Loading...
HomeMy WebLinkAboutC202EnlargedGrading_060920211324511CC### ### ### ### ### ### ######### ### ### ### ### ###XX###GASGASGASGASGASGASGASGASGASGAS11YELLOWSTONE MEMORIAL LLCPARCEL 1 & 2, & TRACT C - CERTIFICATE OF SURVEY 2581 NELSON ROAD LLC - TRACT 1A - CERTIFICATE OF SURVEY 1372A30' DEDICATED ROW - NELSON MEADOWS SUBDIVISION(R-682.82')N0°39'01"E 682.68'357.73' (R-357.85')LOT 1ABLOCK 6NELSON MEADOWS SUBDIVISION9.282 Ac.404,304 Ft²## # ## # ## # ## # ## # ## # ## # ## # ## #XXXXXXXXXXXXXXXXXXXX## #STS T 459 3 45 9 2 45914590458945904590459 0 45 9 5 4588 4588 458 9 4589 4591 45 9 1 45 9 2 459345 9 3 45 9 3 45 9 4 TC 92.91TC 93.49TC 92.91-13.7%4595 45 9 5 45 9 2 45 9 2 45 9 3 45 9 3 45 9 4 4594 4596 4597 4598 459145914591 45924592 45924593 -1.0%-1.0%TC 93.194599 4590 4595 458 8 4589 4591 4592 4593 4594 4596 4596 -5:1-5:1-5:1-5:120.00PUE3.00 MINSIDESETBACK3.00 MINREARSETBACK10.00PUE25.00PUBLIC TRAILEASEMENTTBC 93.65TBC 93.34TBC 93.34TBC 93.49TBC 93.61TC 93.50TC 93.85TBC 93.97TBC 95.04TBC 95.69TC 93.61TC 93.97TC 92.83TBC 93.29TC 94.41TC 93.49FG 96.50FG 99.10-2.5%-2.4%-0 . 7 %-0.7%-2.4%BOT. OF POND 87.30PROPOSED BUILDING35,100 SFFFE = 4596.00-2.0% -2.0% -1.7%TC 95.91TC 95.91TC 95.95TC 95.95TC 95.84TC 95.78TC 95.84TC 95.77TC 96.00TC 96.005.003.673.33DRAWN BY |REVISIONS©| ALL RIGHTS RESERVEDCHECKED BY |®PARCEL DISTRIBUTION FACILITY UPS BOZEMAN, MONTANASITE PLAN SUBMITTAL04.21.20212021Know what'sbelow.Callbefore you dig.6/9/2021 11:08 AM | L:\UPS_BOZEMAN\BIMCAD\Civil\UPS_BZMN_C201-C203.dwgC202ENLARGEDGRADING &DRAINAGE PLANSCHLEGEL1 06.09.2021 SITE PLAN 01WHITE1C202ENLARGED GRADING & DRAINAGE PLANNORTH0102040SCALE: 1" = 20'FRONTAGE ROADROYAL WOLF WAY P R I N C E L A N EKEY PLANNORTHFLOW LINE TO PONDSTORMWATER RETENTION /DETENTION POND (10YR/2HR)DRYWELLSTRUCTURE.RIM = 4587.80SEE DETAIL 2/C404.NORTH051020SCALE: 1" = 10'2C202GRADING DETAIL-012C202FLOW LINE TO PONDTAPER CURBFULL HEIGHTTO FLUSHOVER 2LF1