Loading...
HomeMy WebLinkAbout010 Roof Plans 27A1234567ABCDEF--a3.21a3.22a3.1210" / 12"10" / 12"10" / 12"10" / 12"3" / 12"10" / 12"10" / 12"3" / 12"2" / 12"3" / 12"3" / 12"3" / 12"DRAWN BY:SCALE:PROJECT:pobox 2016 Bozeman, MT 59771(406)531.9671 millerdesignbuild@gmail.comDATE:PROJECT NOREVISION DATEFOR COORDINATION1/4" = 1'-0"a1.4SMRoof PlanLOT 28 B1410 S. 3rd AveBozeman, MT 5971502222-14-20220210181/4" = 1'-0"1Roof PlanROOF PLAN NOTES1. ALL ROOF PENETRATIONS TO BE AVOIDED WITHIN FRONT FACADE.2. PAINT ALL ROOF PENETRATIONS TO MATCH ROOF.3. INSTALL ICE & WATER SHIELD W/ AT ALL EDGES AND VALLEYS W/ 36"ROLLS IN CONJUCTION WITH SYNTHETIC ROOF UNDERLAYMENT4. INSTALL ALL ROOFING PER MFG. INSTRUCTIONS.5. PROVIDE METAL CAP FLASHING ON TOP OF EXPOSED BEAM ENDSEXPOSED TO WEATHER.6. INSTALL GUTTERS W/ SLOPE OF 1/16" PER FOOT.7. INSTALL CONTINUOUS RIDGE VENT AT ALL TRUSSED OPEN ATTICROOF RIDGES FROM EXTERIOR WALL TO EXTERIOR WALL ORINSTERSECTING ROOF RIDGES/8. INSTALL EAVE VENTS ALONG ALL EXTERIOR WALLS ADJACENT TOVENTED ATTIC SPACES.ROOF VENTILATION REQUIREMENTS1. ATTIC SPACE HAS NO VAPOR BARRIER - UTILIZE 1:150 RULE FOR NETFREE VENTILATION AREA (NFVA) REQUIRED.2 ATTIC SPACE TO BE VENTED W/ RIDGE VENT. SEE MFG FOR QTY.REQUIRED3 EAVE SOFFIT VENTING PER MFG. QTY.4 INSTALL SIDEWALL VENTING WHERE REQUIRED.