Loading...
HomeMy WebLinkAbout16--CILWR Waiver1 Luke Stein From:Griffin Nielsen <GNielsen@BOZEMAN.NET> Sent:Thursday, July 21, 2022 1:05 PM To:Luke Stein; Christopher Yeley Cc:Gary Fox; Lexi Connor Subject:RE: City of Bozeman CILWR Attachments:ATT00001.txt; ATT00002.htm [EXTERNAL EMAIL] Only open attachments or click on links from senders you trust. Hi Luke, What is the site plan application number? The development’s annual domestic demand falls within the existing water rights credit associated with the property, as such no CILWR fee is required. Please provide this email as documentation with the site plan. Thanks, City of Bozeman MT Griffin Nielsen, PE| Engineering Department D:406.582.2279 C:406.595.1598 gnielsen@bozeman.net From: Luke Stein <LStein@wgmgroup.com> Sent: Tuesday, July 19, 2022 8:42 AM To: Griffin Nielsen <GNielsen@BOZEMAN.NET>; Christopher Yeley <chris@localelementarch.com> Cc: Gary Fox <gfox@wgmgroup.com>; Lexi Connor <LConnor@wgmgroup.com> Subject: [SENDER UNVERIFIED]RE: City of Bozeman CILWR CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Hi Griffin, Attached are the irrigation demand numbers to hopefully round out the water rights analysis for this project. Please let me know if you need anything else! Luke Stein, PE Project Engineer • WGM Group From: Griffin Nielsen <GNielsen@BOZEMAN.NET> Sent: Friday, April 1, 2022 2:55 PM To: Christopher Yeley <chris@localelementarch.com> 2 Cc: Luke Stein <LStein@wgmgroup.com>; Gary Fox <gfox@wgmgroup.com>; Lexi Connor <LConnor@wgmgroup.com> Subject: RE: City of Bozeman CILWR [EXTERNAL EMAIL] Only open attachments or click on links from senders you trust. Chris and Luke, Here is a preliminary determination for the project. We’ll still need to include the project’s irrigation demand if supplied by the city’s system, but as it stands the existing credit should cover the project’s annual demand. Regards, City of Bozeman MT Griffin Nielsen, PE| Engineering Department D:406.582.2279 C:406.595.1598 gnielsen@bozeman.net From: Christopher Yeley <chris@localelementarch.com> Sent: Friday, April 1, 2022 12:01 PM To: Griffin Nielsen <GNielsen@BOZEMAN.NET> Cc: Luke Stein <LStein@wgmgroup.com>; Gary Fox <gfox@wgmgroup.com>; Lexi Connor <LConnor@wgmgroup.com> Subject: Re: City of Bozeman CILWR 3 CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Good Morning Griffin, Please see below for the associated uses and their square footages: Bozeman Pilates: Exercise Studio 2,766 SF Tenants Space 1: Business 2172 SF Residential Unit 1: 3 Bed 1,330 SF Residential Unit 2: 2 Bed 1,209 SF Please let me know if you have any questions or need any additional information. Thank You, Chris Yeley, NCARB Principal Architect LOCAL ELEMENT ARCHITECTS 23 APEX DR. STE #100 BOZEMAN, MT 59718 TEL 406.600.0408 https://www.localelementarchitects.com/  Please consider the environment before printing this email. Privileged and Confidential Information may be contained in this message or it's attachments. If you are not the addressee indicated in this message, you may not copy, foward or deliver this message to anyone. In such case, you should destroy this message, and please notify us immediately. Please advise immediately if you or your employer does not consent to internet e-mail for messages of this kind. On Fri, Apr 1, 2022 at 11:36 AM Griffin Nielsen <GNielsen@bozeman.net> wrote: Hi Luke, Welcome back, hope you enjoyed your time amongst the evergreens! There are a lot of things I miss about the PNW but the Seattle traffic is not one of them. Yea I’ve taken over most the day-to-day CILWR determinations from Brian. So a CILWR payment was made with Baxter Meadows Phase 2A, attached is the record for the payment. Based the record Lot 5 has a CILWR volume credit of 0.928 AF [(12,375 SF *22.57gal/sf) / 325,851gal/AF = 0.928AF]. 4 Let me know when you have submitted the site plan or have the project details defined (square-footage for each use and/or residential unit count) and we can work through the CILWR determination for the project. Please provide this email with the site plan application to satisfy Planning submittal requirement. Thanks, City of Bozeman MT Griffin Nielsen, PE| Engineering Department D:406.582.2279 C:406.595.1598 gnielsen@bozeman.net From: Luke Stein <LStein@wgmgroup.com> Sent: Monday, March 28, 2022 3:38 PM To: Griffin Nielsen <GNielsen@BOZEMAN.NET> Cc: Gary Fox <gfox@wgmgroup.com>; Christopher Yeley <chris@localelementarch.com>; Lexi Connor <LConnor@wgmgroup.com> Subject: [SENDER UNVERIFIED]RE: City of Bozeman CILWR CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Hi Griffin, Just bumping this to the top of the inbox. We are planning to submit this site plan soon and are hoping to have an estimate for CILWR to provide the client so they are aware of any additional costs associated with the development and can budget accordingly. Thanks! 5 Luke Stein Staff Engineer • WGM Group From: Luke Stein <LStein@wgmgroup.com> Sent: Tuesday, March 15, 2022 12:53 PM To: gnielsen@bozeman.net Cc: Gary Fox <gfox@wgmgroup.com>; Christopher Yeley <chris@localelementarch.com>; Lexi Connor <LConnor@wgmgroup.com> Subject: City of Bozeman CILWR Hi Griffin, I hope you have been well! I recently started working with WGM Group in Bozeman after spending the last year and a half with a company based out of Seattle. Excited to be working back in the valley after a brief hiatus. I hear you are leading the water rights efforts these days, congrats! I was hoping you could provide some background information on water rights for Baxter Meadows Phase 2A. We are working on a site plan application for a mixed use building located on Lot 5, Block 16 (plat attached) and am curious if any payments were made during the platting process? If not, could you please provide us with an estimate for CILWR that we can include with our site plan application? Luke Stein Staff Engineer M: 406-599-8997 O: 406-728-4611 109 East Main Street, Suite B Bozeman, Montana 59715 www.wgmgroup.com City of Bozeman emails are subject to the Right to Know provisions of Montana’s Constitution (Art. II, Sect. 9) and may be considered a “public record” pursuant to Title 2, Chpt. 6, Montana Code Annotated. As such, this email, its sender and receiver, and the contents may be available for public disclosure and will be retained pursuant to the City’s record retention policies. Emails that contain confidential information such as information related to individual privacy may be protected from disclosure under law. City of Bozeman emails are subject to the Right to Know provisions of Montana’s Constitution (Art. II, Sect. 9) and may be considered a “public record” pursuant to Title 2, Chpt. 6, Montana Code Annotated. As such, this email, its sender and receiver, and the contents may be available for public disclosure and will be retained pursuant to the City’s record 6 retention policies. Emails that contain confidential information such as information related to individual privacy may be protected from disclosure under law.