Loading...
HomeMy WebLinkAbout10_ADUElevations_08-20-21c Date:mobile #:phone #:Project No.Drawn by:Date:Scale:GENERAL CONTRACTOR:Revised by: Drafting & Design, Inc.B19-0109-1-3McLay Project - SummerHome330 NO. ROUSEBOZEMAN, MONTANACHRIS MCLAY608-774-2678Tract 2D. Johnston 28 Jan 19 D. Johnston 04 Feb 19 These drawings are licensed for ONE USE ONLY. D. Johnston 16 Jan 19 D. Johnston 25 Jan 19 D. Johnston 08 Mar 19IMPACTDRAFTING & DESIGN, incwww.impactdrafting.com2021 Brentwood Professional Center1195 Stoneridge Dr., Suite 3DBozeman, MT. 59718406-522-5382All rights reserved. All designs, drawings, ideas, and written material contained or described herein are the sole property of IMPACT Drafting & Design Inc. and as such may not be altered, duplicated, used or disclosed without written consent from IMPACT Drafting & Design Inc.scale is correct ifprinted on D-Size paperby IMPACT DraftingNote: IMPACT Drafting & Design Inc. is not responsible for engineering orconstruction. Individual contractors are responsible for meeting codes.IMPACT D. Johnston 03 Apr 19 D. Johnston 16 Sep 20CONTACT/OWNER10 131/4" = 1'Elevations All Views scale: 1/4" = 1'scale: 1/4" = 1' scale: 1/4" = 1'scale: 1/4" = 1' ADU Front Elevation ADU Right Elevation ADU Left ElevationADU Back Elevation Elevations - General Notes Flashing required at the following locations: ·exterior window and door openings ·intersection of chimneys or other masonry with frame walls ·under and at the ends of masonry, wood or metal copings and sills ·continuously above all projecting wood trim ·where exterior porches, decks, or stairs attach to wood framing ·at wall and roof intersections ·at built-in gutters Revised by:Date: Additional Revisions D. Johnston 14 Jul 21 D. Johnston 20 Aug 21 D. Johnston 20 Aug 21 D. Johnston 20 Aug 21 D. Johnston 20 Aug 21