Loading...
HomeMy WebLinkAboutStormWaterMaintenancePlan_12012020STORM WATER MAINTENANCE PLAN Lots 4 & 5, Block 5, Flanders Creek Subdivision Oak & Cottonwood Apartments City of Bozeman, Montana PROPERTY OWNER'S ASSOCIATION RESPONSIBILITIES FOR ROUTINE INSPECTION AND MAINTENANCE: 1. Routine Maintenance Activities (1-3 month interval) • Designate no cut zones in the bottom of basins • Remove trash, leaves, grass clippings and debris • Establish a chemical free zone in and around the basin • Inspect for uniform ponding, and that water disappears within three days of rain events 2. Annual Maintenance Activities (Annually) • Cut vegetation to 6” and remove clippings • Re-establish vegetation on eroded and barren areas • Remove excess sediment build-up • Update maintenance plan and inspection log 3. Long Term Maintenance Activities (5-10 year interval) • Consult a qualified professional to inspect and return storm water basin back to initial design found on the subdivision and/or site plan engineering plans. • Dredge basin if sediment buildup is greater than 6” • Re-establish vegetation \20006\Storm Water Maintenance Plan.Doc