Loading...
HomeMy WebLinkAbout021 A5.1.1 BUILDING SECTIONSLEVEL 1 100' -0" ROOF 111' -1" 5 643 7 A5.1.1 11 A5.1.1 11 MECH 120B STAFF TOILET 119 CORRIDOR 132 CLINIC STATION 128 DAY ROOM / DINING 129 PATIENT 106 A5.2.1 14 TA-34 TA-22 TA-22 MON-01 WDAL-1 LEVEL 1 100' -0" ROOF 111' -1" C.1CB A5.1.1 1 A5.1.1 1 A D WAITING 101 CLINIC STATION 128 DAY ROOM / DINING 129 TOILET 112 TOILET 112A A7.3.1 3 4' - 9"SIGN-3 issue date project # phasesheet projectownerrevision dateaddress PERMIT SET8/29/2022 5:32:30 PMA5.1.1 08/29/2022BUILDING SECTIONS22006.00 PERMIT SETSPANISH PEAKSCONNECTIONS HEALTH SOLUTIONS120 19TH AVE. SUITE HBOZEMAN, MONTANA 597181/4" = 1'-0"1 NORTH / SOUTH BUILDING SECTION 1/4" = 1'-0"11 EAST / WEST BUILDING SECTION AT ENTRY