Loading...
HomeMy WebLinkAboutSite A_C410 Erosion and Sediment Control Plan 2022-02-07R=50 .0 0 'L=78.5 1'Δ=89°58'11 " S0°00'00"E 267.01'S83°52'34"W 200.48'S0°18'43"E 196.42' S89°41'43"W 27.21' N0°00'00"E 26.91' N90°00'00"E 25.13' N76°44'45"E 70.60' S75°49'16"E 22.12' S52°55'58"W 14.64'S68°31'49 "W 57 .93 ' N90°00'00"W 28.49' N0°19'02"W 591.97' R =5 6 9.0 1 'L=4 9 .8 6 ' Δ=5°01'15 "SSSS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSWWWWWWWWWWWWWWWWWWWWWWWWWWSSSSSSSSWWWWWWWWWW SSSSSSWWWWSSSSSSSSSSSSSSSSSSWWWWWWWWWWSS WWWWWWWWWWWWWWWWWWWSSSSSSSSSSSS20 4010200 SCALE IN FEET GENERAL NOTES 1.TOTAL HOTEL PARKING: 181 SPOTS Know what's below. before you dig.Call R 11x17 HORIZONTAL SCALE: 1" = 60' GRAPHIC SCALE 0 (IN FEET) 15 301530 1 INCH = 30 FT NOTES BY SYMBOL: INSTALL TYPE D INLET PROTECTION FILTER PER DETAIL 3 ON SHEET C720 PRIOR TO THE DISTURBANCE OF ANY PORTION OF THE SITE. 3 LEGEND EXISTING ASPHALT SURFACE EXISTING CONCRETE SURFACE PROPOSED CONCRETE EROSION & SEDIMENT CONTROL NOTES: 1.EROSION AN SEDIMENT CONTROL ON THIS PROJECT SHALL BE COMPLETED IN ACCORDANCE WITH THE CITY OF BOZEMAN'S BEST MANAGEMENT PRACTICE (BMP) MANUAL FOR CONSTRUCTION SITES. VERSION 3 - SEPTEMBER 1, 2016. 2.ALL REQUIRED PERIMETER SILT AND CONSTRUCTION FENCING SHALL BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY (STOCKPILING, STRIPPING, GRADING, ETC). ALL OTHER REQUIRED EROSION CONTROL MEASURES SHALL BE INSTALLED AT THE APPROPRIATE TIME IN THE CONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTION PLANS, AND STORMWATER MANAGEMENT PLAN. 3.AT ALL TIMES DURING CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PREVENTING AND CONTROLLING ON-SITE EROSION INCLUDING KEEPING THE PROPERTY SUFFICIENTLY WATERED SO AS TO MINIMIZE WIND BLOWN SEDIMENT. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR INSTALLING AND MAINTAINING ALL EROSION CONTROL FACILITIES SHOWN HEREIN. 4.PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED WHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING VEGETATION SHALL BE LIMITED TO THE AREA(S) REQUIRED FOR IMMEDIATE CONSTRUCTION OPERATIONS, AND FOR THE SHORTEST PRACTICAL PERIOD OF TIME. 5.CONDITIONS IN THE FIELD MAY WARRANT EROSION CONTROL MEASURES IN ADDITION TO WHAT IS SHOWN ON THESE PLANS. THE CONTRACTOR SHALL IMPLEMENT WHATEVER MEASURES ARE DETERMINED NECESSARY TO CONTROL ON-SITE EROSION. 6.ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BY APPROPRIATE EROSION CONTROL METHODS. ANY SOIL STOCKPILE THAT WILL BE DORMANT FOR OVER THIRTY (30) DAYS SHALL BE SEEDED. 7.THE CONTRACTOR SHALL AT ALL TIMES TAKE WHATEVER MEASURES ARE NECESSARY TO ASSURE THE PROPER CONTAINMENT AND DISPOSAL OF POLLUTANTS ON THE SITE IN ACCORDANCE WITH ANY AND ALL APPLICABLE LOCAL, STATE, AND FEDERAL REGULATIONS. 8.THE CONTRACTOR SHALL IMMEDIATELY CLEAN UP ANY CONSTRUCTION MATERIALS INADVERTENTLY DEPOSITED ON EXISTING STREETS OR OTHER PUBLIC RIGHTS OF WAY, AND MAKE SURE STREETS ARE CLEANED AT THE END OF EACH WORKING DAY. INSTALL TRACKOUT CONTROL SYSTEM PER DETAIL 1 ON SHEET C720 OR AS RECOMMENDED BY MANUFACTURER CONSTRUCTION LIMITS STRAW WATTLE 1 INSTALL CONCRETE WASHOUT FACILITY PER DETAIL 2 ON SHEET C7202 AREA TO BE PAVED TEMPORARY JOB SITE TRAILER TEMPORARY JOB SITE DUMPSTER TEMPORARY SANITARY FACILITY 2 3 1 STRAW WATTLE © 2880 Technology Blvd. W. Bozeman, MT 59718 Phone: (406) 587-0721 Fax: (406) 922-6702 SHEET NUMBER PROJECT NUMBER DRAWING NUMBER DRAWN BY: CHK'D. BY: APPR. BY: DATE: Q.A. REVIEW DATE: BY: COPYRIGHT MORRISON-MAIERLE, INC.,2022 VERIFY SCALE! THESE PRINTS MAY BE REDUCED. LINE BELOW MEASURES ONE INCH ON ORIGINAL DRAWING. MODIFY SCALE ACCORDINGLY! REVISIONS DATEDESCRIPTIONNO.BY N:\3638\009\ACAD\Site Plans\Building-A\Everhome\Sheets\3638.009 C410 Erosion and Sediment Control Plan.dwg Plotted by celine saucier on Feb/8/2022 engineerssurveyorsplannersscientistsengineerssurveyorsplannersscientists 3638.009 5 C410 BOZEMAN MONTANA CMS JAU JAU 2/2022 EVERHOME HOTEL EROSION & SEDIMENT CONTROL PLAN SITE "A" BOZEMAN GATEWAY PUD FUTURE SITE 3 3 3 3 3 33 3 3 3