Loading...
HomeMy WebLinkAboutPrelim Plat Page 2 SURV Y OWNERS TO E REQUESTED ABED SUBDIVISION. CONDITIONS 8 SINGLE—HOUSEHOLD LOTS WITHIN A P CONDITIONS OF APPROVAL FOR DATE OWNERS: PREPARATION: 1/6/2022RS AMENDED PLA T OF LOT 1, BLOCK 17 THE VILLAGE INVESTMENT GROUP, INC. — 50% 101 E. MAIN STREET, SUITED JOHN W. MURDOCH, TRUSTEE — 50% PARKLANDS AT VILLAGE DOWNTOWN SUBDIVISION OF JOHN W. MURDOCH REVOCABLE TRUST, DATED APRIL 13, 2011 LOCATED IN THE NW 114, SECTION 8, T. 2 S., R. 6 E. OF P.M.M., CITY OF DEED REF: DOC. NOS. 2590918, 2317662, AND 2723753 BOZEMAN, GALLATIN COUNTY, MONTANA CONDITIONS OF APPROVAL FOR AMENDED PLAT OF LOT 1, BLOCKI, THE PARKLANDS AT VILL-AGE DOWNTOWN SUBDIVISION, LOCATED IN THE NW 1/4 OF SEC. 8, T 2 S., R 6 E. OF P.M.M. CITY OF BOZEMAN, GALLATIN COUNTY, MONTANA Pursuant to ARM 24.183.1107(4): (a)Any text and/or graphic representations of requirements by the governing body for final plat approval including, but not limited to, setbacks from streams or GENERAL NOTES riparian areas, floodplain boundaries, no—build areas, building envelopes, or the use of particular parcels, are shown on the Conditions of Approval sheet; (b)The Landowner hereby certifies that the text and/or graphic shown on the Conditions of Approval sheet represents requirements by the governing body for final plot approval and that all conditions of subdivision application have been satisfied; and 1. Ownership of all open space lots, areas and trails, and responsibility of maintenance thereof and for city assessments levied on (c)The information shown is current as of the date of the certification required in (4)(b), and that changes to any land—use restrictions or encumbrances may the open space lands shall be that of the property owners' association. Maintenance responsibility must include, in addition to be made by amendments to covenants, zoning regulations, easements, or other documents as allowed by law or by local regulations. the open space and trails, all vegetative ground cover, boulevard trees and irrigation systems in the public right—of—way boulevard strips along all external perimeter development streets and areas adjacent to public parks, greenway corridors or other Pursuant to A.R.M. 24.183.1107 UNIFORM STANDARDS FOR FINAL SUBDIVISION PLATS: Section (2)(e)(xxii)(A): "Federal, state and local plans, policies, regulations, common open space areas. and/or conditions of subdivision approval that may limit the use of the property, including the location, size, and use are shown on the Conditions of Approval sheet or as stated. (B): Buyers of the property should ensure that they have obtained and reviewed all sheets of the plat and all documents recorded and filed 2. The property owners association shall be responsible for maintenance of stormwater infrastructure located within the open in conjunction with the plat and that buyers of the property are strongly encouraged to contact local planning department and become informed of any imitations on the use of the property prior to closing." Spaces. All areas within the Subdivision that are designated herein as open space including sidewalks and trails are for the use l and enjoyment by residents of the development and the general public. 3. The property owners' association must be responsible for levying annual assessments to provide for the maintenance, repair and upkeep of all open space lots, areas and trails. 4. The City of Bozeman shall be responsible to the maintenance of boulevard trees along Village Downtown Boulevard. John W.Murdoch Revocable Trust,dated Apr.13,2011 The Village Investment Group,Inc.,a Montana Corporation 5. City standard sidewalks (including a concrete sidewalk section through all private drive approaches) must be constructed on all public and private street frontages prior to occupancy of any structure on individual lots. Upon a third anniversary of the plat recordation of any phase of the subdivision, any lot owner who has not constructed the required sidewalk must, without further John W.Murdoch,Trustee By. Michael W.Delaney,President notice, construct within 30 days, the sidewalk for their lot(s), regardless of whether other improvements have been made on upon the lot. 6. All plans and specifications for public infrastructure will be stored at the City engineering office located at 20 E. Olive Street, STATE OF MONTANA Bozeman, Montana 59715. COUNTY OF GALLATIN This instrument was signed or acknowledged before me on this_day of 2022,by Michael W.Delaney as president of The Village Investment Group, Inc.,a 7. The proposed development falls within a known area of high groundwater. No crawl spaces or basements may be constructed Montana Corporation. with the future development of the site, unless a professional engineer registered in the State of Montana certifies that the lowest point of any proposed structure is located above the seasonal high groundwater level and provide supporting groundwater Notary Public for the State of MONTANA data prior to the release of building permit. In addition, sump pumps are not allowed to be connected to the sanitary sewer Residing at: system or drainage system unless capacity is designed into the drainage system to accept the pumped water. Water from Printed Name: sump pumps may not be discharged onto streets, such as into the curb and gutters where they may create a safety hazard My commission expires: for pedestrians and vehicles. STATE OF B. The orientation of buildings located on Lot 1 and Lot 8 shall match the orientation of Lots 2-7. COUNTY OF This instrument was signed or acknowledged before me on this day of 2022 by John W. Murdoch as Trustee of the John W. Murdach Revocable Trast, 9. Accessory dwelling units (ADUs) may count towards meeting the minimum density requirements for the Residential High Density dated April 13,2011. zoning district (R-4) that is applicable to the lots indicated within this proposed development, only if: 1) An ADU is constructed on each lot, Notary Public for the State of 2) Each ADU is permitted through the Building Department separately from the principal structure, and, Residing at: 3) Applicable building permits for the principal structure and ADU are applied for and approved concurrently. The City of Printed Name: Bozeman will not issue building permits for any of the principal structures on the lots unless a building permit for the ADU is My commission expires: also applied for and approved C&-7 "' _W1 Engineering and Surveying Inc. 1o91 co—rid,omre•Baa±man,vn 59718 Phan.i4nfi]587-1115•Fax[4 ]587-9768 one�ymeers.�om•iaro�onsnsmssra.�om Sheet 2 of 2 #210233