Loading...
HomeMy WebLinkAboutAS-200OverallElevationsEXTERIOR MATERIAL LEGEND METAL PANEL PRECAST 002 BRICK VENEER OVER PRECAST PRECAST 001 CORTEN PANEL ARCH CONCRETE CORTEN OVER PRECAST ARCH STEEL, PAINTED BLACK LEVEL 1 100' -0" LEVEL 2 113' -0" T.O. LOW WALL 129' -0" 10 11 13 14 15 16 17 18 T.O. STL 127' -2" 12 10.5 11.5 12.5 13.5 14.5 15.5 16.5 17.5 TYP. 1' - 0"1' - 6"1' - 6"1' - 10"14' - 2"13' - 0"LEVEL 1 100' -0" LEVEL 2 113' -0" T.O. LOW WALL 129' -0" H G F E T.O. STL 127' -2" E.3E.6F.3F.6G.3G.6 TYP. 1' - 0"1' - 10"14' - 2"13' - 0"LEVEL 1 100' -0" LEVEL 2 113' -0" T.O. LOW WALL 129' -0" 1415161718 T.O. CLERESTORY 134' -0" T.O. STL 127' -2" T.O. STL (HI) 132' -0" 13.514.515.516.517.5 1' - 6" TYP. 1' - 0"1' - 6" LEVEL 1 100' -0" LEVEL 2 113' -0" 123456789 T.O. CLERESTORY 134' -0" T.O. STL (HI) 132' -0" 1.52.53.54.55.56.57.5 8.28.6 4' - 0"LEVEL 1 100' -0" A LEVEL 2 113' -0" T.O. LOW WALL 129' -0" BCD T.O. STL 127' -2" A.3A.6B.3B.6C.3C.6 C.5 LEVEL 1 100' -0" LEVEL 2 113' -0" T.O. LOW WALL 129' -0" 1 2 3 4 5 6 7 8 9 T.O. CLERESTORY 134' -0" 1.5 2.5 3.5 4.5 5.5 6.5 7.5 8.2 8.6 ELECTRICAL ENCLOSURE LEVEL 1 100' -0" LEVEL 2 113' -0" T.O. LOW WALL 129' -0" HGFE T.O. CLERESTORY 134' -0" T.O. STL 127' -2" T.O. STL (HI) 132' -0" E.3 E.6 F.3 F.6 G.3 G.6 PROJ. NO. DATE: © DRUMBEAT SCALE: SHEET NUMBER SHEET TITLE: ISSUED FOR: 650 South 500 West Salt Lake City, UT 84101 www.drumbeat.us www.qfactorsolutions.com 7/22/2021 12:35:04 PMBIM 360://Industry Bozeman/20400_Industry Bozeman_A19_Central.rvtAs indicatedTECHNOLOGY BLVDBOZEMAN, MT 5971820400.00 2021-0715 SITE PLAN CD SET OVERALL ELEVATIONS AS-200 INDUSTRY BOZEMAN 1/16" = 1'-0"1 OVERALL SOUTHWEST ELEVATION 1/16" = 1'-0"2 OVERALL SOUTHEAST ELEVATION 1/16" = 1'-0"3 OVERALL NORTHEAST ELEVATION 1/16" = 1'-0"4 OVERALL EAST ELEVATION 1/16" = 1'-0"5 OVERALL NORTH ELEVATION 1/16" = 1'-0"6 OVERALL WEST ELEVATION 1/16" = 1'-0"7 OVERALL NORTHWEST ELEVATION 1AS-2002 AS-200 7 AS-200 6AS-200 4 AS-2005AS-2003AS-2007/21/2021