Loading...
HomeMy WebLinkAbout024 A6.1.1 INTERIOR ELEVATIONSCORRIDOR 130 DAY ROOM / DINING 129 STEEL COLUMN ENCLOSURE 104.0 103.0 102.1 E NOTE: ALL ELECTRICAL OUTLETS IN THIS AREA TO BE PROTECTED, SEE ELECTRICAL DRAWINGS CG-2 CG-2 PT-3PT-2 4' - 5 3/4" PT-4PT-2 WCVG-1 WCVG-1 WCVG-1PT-4PT-4 10-01 10-01 10-01 A6.4.1 9CL5' - 8"E 114.0 113.0 112.0 111.0 109.0 CORRIDOR 130 DAY ROOM / DINING 129 WALL ANGLED NOTE: ALL ELECTRICAL OUTLETS IN THIS AREA TO BE PROTECTED, SEE ELECTRICAL DRAWINGS EE CG-2 CG-2 PT-4 WALL ANGLED 4' - 6"3' - 8 1/2"CL ANTI LIGATURE SURFACE MOUNTED PROVIDE BLOCKING 3' - 6"WDAL-1 ART-4 PT-4 EQEQA5.2.1 13 PT-2 PT-2 10-01 10-01 10-01 10-01 10-01 MON-01 130.0 NOTE: ALL ELECTRICAL OUTLETS IN THIS AREA TO BE PROTECTED, SEE ELECTRICAL DRAWINGS PT-4 WCVG-1 WCVG-1 PT-3 10-01 105.0106.0107.0 E NOTE: ALL ELECTRICAL OUTLETS IN THIS AREA TO BE PROTECTED, SEE ELECTRICAL DRAWINGS CG-2 PT-4 PT-2 PT-2 10-0110-01 130.0 CG-3 PT-2 FRP-14' - 0"TYP UNO 3" WP-1 10-01 115.0116.0 CG-4 PT-2 FRP-14' - 0"8" WP-1 TYP.3' - 2"10-01 118.0 117A.0 117.0 PT-2 WP-1 FRP-14' - 0"10-01 10-01 10-01 128A.0 125.0 132.0 CG-3 TYP PT-2 PT-2 10-0110-0110-01 121.0 120.0 131.0 CG-3 TYP PT-2PT-7 PT-7 PT-2 PT-2 10-01 10-01 10-01 124.0 122.0 E PT-2 123.0 10-01 10-01 10-01 119.0 E CG-3 TYPEQ. F EQ. F 41 B2052 42 13 PT-7 CAB-2 CNTR-1 PT-2 10-01 101.0 EXISTING ENTRANCE EXISTING EXTERIOR STOREFRONT E PT-2PT-2 PT-2 132.0 E CG-1 PT-2 CG-1 PT-2 10-01 WCVG-1 WCVG-2 128.1 E 2' - 0"4" 4" ALIGN CG-1 CG-1 A9.3.2 10 PROVIDE BLOCKING 10-01 10-02 MON-01 102.0 PT-2 10-01 PT-2 1' - 0 1/4"4' - 0"TA-51 FRP-2 PT-2PT-2CG-3 FRP-14' - 0"WP-1 10-01 issue date project # phasesheet projectownerrevision dateaddress PERMIT SET8/29/2022 5:32:44 PMA6.1.1 08/29/2022INTERIOR ELEVATIONS22006.00 PERMIT SETSPANISH PEAKSCONNECTIONS HEALTH SOLUTIONS120 19TH AVE. SUITE HBOZEMAN, MONTANA 597181/4" = 1'-0"4 130 CORRIDOR / 129 DAY ROOM / DINING - WEST 1/4" = 1'-0"2 130 CORRIDOR / 129 DAY ROOM / DINING - EAST 1/4" = 1'-0"1 129 DAY ROOM / DINING - NORTH 1/4" = 1'-0"3 129 DAY ROOM - SOUTH 1/4" = 1'-0"7 131 CORRIDOR - SOUTH 1/4" = 1'-0"6 131 CORRIDOR - EAST 1/4" = 1'-0"5 131 CORRIDOR - NORTH 1/4" = 1'-0"11 132 CORRIDOR - SOUTH 1/4" = 1'-0"13 132 CORRIDOR - EAST 1/4" = 1'-0"14 132 CORRIDOR - WEST 1/4" = 1'-0"12 132 CORRIDOR - NORTH 1/4" = 1'-0"18 101 WAITING - WEST 1/4" = 1'-0"15 101 WAITING - NORTH 1/4" = 1'-0"16 101 WAITING - EAST 1/4" = 1'-0"17 101 WAITING - SOUTH 10-01 OFOI ADA ROOM SIGNAGE 10-02 OFOI WALL MOUNTED SIGNAGE 1/4" = 1'-0"9 120A ENV/MECH - NORTH 1/4" = 1'-0"10 EAST KEY NOTES 1/4" = 1'-0"8 131 CORRIDOR - WEST