Loading...
HomeMy WebLinkAbout012--A6.2 Building ElevationsPROJECT DATUM+101' -5 3/4"SECOND FLOOR+111' -10"COURTYARD+97' -1 1/2"ALU SECOND FLOOR+109' -0 3/4"ADU FINISH FLOOR+100' -0"31' - 9 1/4"M-05M-01M-02M-02M-06M-02M-01M-03T.O. FOUNDATION+100' -0"1-202C1-202B1-203A1-206A1-204B1-105A1-105B1-103A1-103B1-102BM-03M-031A-21A1-110A1A-0111A-21BM-04M-04M-01M-04M-056" CEDAR SHIPLAP W/ WHITEWASH STAINM-01MOSO BAMBOO X-TREME RAINSCREEN SYSTEM WITH GRAY WASH OR APPROVED EQ.M-02M-03M-04M-05BREAK METAL TRIM, CAP, FLASHING TO BE FINISHED SW 7069 IRON ORE OR APPROVED EQ.ASPHALT SHINGLES -COLOR TO BE CHARCOALANDERSON E SERIES WINDOWS/DOORS TO BE MATTE BLACKM-06PAINTED CONCRETE FOUNDATION2345678910FEDCBAGH1PROJECT NO:DATE:20011-B05/12/2022All reports, drawings, specifications, computer files, field data, notes, other documents and instruments prepared by the Architect as instruments of service shall remain the property of the Architect, LocalElementArchitects, LLC. The Architect shall retain all common law, statutory and other reserved rights, including copyright thereto. The use of this drawing shall be restricted to the original site for which it was prepared and publication thereof is expressly limited to such use. Reuse, reproduction or publication by any method is prohibited without written consent from LocalElementArchitects, LLC. NOT FOR CONSTRUCTION5/12/2022 2:13:05 PM C:\Users\chris\OneDrive\Documents\21001-B-113 S.7th Townhomes_chrisTMMND.rvt119 S. 7TH TOWNHOMES119 S. 7TH AVEBOZEMAN MT, 59715A6.2BUILDINGELEVATIONSSCALE: 1/4" = 1'-0"2NORTH ELEVATIONMATERIALS LEGENDREVISIONSNO. DATE DESCRIPTION