Loading...
HomeMy WebLinkAboutA300ExteriorElevations_06242021FIRST FLOOR 0' -0" T.O.W. FIRST 10' -11 3/8" T.O. ROOF 36' -0 1/8" SECOND FLOOR 12' -0" T.O.W. SECOND 21' -1 1/8" ABCDE T.O.W. CUPOLA 37' -10 1/8" 1 A600 T.O. FDN. -0' -2 1/4" 2 A6001 A601 WOOD RAINSCREEN (WEATHERED CEDAR) W6X20 WIDE FLANGE COL. (BLACK) 1x4 WINDOW TRIM (WHITE) LAP SIDING (ARCTIC WHITE) FLANGED WINDOW UNIT (BLACK) COPING CAP (BLACK) LARGE HORIZ. RIB METAL SIDING (OLD ZINC GRAY) CONT. RIDGE VENT (BRONZE) STANDING SEAM METAL ROOFING (BRONZE) 4 12 1x8 FASCIA (ROLEX BLACK) SMALL VERT. RIB METAL SIDING (BRONZE) 1x8 FASCIA (BLACK) T.O. PARAPET 2 27' -3" ILLUMINATED SIGN 36.5 S.F. SIGN ACCENT LIGHTING WALL PACK, TYP.C8x11.5 HEADER (BLACK) INSUL. H.M. DOOR (BRONZE) STOREFRONT WINDOW UNIT (BLACK) LOUVER (BRONZE)2 1/4"10' - 11 3/8"1' - 0 5/8"9' - 1 1/8"6' - 1 7/8"8' - 9 1/8"1' - 10"C G C C G E E D 103 C E E H H H H 102 101 100 W6X20 WIDE FLANGE COL. (BLACK) W6X20 WIDE FLANGE COL. (BLACK) W6X20 WIDE FLANGE COL. (BLACK) GUTTER & DOWNSPOUT (BRONZE) GUTTER & DOWNSPOUT (BRONZE) 3 A300 FIRST FLOOR 0' -0" T.O.W. FIRST 10' -11 3/8" T.O. ROOF 36' -0 1/8" SECOND FLOOR 12' -0" T.O.W. SECOND 21' -1 1/8" T.O. PARAPET 24' -0 1/8" T.O. LOWER PARAPET 14' -0" 12345 3 A600 T.O.W. CUPOLA 37' -10 1/8" T.O. FDN. -0' -2 1/4" A B B 117 AA 209 208 T.O.W. OFFICE 9' -8"1' - 10"12' - 0"2' - 11"9' - 1 1/8"1' - 0 5/8"10' - 11 3/8"2 1/4"T.O. PARAPET 2 27' -3" W6X20 WIDE FLANGE COL. (BLACK) WOOD RAINSCREEN (WEATHERED CEDAR) FLANGED WINDOW UNIT (BLACK) VERT. T&G SIDING (WEATHERED CEDAR) FLANGED WINDOW UNIT (BLACK) COPING CAP (BLACK) LARGE HORIZ. RIB METAL SIDING (OLD ZINC GRAY) CONT. RIDGE VENT (CHARCOAL) ROLLEX FASCIA (BLACK) ILLUMINATED SIGN 36.5 S.F. SIGN ACCENT LIGHTING ARCHITECTURAL ASPHALT SHINGLES (CHARCOAL) LAP SIDING (ARCTIC WHITE) 12 12 12 12 I I I CHARCOAL SHINGLES WEATHERED CEDAR -CLEARCOAT BLACK ARCTIC WHITE 24 GA. CORRUGATED METAL SIDING (BRONZE) 24 GA. HORIZ. RIB METAL SIDING (OLD ZINC GRAY) ALONG PRINCE LANE TOTAL FACADE:3,573 S.F. TOTAL TRANS.: 538 S.F. PERCENT TRANS.15% ALONG NELSON ROAD TOTAL FACADE:1,848 S.F. TOTAL TRANS.: 271 S.F. PERCENT TRANS.:15% TRANSPARENCY CALCULATIONS BUILDING FRONTAGE SIGNAGE NOTES: NORTH & SOUTH 144' STREET FRONTAGE EAST & WEST 68' STREET FRONTAGE MAXIMUM SIGNAGE AREA 250 S.F. 139.5 S.F. TOTAL BUILDING SIGNAGE NOT TO EXCEED 250 S.F. PER M-1 ZONING SEE CITY OF BOZEMAN UDO CHAPTER 38.560 EXTERIOR FINISH, SEE ELEVATIONS WOOD FRAMING, SEE STRUCTURAL METAL TRANSITION BETWEEN SIDING MATERIAL CHANGE WRB SYSTEM INTERIOR EXTERIOR 6" STATUS: JOB NO.: CHECKED: DRAWN: Copyright © 2021 NELSON RD., BOZEMAN, MT4/14/2021 JDS JDS 20-023 - A300AMBIENT AIRSOLUTIONSEXTERIOR ELEVATIONS 1/8" = 1'-0"A300 1 NORTH ELEVATION 1/8" = 1'-0"A300 2 EAST ELEVATION EXTERIOR FINISHES 1 1/2" = 1'-0"A300 3 SIDING MATERIAL TRANSITION 1 REVISION SCHEDULENO:DESCRIPTION:DATE:BY:1DRC REVISION06-28-2021TH