Loading...
HomeMy WebLinkAbout026 DEM Construct Cost ComparisonCONSTRUCTION COST COMPARISON Date: April 29, 2022 Contractor: Edge Construction, LLC mikebest514@hotmail.com (406) 581-2807 Project address: 302 S. 6th Ave Bozeman, Montana Description: Cost comparison between demolishing existing residence/building a similar structure and repairing/reconstructing residence as a single family which meets adopted building codes. See documentation Structural Report. Residence further evaluated by Contractor, April 2022. 2x4 walls and rafters. 2x10 and 2x8 joists. Many joists notched. No sheathing or building wrap. Existing residence approx. 38’x 26’ footprint, 2 story, with small front porch and exterior stairs. SUMMARY: Cost of repair/rehabilitation exceeds cost of demolition/redevelopment. Additional cost is $108,110. See cost breakdown below. Cost of demolition and redevelopment: Demolition $ 15,000 New construction @ 205/SF 38’-7”x 25’-10”, 2 story, crawlspace, front porch, internal stair. 1,994 SF. $ 408,770 TOTAL, demolition/redevelopment $ 423,770 Cost of repair and rehabilitation: Prep for Structural moving-Demo chimney stack and exterior porches/stairs, shoring of compromised floors, internal and external bracing $ 10,800 Structural moving and placement on new foundation $ 42,600 Remove old foundation and concrete $ 7,000 Excavation/backfill, Foundation, Utilities $ 27,000 Partial interior demo-plaster/lathe, flooring, finishes $ 15,500 Exterior demo- roofing shingles, siding, windows $ 5,800 Structural repair- floors and all headers, replacement/sistering $ 11,800 Framing-exterior and floor sheathing, roof, partitions, stairs, dropped ceilings $ 58,000 Roofing $ 5,400 Siding, front porch, set windows, exterior trim $ 26,800 Mechanical- plumbing, electrical, HVAC $ 38,800 Insulation- 3.5” Corbond, exterior XPS, per 2018 Energy code $ 36,680 Windows/Ext doors $ 27,000 Drywall and painting $ 51,000 Interior finishes, flooring, trim, appliances, cabinetry $128,500 Disposal fees, permit fees, site job costs $ 39,200 TOTAL, repair/rehabilitation $531,880