N/A Warrant 9 Satisfied?N/A Major Street Speed Limit: Major Street (Approach Lanes): Minor Street (Approach Lanes): Warrant 8: Roadway Network Warrant 9: Intersection Near a Grade Crossing General Information Agency/Company: Date: Project Number: Project Description: Jurisdiction: APPENDIX E MULTI-MODAL ANALYSIS GRAPHICS 23 BIKEWAY SELECTION GUIDE |4. BIKEWAY SELECTION Figure 9: 20 25 30 35 40 45 50 55 10k 9k 8k 7k 6k 5k 4k 3k 2k 1k 0 3 See page 32 for a discussion of alternatives if the preferred bikeway type is not feasible. Notes