Loading...
HomeMy WebLinkAboutC3.0 OVERALL WATER PLAN_04162021STSTSTSTSTSTSTST STSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTLOT 1LOT 2LOT 3LOT 4LOT 4LOT 6LOT 3LOT 10LOT 5LOT 1LOT 9LOT 7LOT 15LOT 11LOT 16LOT 12LOT 13LOT 14LOT 2LOT 8LOT 15LOT 13LOT 3LOT 11LOT 18LOT 4LOT 5LOT 1LOT 2LOT 14LOT 6LOT 17LOT 6LOT 3LOT 4LOT 2LOT 1LOT 5LOT 9LOT 12LOT 7LOT 8LOT 10LOT 168''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S 8''S 8''S 8''S 8''S 8''S 8''S 8''S 8''S 8''S8''S8''S8''S8''SSSSSSSSSS8''S8''S8''S8'' S SSS8''SSSGASGASGA SS8'' S 8'' S 8'' S 8'' S 8'' S 8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''WHYD8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''WHYDHYDHYD8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''WHYDHYD100+00101+00102+00 103+00104+00105+00106+00107+000+001+002+003+004+005+006+007+008+009+0010+001 1 + 0 0 1 2 + 0 0 1 3 + 0 0 1 4 + 0 0 1 4 + 4 8 4715471047104705HEC Apr 15, 2021 - 6:46pmCAD FILE: M:\193211\Drawings\Construction Drawings\C3.0 WATER.dwg REVISIONSDATEPROJECT NUMBERHYALITE Engineers, PLLC2304 N 7th Ave. Ste. LBozeman, MT 59715Tel: (406) 587.2781w w w . hyaliteeng. comFax: (406) 522.92252018PARKVIEW CROSSINGS BOZEMAN, MTCAMPECHE SHORES DEVELOPMENT, LLC04/16/2021193211CONSTRUCTION DRAWINGS - 22x34 originals INFRASTRUCTURE IMPROVEMENTSSCALESHEET TITLEDESIGN BYP.O. BOX 3088GALVESTON, TXAS NOTEDBV0'60'120'180'OVERALL WATER PLANC3.0CONNECT TO EXTG.8" WATER MAIN1.ALSO SEE NOTES ON SHEET G1.1.2.PROTECT IN PLACE ALL EXISTING UTILITIES UNLESS NOTED OTHERWISE. IF CONFLICT EXISTS,NOTIFY THE ENGINEER IMMEDIATELY.3.EXISTING VEGETATION OUTSIDE OF ROADWAY CUT FILL SLOPES MUST BE PROTECTED.EXISTING VEGETATION WITHIN THE NEW ROADWAY PRISM IS TO BE REMOVED AND DISPOSED OFBY THE CONTRACTOR.4.WHERE LOT DIMENSIONS ALLOW, WATER SERVICES ARE TO BE LOCATED AT THE CENTER OFTHE LOT (OTHERWISE LOCATED AS SHOWN). ALL WATER SERVICE SHALL END 8' INSIDE OF THEPROPERTY LINE.5.EACH PIPE JOINT MUST HAVE 3 BRASS OR BRONZE CONDUCTIVE WEDGES INSTALLED.6.JOINT DEFLECTION OF 8" DI PIPE IS ALLOWED UP TO 5°.GENERAL WATER NOTESCONNECT TO EXTG.8" WATER MAINPROPOSED 8"GATEVALVE (TYP.)PROPOSED FIREHYDRANT (TYP.)PROPOSED 1" WATERSERVICE (TYP.)LOOPALIGNMENTALLEYALIGNMENTTSCHACHE LANEVAQUERO PARKWAYROAD APROPOSED 8" CLASS 51 DUCTILEIRON WATER MAIN (TYP.)