Loading...
HomeMy WebLinkAbout010_L201-Landscape DetailsFlooring PlaceSTAKE WITH 2" WOOD TREESTAKES AND RUBBER STYLE TIES.PROVIDE SLACK IN LINE TIES.STAKES SHALL NOT PENETRATEROOT BALL.MULCH AS SPECIFIED. PULLMULCH AWAY FROM TRUNK.TREE IS TO BE PLANTED SLIGHTLY HIGHERTHAN GRADE WITH THE TREE COLLAREXPOSED1. CREATE A SAUCER AROUND TREES TO RETAIN IRRIGATION WATER.NOTES:USE PROPER PRUNINGTECHNIQUES TO REMOVE DEADOR BROKEN LIMBS, ANDCOMPETING APICAL LEADERSEXCAVATE HOLE:WIDTH = 3 x DIA. OF ROOTBALLDEPTH = HEIGHT OF ROOTBALL + 6" MIN.1L201PLANTING DETAIL TREE NTS FINISH GRADE4'EDGINGAMENDED TOPSOIL BACKFILL.OVEREXCAVATE TREE WELL & PROVIDE 6"MIN. COMPACTED PLANTING SOILUNDER TREE BALL AS SHOWN1. SHRUBS TO BE PLANTED TO BEAR THE SAME R E L A T I O N T O F I N I S H G R A D E A S ORIGINALLY GROWN IN THE NURSERY.NOTES: E X C A V A T E D H O L E 2 X D I A M E T E R O F R O O T B A L L B A C K F I L L W I T H A M E N D E D T O P S O I L R E M O V E R O O T C O N T A I N M E N T M A T E R I A L S I F P R E S E N T M U L C H - P U L L M U L C H A W A Y F R O M S T E M . M U L C H 3 " M I N . C R E A T E S A U C E R A R O U N D S H R U B P R U N E S H R U B T O R E M O V E D E A D O R D A M A G E D B R A N C H E S . 2L201SHRUB PLANTING D E T A I L N T S 6" MIN. P E R E N N I A L S A S S H O W N O N P L A N M U L C H W / 1 " S O I L P E P O R C O M P O S T 1 0 " M I N . D E P T H O F P L A N T I N G S O I L M I X U N D I S T U R B E D S O I L N O T E : 1 ) S P R E A D P L A N T I N G S O I L T O 1 0 " D E P T H , A D D I N G A M E N D M E N T S I N R E S P O N S E T O S O I L A N A L Y S I S T O A C H I E V E S P E C I F I E D S O I L N U T R I E N T S , T E X T U R E A N D O R G A N I C M A T T E R . 3 L 2 0 1 P E R E N N I A L / O R N A M E N T A L G R A S S P L A N T I N G N T S 4 L 2 0 1 L A N D S C A P E E D G I N G N T S F I N I S H G R A D E . S T E E L E D G I N G A S S H O W N . P R O - E D G E S T E E L / A L U M I N U M M U L C H A S N O T E D . W E E D B A R R I E R F A B R I C . L A P 6 " A T J O I N T S . 8 " S T A P L E S T O A N C H O R W E E D B A R R I E R , T R I A N G U L A R S P A C I N G 3 ' O . C . A N D 1 ' O . C . L I N E A R S P A C I N G A T J O I N T S . 3 " M I N . W H E R E S T E E L E D G I N G I N T E R S E C T S W I T H O T H E R S T E E L E D G I N G , S E C U R E ( B O L T O R W E L D ) T H E T W O P I E C E S O F E D G I N G T O G E T H E R . 5L201BOULDER PLACEMENT NTS BURY BOULDERS 14 TO 13 OF THEIRHEIGHT BELOW FINISHED GRADECOMPACTED SUBGRADEPLANT BED NOTES:1)BOULDERS ARE TO BE SET IN PLACE PRIOR TO PLANTING OR IRRIGATION INSTALLATION.2)BOULDER TO BE MONTANA MOSS ROCK3)BOULDERS TO BE IN NATURAL GROUPINGS WITH VARYING HEIGHTS AND SIZES.2" THICK CONCRETE PAVER S L O P E N O T T O E X C E E D 4 : 1 N A T I V E T R E E A N D S H R U B P L A N T I N G S O N U P P E R E D G E S O F G R A D E R I P A R I A N S E E D M I X I N B O T T O M A N D U P S I D E S O F R E T E N T I O N P O N D S E E P L A N T L E G E N D N A T I V E S E E D M I X O N U P P E R E D G E S O F G R A D E S E E P L A N T L E G E N D 6L201SECTIONRETENTION POND N T S L A N D S C A P E B O U L D E R S S E T I N T O T O P O F G R A D E 1 8 ' - 4 7 8 " K E E P O U T T R E E P R O T E C T I O N A R E A 7 L 2 0 1 E X I S T I N G T R E E P R O T E C T I O N D E T A I L N T S N O T E S : 1 ) N O P R U N I N G S H A L L B E P E R F O R M E D E X C E P T B Y A N A P P R O V E D A R B O R I S T 2 ) N O E Q U I P M E N T S H A L L O P E R A T E I N S I D E T H E P R O T E C T I V E F E N C I N G I N C L U D I N G D U R I N G F E N C E I N S T A L L A T I O N A N D R E M O V A L . 3 ) D E T A I L M O D I F I E D F R O M U R B A N T R E E F O U N D A T I O N T R E E P R O T E C T I O N F E N C E : H I G H D E N S I T Y P O L Y E T H Y L E N E F E N C I N G W I T H 3 . 5 " X 1 . 5 " O P E N I N G S ; C O L O R - O R A N G E . S T E E L P O S T S I N S T A L L E D A T 8 ' O . C . 2 " x 6 ' S T E E L P O S T S O R A P P R O V E D E Q U A L M A I N T A I N E X I S T I N G G R A D E W I T H T H E T R E E P R O T E C T I O N F E N C E U N L E S S O T H E R W I S E I N D I C A T E D O N T H E P L A N S © 2 0 1 4 8 . 5 " X 1 1 " O R L A R G E R S I G N , L A M I N A T E D I N P L A S T I C A N D S P A C E D E V E R Y 5 0 ' A L O N G T H E F E N C E 4' C R O W N D R I P L I N E O R O T H E R L I M I T O F T R E E P R O T E C T I O N A R E A 8L201SPLIT RAIL FENCE DETAIL 1/2"=1'-0"NOTE:1)POSTS AND RAILS TO BE CEDAR OR OTHER DECAYRESISTANT/TREATED WOOD2)LINE POSTS DO NOT REQUIRE CONCRETE FOOTINGS.GATE, CORNER OR END POSTS DO REQUIRE CONCRETEFOOTINGS.4 X 4 POSTGROUND LEVEL 2 X 6 RAILING10'-0" O.C.4'-0"6"1'-2"8"4 X 4 POST2 X 6 RAILINGCONCRETE FOOTINGTO FROST DEPTHAGGREGATE BASE 1'-2"SECTION 1'-0" L a n d s c a p e D e t a i l s L 2 0 1 0 9 / 0 2 / 2 1 C i t y S u b m i t t a l D a t e I s s u e 3 0 8 4 T h o r p e R o a d B e l g r a d e , M o n t a n a 5 9 7 1 4 P h 4 0 6 . 9 2 4 . 8 0 3 8 c h a d @ r e d b a r n m o n t a n a . c o m Project For: The Flooring Place Addition 1891 Boot Hill Court Bozeman, MT 0 9 / 1 7 / 2 1 C i t y S u b m i t t a l