Loading...
HomeMy WebLinkAbout25 N-A3-0 - BUILDING ELEVATIONSPLAN -1ST LEVEL 100' -1" PLAN -2ND LEVEL 114' -3 5/8" ABCDEFGHIJ PLAN -3RD LEVEL 124' -5 3/8" C N-A6.1 27 53 1 56 30 39 65 11103B 203B 303B 303A 301C 203A 201C 101C203A 101B 201B 301B M1 M2 M1 M3 M2 M3 M2 M1 M1 M3 M3 M2 M3 M2 M2 M2 3 N-A7.2 M7 C N-A6.2 M2 M6 M6 M6 M6 1 N-A5.1 PLAN -1ST LEVEL 100' -1" PLAN -2ND LEVEL 114' -3 5/8" 1 2 3 4 5 6 7 8 9 10 11 12 13 14 PLAN -3RD LEVEL 124' -5 3/8" A N-A6.0 PLAN -1ST LEVEL -1.5 98' -7" PLAN -2ND LEVEL -1.5 112' -9 5/8" PLAN -3RD LEVEL -1.5 122' -11 3/8" 310A 210A 207A 307A 107A108A 208A 308A 104B 204B 304B 304A 204A 104A 103C 203C 303C 209A 309A 73 47 21 24 50 76 77 51 25 2 28 54 M1 M1 M3 M2 M3 M2 M3M3 M2 M2 M1 M1 M3 M1 M3 M1 M410 N-A7.1 10 N-A7.1 1 N-A7.2 3 N-A7.2 M7 M7 4 N-A5.1 2' - 1"1' - 7"2' - 1"1' - 4 3/4"M5 M5 M6 M5 7 N-A7.0 7 N-A7.0 1 N-A5.1 1 N-A5.1 PLAN -1ST LEVEL 100' -1" PLAN -2ND LEVEL 114' -3 5/8" 1234567891011121314 PLAN -3RD LEVEL 124' -5 3/8" A N-A6.0 PLAN -1ST LEVEL -1.5 98' -7" PLAN -2ND LEVEL -1.5 112' -9 5/8" PLAN -3RD LEVEL -1.5 122' -11 3/8" 302A 202A 102A 101A 201A 301A 305A 205A 105A 106B 206B 306C 18 46 72 10 38 64 9 37 63 68 42 33 59 29 55 M1 M1 M1 M3 M2 M2 M1 M3 M3 M2 M1 M1 M3 M3 M2 T.O. UNIT8' - 0"T.O. UNIT10' - 0"T.O. UNIT10' - 0"T.O. UNIT8' - 0"T.O. UNIT8' - 0"5' - 0"2' - 6"2' - 6"11 1/2"3' - 6"5' - 0"2' - 6"2' - 6"3' - 6"5 1/2" 2 N-A7.2 1 N-A7.2 3 N-A7.2 N-A5.1 5 M6 M6 M5 M5 M5 M7M7 M7 M1 4 N-A5.1 M1 M7 N-A7.2 5 N-A7.2 5 1 N-A5.1 1 N-A5.1 1 N-A7.2 N-A7.0 9 N-A7.0 8 A B C D E F G H I J PLAN -1ST LEVEL -1.5 98' -7" PLAN -2ND LEVEL -1.5 112' -9 5/8" PLAN -3RD LEVEL -1.5 122' -11 3/8" C N-A6.1 71 45 17 19 20 22 48 74 78 52 26 308B 208B208C 308C306A 206A 106A 206B 306B 108B M1 M1 M1 M1 M1 M3 M2 M2 M2 M3 M2 M3 4 N-A7.2 M7 M7 C N-A6.2 M2 M5 M5 M2 M2 M6 M6 M6M6 1 N-A5.1 JOB No.SHEET NUMBERPROJECT / OWNERARCHITECTLOCATI ARCHITECTS1007 E. MAIN SUITE 202 BOZEMAN MONTANA406-587-1139 FAX 587-7369COPYRIGHT LOCATI ARCHITECTS P.L.L.P.2020 ALL RIGHTS RESERVEDPROJECT MGR1930UNIVERSITY CROSSING-NORTHS 19TH AVE & KAGY BLVDBOZEMAN, MTN-A3.0ELEVATIONSSCALE: 1/8" = 1'-0" SOUTH - PARKING SCALE: 1/8" = 1'-0" WEST - WETLANDS SCALE: 1/8" = 1'-0" EAST - DRIVEWAY SCALE: 1/8" = 1'-0" NORTH - KAGY EXTERIOR MATERIAL SCHEDULE MARK TYPE MATERIAL DESCRIPTION M1 4" BRICK UTILITY M2 VERTICAL METAL SIDING GAG 22, BOX-RUB, COLOR RUST/COR-TEN M3 HORIZONTAL METAL SIDING GAG 22, RANDOM WIDTHS 4", 6", 8", 10" M4 WOOD PANEL 4' X 4' WOOD PANEL M5 STANDING SEAM ROOFING BLACK METAL M6 ROOFING SHINGLES ASPHALT - DARK GREY M7 CONCRETE SACK FINISH M8 METAL PANEL 1/2" METAL PANEL M9 GROUND CMU BLACK ISSUE#DATEINFORMAL SET15-26-21SITE PLAN SET28-10-21SP RESUBMIT404-13-211'-0"1'-0"2'-0"2'-0"2'-0"2'-0"1'-0"1'-0"1'-0"2'-0"FLOOR IS 1' ABOVE GRADE 2' PATIO WALLS 4'8'MIXED BLOCK FRONTAGE TRANSPARENCY CALCS. 20' FROM SIDEWALK IS 51% BETWEEN 4' TO 8' FROM GRADE. TOTAL TRANSPARENCY OF FACODE IS 18%