Loading...
HomeMy WebLinkAboutES101ElectricalSitePlan_06092021H Y D H Y D H Y D H Y D PCS S WS O T CS S I S D D P ### ############ ### ### ### CO CO S S S CO CO GP CO ### ### ### ### ### ######PPPPP S S S S SSSSS SS S SSSSSS SSSSSSSSS PPP P R O Y A L W O L F W A YP R I N C E L A N EP R I N C E L A N E 1 3 2 5 wmwmwmwm8" di8" di8" di1 6 " di 16" di 16" di16" di16" di16" distst stss ssJJLE5 11' LE6 18' LE6 18' LE5 11' LE6 18' LE5 11' LE5 11' LE6 18' LE6 18' LE6 18' LE5 11' LE6 18' LE6 18' LE6 18' LE5 11' LE6 18' LE6 18' LE5 11' LE5 11' LE5 11' LE6 18' LE6 18' LE6 18' LE6 18' LE6 18' LE6 18' LE5 11' LE1-TFTM 25' LE1-TFTM 25' LE1-T2M-P8 25' LE1-TFTM 25' LE1-T2M-P8 25' LE1-TFTM 25' LE1-T5M 25' LE1-TFTM 25' LE1-T5M 25' LE6 18' HP1-12 HP1-14 LP1-12 LP1-14 LE6 18' 1 2 5 3 4 6 7 7 7 8 8 9 10 LP1-53 GENERAL NOTES A. COMPLY WITH LATEST ADOPTED NEC AND APPLICABLE CODES/STANDARDS. B. SHARED NEUTRALS ARE NOT ALLOWED FOR SINGLE PHASE BRANCH CIRCUITS. C. COORDINATE WITH OTHER TRADES TO SHARE TRENCHING AS PRACTICAL. D. COORDINATE WITH GENERAL CONTRACTOR AND OTHER TRADES FOR EXISTING UTILITIES PRIOR TO ROUGH-IN TRENCHING. VERIFY USE OF UTILITY LOCATION SERVICES. E. SEE SHEET 2/E504 FOR SITE LIGHTING POLE BASE DETAILS. F. PROVIDE SITE LIGHTING CONTROL FOR DIMMABLE BUILDING MOUNTED LIGHTING BETWEEN HOURS OF 11PM AND 6AM PER LOCAL BUILDNG DEVELOPMENT CODE. BUILDING MOUNTED LIGHTING SHALL COME TO FULL BRIGHTNESS UPON ACTIVATION SITE LIGHITNG MOTION CONTROL. #KEYNOTES NOT FOR CONSTRUCTION - PRELIMINARY DESIGN REVISIONS 6/9/2021 1:42:27 PM SITE PLAN ES101 5.14.2021 © 2020 | ALL RIGHTS RESERVED 100% PERMIT SET DESIGNED BY | PSM DRAWN BY | PSM PARCEL DISTRIBUTION FACILITYUPS BOZEMAN, MONTANA | Project# UPS_BOZEMAN | L:\UPS_BOZEMAN\BIMCAD\Revit 1" = 40'-0"ES101 1 ELECTRICAL SITE PLAN NORTH REF 1 NEW WP/GFI RECEPTACLES FOR ENGINE BLOCK HEATERS. SEE BLOCK HEATER DETAILS, 3/E600, 5/E600 FOR MOUNTING INFORMATION. TYPICAL OF (2) DEVICES. 2 NEW MAIN SERVICE DISCONNECT, CT METER CAN & MANUAL TRANSFER SWITCH WITH GENERATOR LEFT HAND MOUNTED FEMALE CAM LOK RECEPTACLES. SEE ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION. 3 NEW UNDERGROUND 4" CONDUITS TO BE ROUTED BETWEEN COMMUNICATION AND TELEPHONE SERVICE ENTRY PEDESTALS. ROUTE UNDERGROUND INTO BUILDING AND ROUTE VERTICALLY UP INTERIOR WALL. PROVIDE NEW 24"X24"X12" PULL BOX AT 18' AFF AND CONTINUE ROUTE TO TERMINATE INTO SERVER ROOM. SEE ENLARGED SERVER ROOM SHEET 2/E402, 2/T402 FOR ADDITIONAL LOCATION INFORMATION. 4 PROVIDE POWER CONNECTION TO NEW LED ILLUMINATED BUILDING MOUNTED SIGNAGE. COORDINATE EXACT POWER LOCATION WITH SIGNAGE PROVIDER AND ARCHITECTURAL ELEVATIONS PRIOR TO ROUGH-IN. BACK BOX ELECTRICAL CONNECTION SHALL BE INSTALLED WITHIN 5 FEET OF CENTER OF SIGN. SIGNAGE CIRCUIT SHALL ROUTE THROUGH EXTERIOR LIGHTING CONTACTOR. COORDINATE EXACT CONNECTION LOCATION AND REQUIREMENTS WITH SIGN PROVIDER PRIOR TO ROUGH-IN. 5 NEW UTILITY TRANSFORMER. COORDINATE EXACT LOCATION AND PRIMARY ROUTING WITH CIVIL CONTRACTOR AND UTILITY PRIOR TO COMMENCING ROUGH-IN. COORDINATE WITH UTILITY TO PROVIDE NECESSARY PRIMARY CONDUIT RACEWAY, TRANSFORMER VAULT, AND PAD. 6 NEW 6" UNDERGROUND PRIMARY CONDUIT FOR USE BY UTILITY FOR FEED TO UTILITY TRANSFORMER. COORDINATE EXACT ROUTING WITH UTILITY PRIOR TO ROUGH-IN. 7 ALL NEW SITE LIGHT POLES SHALL BE SET BACK APPROXIMATELY 10' FROM EDGE OF PAVEMENT. COORDINATE EXACT PAVING EXTENTS WITH CIVIL. 8 TERMINATE END OF SITE LIGHTING RUN THROUGH INGRADE PULL-BOX ADJACENT TO POLE BASE FOR FUTURE EXPANSION. 9 PROVIDE #8CU CONDUCTORS FOR VOLTAGE DROP IN 1"C TO ALL SITE LIGHTING. 10 PROVIDE POWER CONNECTION TO LANDSCAPE IRRIGATION CONTROLLER. COORDINATE EXACT LOCATION AND ROUGH-IN REQUIREMENTS PRIOR TO ROUGH-IN. SITE PLAN SUBMITTAL 04.21.2021 1 06.09.2021 SITE PLAN 01 1