Loading...
HomeMy WebLinkAboutElevations_6.25.21MAIN LEVEL PLAN 0" UPPER LEVEL PLAN 10’ − 5 7/8" MAIN T.O.W. 9’ − 1 1/8" UPPER T.O.W. 18’ − 7" GRG T.O.FTG −3’ − 6 5/8" 121.21.31.41.5 1 2 1x6 MIRATEK CORNER TRIM 1X12 MIRATEK 6" HARID LAP SIDING (5" REVEAL) METAL RAILING 1.2 1.3 1.4 1.5 B C 1X8 MIRATEK FACIA 1X4 MIRATEK SHADOW FACIA RS FIR KNEE BRACES 1x4 MIRATEK TRIM A MAIN LEVEL PLAN 0" UPPER LEVEL PLAN 10’ − 5 7/8"MAIN T.O.W. 9’ − 1 1/8" UPPER T.O.W. 18’ − 7" GRG T.O.FTG −3’ − 6 5/8" BC A REV:PROJECT NAME:ADDRESS:OWNER:LEGAL:A2.01 ELEVATIONS431 NORTH GRANDOBER RESIDENCE − GARAGE/ADU ADDITION REVISED ROOFTRAVIS OBERLOT 5 & 6, BLOCK 7 OF BEALL’S 3RD ADDITION5−5−2021 1/4" = 1’−0"1 NORTH ELEVATION 1/4" = 1’−0"2 SOUTH ELEVATION 1/4" = 1’−0"3 WEST ELEVATION 1/4" = 1’−0"4 EAST ELEVATION