Loading...
HomeMy WebLinkAboutL105 Landscape Notes_Parkview Crossing _21-05-06GENERAL NOTES1.ALL LANDSCAPED AREAS SHALL HAVE PERMANENT UNDERGROUND. IRRIGATION INSTALLED TO ENSURE A HEALTHY LANDSCAPE. SEE IRRIGATION NOTES.2.ALL AREAS DISTURBED BY CONSTRUCTION TO BE SEEDED OR PLANTED ANDMAINTAINED.3.ALL EDGING SHALL BE METAL (PRO EDGE-STEEL/ALUMINUM).4.ALL TREES SHALL BE STAKED WITH WOOD STAKES (MIN OF 2 PER TREE) ANYTREE OR SHRUB PLANTED THAT IS NOT IN A SHRUB BED SHALL HAVE A 3' DIAM. 4" DEPTH ORGANIC MULCH RING AT THE BASE.5.CONTRACTOR TO VERIFY LOCATION OF ALL UTILITIES PRIOR TO INSTALLATION,EXCAVATION, OR PLANTING.6.NO TREE SHALL BE PLANTED WITHIN 10' OF ANY FIRE HYDRANT, SEWER ORWATER LINE.7.ALL STREET TREES SHALL BE APPROVED BY CITY FORESTER AND PLANTEDSLIGHTLY HIGHER THAN GRADE AND WITH THE TREE COLLAR EXPOSED. THE HOLEEXCAVATED SHALL BE TWICE THE SIZE OF THE POT OR ROOT BALL OF THE TREE.8.ALL PLANTS SHALL BE GUARANTEED FOR ONE YEAR AFTER PROJECT COMPLETION.9.ALL LAWN AREAS SHALL BE LOCALLY GROWN SOD.10.ALL SOD AREAS TO HAVE 4-6" MINIMUM TOPSOIL DEPTH TO PROMOTE PLANTGROWTH.11.ALL OTHER DISTURBED AREAS ON SITE SHALL BE RE-GRADED ROCK HOUNDEDAND SEEDED TO MATCH DISTURBED AREA EXISTING LANDSCAPE.12.SEEDED GRASS AREAS ARE TO BE FINANCIALLY GUARANTEED FOR 2 YEARS BYOWNER OR CONTRACTOR. TEMPORARY IRRIGATION FOR ESTABLISHMENT ISHIGHLY RECOMMENDED.13.NO PLANT SUBSTITUTIONS WITHOUT WRITTEN APPROVAL FROM THE OWNER ANDLANDSCAPE DESIGNER.14.CONTRACTOR TO VERIFY ALL PLANT QUANTITIES. IF THERE IS A DISCREPANCYBETWEEN PLANT TABLE AND PLAN, THE PLAN SHALL DICTATE QUANTITY.15.ALL GROUND MOUNTED MECHANICAL NOT SHOWN ON PLAN SHALL BE HARDSCREENED WITH FENCE OR SIDING MATERIAL. IRRIGATION GENERAL NOTES1.THIS IRRIGATION PLAN IS CONCEPTUAL IN NATURE AND FINAL DESIGN SHALL BEVERIFIED BY IRRIGATION CONTRACTOR. IRRIGATION SYSTEM TO BEDESIGN/BUILD BY A PROFESSIONAL IRRIGATION CONTRACTOR PER THEREQUIREMENTS BELOW.2.A BACKFLOW PREVENTER SHALL BE PROFESSIONALLY INSTALLED AS PER THECITY OF BOZEMAN REQUIREMENTS.3.A PRESSURE RELEASE VALVE/REGULATOR MAY BE NEEDED DEPENDING ON THE PSI AT POINT OF CONNECTION.4.IRRIGATION POC WILL BE CONNECTED TO CITY SERVICE.5.IRRIGATION DESIGN ASSUMES 25-28GPM FROM WATER SOURCE.6.CARE SHALL BE TAKEN TO ENSURE IRRIGATION SYSTEM IS INSTALLEDPROPERLY TO MINIMIZE/ELIMINATE WATER WASTE DUE TO OVER SPRAY ONTOWALKS AND PARKING LOTS.7.IRRIGATION CONTRACTOR SHALL INSTALL A RAINBIRD (OR SIMILAR) RAINSENSOR THAT WILL AUTOMATICALLY TURN OFF THE SYSTEM DURING RAINEVENTS.8.POWER SOURCE TO BE PROVIDED FOR IRRIGATION CONTROLLER ANDCOORDINATED WITH ELECTRICAL. CONTROLLER SHALL BE WEATHERBASED-RAINBIRD ESP-Me SERIES CONTROLLER WITH WR2 WEATHER SENSORAND LNK WIFI MODULE.9.ALL TURF AREAS ARE TO BE SPRAY OR ROTOR IRRIGATED. MPR NOZZLES (MULTI-TRAJECTORY OR MULTI-STREAM ROTARY) OR SIMILAR SHALL BE INSTALLED IN LAWN AREAS WHERE FEASIBLE TO MAXIMIZE EFFICIENCY. IRRIGATION SYSTEM TO BE INSTALLED WITH HEAD TO HEAD COVERAGE FOR ALL ROTOR AND SPRAY ZONES.IRRIGATION CALCULATIONS~THIS ESTIMATE ASSUMES THE SPRINKLER CONTROLLER IS PROGRAMMEDCORRECTLY AND ASSUMES A 3 TIME A WEEK IRRIGATION SCHEDULE~TOTAL ESTIMATED 31,822 GALLONS OF WATER PER MONTH (13,259 SF. TURFAREA) USED FOR ALL SPRAY/LAWN ZONES.TOTAL ESTIMATED WATER USAGE PER MONTH FOR LANDSCAPE: 31,822 GALLONSDOES NOT INCLUDE NATIVE SEED AREAS (TEMPORARY IRRIGATION)AVERAGE OF 4 MONTHS PER YEAR (JUNE-SEPTEMBER)NProject For: Parkview Crossing Vaquero Parkway Bozeman, MTNotesL1054/02/21For ReviewDate Issue3084 Thorpe RoadBelgrade, Montana 59714Ph 406.924.8038chad@redbarnmontana.com5/06/21City Submittal