Loading...
HomeMy WebLinkAboutA702EnlargedPlan_06092021FFFF101112GE2272 SFAUTO SHOP110111-24110-1W6W5W5W2W28 5/8"56'-0 5/8"1 3/4"110-2110-3110-46A312______________A8021432HOT WATER HEATER, SEE PLUMBINGWATER COOLER, SEE PLUMBINGEYE WASH STATION, SEE PLUMBINGAIR DRYERELECTRICAL PANEL, SEE ELECTDISCONNECT SWITCH, SEE ELECTRICAL AIR COMPRESSORGEAR LUBEELECTRICAL PANEL, SEE ELECTELECTRICAL TRANSFORMER, SEE ELECTSOLVENTCHASSIS GREASE275 GAL FRESH OIL TANKTIRE RACK/TANK SUPPORT275 GAL WASTE OIL TANKMECHANICAL DUCT, SEE MECHANICALWASTE OIL SINKFLOOR TRENCH DRAIN, SEE PLUMBFE-BFE-AFE-BW6W8402 ft²FIRE RISER109103 ft²MANAGEROFFICE107167 ft²CONFERENCE106109-13A304______________W3W2W3SIM1 HRW6W6W6W4W4W51 HR1 HR1 HR1 HR30"x48" MINIMUM CLEARANCE FOR ELECTRICAL EQUIPMENT, TYP.SCREENING, SEE SHEET A3153'-3" OPENSCREENING, SEE SHEET A3154'-0" MIN CLR4"SLOPE 1%SLOPE 1%SLOPE 1%SLOPE 1%8'-9"33'-2 1/2"CLOVERHEAD REEL(2) AIR(1) FRESH OIL(1) CHASSIS GREASE(1) GEAR LUBETRANSMISSION FLUID11'-5"39'-0"5'-1"CLCONDENSING UNITS, SEE MECHANICALGAS METER, SEE PLUMBING135'-3"1NOT FOR CONSTRUCTION - PRELIMINARY DESIGNREVISIONS6/9/2021 12:59:35 PMENLARGED PLANSA70205-14-2021© 2020 | ALL RIGHTS RESERVED100% CONSTRUCTIONDOCUMENTSDESIGNED BY | DesignerDRAWN BY | SMITHPARCEL DISTRIBUTION FACILITYUPS BOZEMAN, MONTANA | Project# UPS_BOZEMAN | L:\UPS_BOZEMAN\BIMCAD\Revit1/4" = 1'-0"A7021ENLARGED FIRST FLOOR PLAN - AUTO SHOP AND FIRE RISER ROOMNORTH REF1 06.09.2021 SITE PLAN 011SITE PLAN SUBMITTAL04.21.2021