Loading...
HomeMy WebLinkAbout002_ExistingConditionsAndDemo60300SCALE:1" = 60'60120NORTHNOTE:-EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THEENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BESTRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS.-ALL IMPROVEMENTS SHALL BE PERFORMED IN ACCORDANCE WITH MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS 6TH EDITION, APRIL, 2010, AND THE CITY OFBOZEMAN STANDARD MODIFICATIONS, DATED MARCH 31, 2011, WITH ADDENDUM.-UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED INTHE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES ASARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED.FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION AND MULTI-USE PATHWAYS EXISTING CONDITIONS & PHASE 1 DEMOLITION PLAN GLEN LAKE ROTARY PARK NEW ACCESS ROADWAY, PARKING IMPROVEMENTS BOZEMAN, MONTANAC2.1- 17055_DEMO_PROD_PHI.DWG CMK 10.19.21 2ND CITY SUBMITTAL 01.24.22 - - - - - 3RD CITY SUBMITTAL - - - - - -- 17055 V:\17055_East_Gallatin_Rec_Area_Access_Road_Parking_Trail\CADD_C3D\PRODUCTION_DWG\SITE PLAN SUBMITTAL\17055_DEMO_PROD_PHI.dwg, C2.1, 1/21/2022 9:58:14 AM, rboland, 1:1