Loading...
HomeMy WebLinkAboutC2GeneralCivilAndUtilityPlan///////// / / / / / / / / / 8 S S 8 S S 8 SS 8 SS 8 S S 8 W E E E E E T T T E E E E E E E E E T T G G G G G G G G / / / / / / / / / ////// / / / / / / /// /// /// ///////// / / / / / / //////////// /// ////////////////// / / / / / / / / / ///////// / / / / / / / / / / / / / / / / / / / / / /// /// /// ///////// / / / / / / / / / / / / / / / / / / / / / /// ////// / / / /// /// /// / / / / / / / / / /// / / / / / / / / / / / / /// / / / / / / / / / /// /// /// / / / / / / / / / /////////////// / / / /////////////// 12 W 12 W / / / / / / / / / / / / / / / / / / ////// /// /// / / / / / / / / / / / / / / / / / / / / / ////// S D S D S D S D E SSWSGT11"X17": 1"= 40 ft NGRAPHIC SCALE1 inch = ft.0( IN FEET )10202020H:\1086\018\ACAD\SHEETS\C-2_CIVIL AND UTILITY PLAN_LOT 7A_recover.dwg Plot Date: 3/11/2022 9:43 AM S E R P O F S T N M O A A N G N D R S C H U L T Z G A R R E T T 4 1 8 0 3 P E A T N I G S I E O L E R E E ERIEN H E A D W A T E R S P R O J E C T N U M B E R D R A W I N G N U M B E R D R A W N B Y : D A T E : 2 0 2 2 V E R I F Y S C A L E T H E S E P R I N T S M A Y B E R E D U C E D . L I N E B E L O W M E A S U R E S O N E I N C H O N O R I G I N A L D R A W I N G . M O D I F Y S C A L E A C C O R D I N G L Y © H E A D W A T E R S E N G I N E E R I N G , I N C . R E V I S I O N D A T E : 1 9 0 N O R T H S T A R L A N E , B O Z E M A N , M T 5 9 7 1 8 H E A D W A T E R S M T . N E T 4 0 6 - 5 8 1 - 5 7 3 0 P R O J E C T L O C A T I O N M O N T A N A B O Z E M A N 0 3 / 1 0 / 2 2 0 1 / 3 1 / 2 2 G P S G E N E R A L C I V I L P L A N A N D U T I L I T Y P L A N T B D F A L L O N S T . T H E R I D G E L O T 7 A 1 0 8 6 . 0 1 8 C - 2 E X I S T I N G B U R I E D P O W E R , C O M M U N I C A T I O N S & G A S S U B J E C T P R O P E R T Y L O T 7 A 0 . 2 5 A C R E S E X I S T I N G 5 ' B O U L E V A R D S I D E W A L K 15' FRONT SETBACK EXISTINGRESIDENCE E X I S T I N G C O M M E R C I A L B U I L D I N G M O U N T A I N L I O N A S S E T S L L C L O T 9 B L O C K 3 0 . 2 2 A C R E S R I D G E C A M P U S P R O P E R T Y O W N E R S A S S O C . P R I V A T E C O M M O N A R E A # 1 - A & 2 & S H A R E D P A R K I N G A R E A 1 0 . 0 5 A C R E S E Y E T O O T H C O N D O M A S T E R L O T 8 0 . 2 6 A C R E S G A L L A T I N V A L L E Y H E A L T H & F I T N E S S G R O U P L O T 2 A 0 . 2 8 A C R E S STILLWATERCREEK DR. C O N T I N U E T O E X I T O N T O F E R G U S O N A V E . EXISTING FIRE HYDRANT E X I S T I N G C O M M E R C I A L B U I L D I N G EXISTINGRESIDENCE R A V A L L I S T . 60 ' R O W 1 5 ' F R O N T S E T B A C K 5 ' S I D E S E T B A C K 5' S I D E S E T B A C K EXISTING MANHOLE E X I S T I N G M A N H O L E EXISTIN G RESIDEN C E CT CONDOLOT 2BMINOR SUB 365ACOMBS CAPITAL LCLOT 5MINOR SUB 295 E X I S T I N G P A R K I N G L O T E X I S T I N G P A R K I N G L O T EXISTING GAS, POWE R & COMMUNICATION S E X I S T I N G 1 2 " C L A S S 5 1 D . I . P . W A T E R M A I N E X I S T I N G 8 " S D R 3 5 S E W E R M A I N EXISTING 5' SIDEWALK P R O P E R T Y B O U N D A R Y B U I L D I N G 1 I N S T A L L 1 5 L F 1 " W A T E R S E R V I C E W / 1 . 0 " M E T E R E X I S T I N G T R A S H E N C L O S U R E S P E R P U D D R A W I N G S SEWERCLEANOUT B U I L D I N G F O O T P R I N T , T Y P P R O P O S E D A C U N I T 10 5 . 0 0 ' E X I S T I N G R E T E N T I O N P O N D 105.06' 1 1 1 . 1 5 ' CONSTRUCTION NOTES:1. CONSTRUCTION TRAFFIC WILL ENTER THE SITE FROM FALLON ST.PASSENGER VEHICLE AND PICKUP TRUCKS MAY TURN AROUND IN THEPARKING LOT AND LEAVE ON FALLON ST. LARGER TRUCKS MUSTCONTINUE NORTHEAST, THEN EAST THROUGH THE RIDGE SUBDIVISIONAND EXIT ONTO FERGUSON AVE.2. ALL INFRASTRUCTURE SHALL BE INSTALLED IN ACCORDANCE WITH THELATEST EDITION OF THE MONTANA PUBLIC WORKS.3. THE CONTRACTOR SHALL CONTACT ONE CALL @ 1-800-424-5555 FORONSITE UTILITY LOCATION. ALL UTILITIES SHALL BE MARKED BEFOREDIGGING. UTILITIES SHOWN ARE FOR PLANNING PURPOSES ONLY.4. THE CONTRACTOR SHALL NOTIFY THE BOZEMAN WATER & SEWER DEPARTMENT A MINIMUM OF 24 HOURS PRIOR TO BEGINNING ANY WORK.EXISTING LIGHTFALLON ST.(60' R.O.W.)EXISTING RAMPSFOR FUTURESIDEWALKCONNECTIONLEGENDUNDERGROUND ELECTRIC SEWER PIPEWATER SERVICE LINEEASEMENT OR SETBACK AS LABELEDUNDERGROUND GAS LINEUNDERGROUND COMMUNICATION LINE EXISTING CONTOURS 0.5' INTERVAL4" IRRIGATION CONDUITPROPOSED SIDEWALK EXISTING CURB AND SIDEWALK I N S T A L L 1 5 L F 4 " S E W E R S E R V I C E , S = 2 . 0 % . EXISTING 5' BOULEVARD SIDEWALK S N O W S T O R A G E A R E A P E R P U D VISIONTRIANGLE V I S I O N T R I A N G L E 107.64' P R O P O S E D G A S , P O W E R , A N D C O M M U N I C A T I O N S 37' TBC TO TBC 7 . 0 ' 7' 7 . 0 ' E X I S T I N G L I G H T E X I S T I N G S T O R M I N L E T E X I S T I N G S T O R M I N L E T E X I S T I N G S T O R M I N L E T EXISTING 12' PUE PERPLAT J-465-ARAVALLI ST.60' ROW E X I S T I N G L I G H T 3 0 C Y D R O L L O F F D U M P S T E R TOPSOIL STOCKPILE AREA M A T E R I A L S T A G I N G A R E A FENCING TO CONTAINDEBRIS C O N S T R U C T I O N R E S T R O O M EXISTING 10' PUE PERMINOR SUB 365A M A K E M A T E R I A L D R O P O F F S H E R E EXISTINGPOWERTRANSFORMER EXISTING POWER BOXEXISTING COMM BOX EXISTING PHONE BOXEXISTING POWER PANEL 7 . 0 ' 1 1 REVISIONSWIDENED SIDEWALK TO 7' TOTAL. CONTRACTOR TO R E M O V E A N D R E P L A C E CURB AND GUTTER TO MATCH.VISION TRIANGLE ADJUSTED TO MATCH SEC 38.400.1 0 0 D . D R I V E W A Y S A N D ALLEYS. ONE ADDITIONAL ON-STREET PARKING SPA C E I S S H O W N . 2 2