Loading...
HomeMy WebLinkAboutA316Details_06092021METAL PANEL CLOSURE TRIM, COLOR MATCHED TO ASSOCIATED METAL PANEL, TYPMP1 (HORIZONTAL)MP3 (VERTICAL)SEALANT AND BACKER RODMETAL PANEL CLOSURE TRIM, COLOR MATCHED TO ASSOCIATED METAL PANEL, TYPMP1 (HORIZONTAL)MP1 (VERTICAL)SEALANT AND BACKER RODMETAL PANEL CLOSURE TRIM, COLOR MATCHED TO ASSOCIATED METAL PANEL, TYPMP2 (HORIZONTAL)MP2 (VERTICAL)SEALANT AND BACKER RODMETAL PANEL CLOSURE TRIM, COLOR MATCHED TO ASSOCIATED METAL PANEL, TYPMP2 (VERTICAL)MP3 (VERTICAL)SEALANT AND BACKER RODLAP WEATHER TAPE OVER FLASHINGPREFINISHED SHEET METAL FLASHING WITH DRIP EDGE, MATCH COLOR OF ADJACENT UPPER MPMP2 (VERTICAL)MP1 (HORIZONTAL)SEALANT AND BACKER RODMP2 (HORIZONTAL)MP1 (VERTICAL)PREFINISHED SHEET METAL FLASHING WITH DRIP EDGE, MATCH COLOR OF ADJACENT UPPER MPSEALANT AND BACKER RODMP1 (VERTICAL)MP2 (HORIZONTAL)PREFINISHED SHEET METAL FLASHING WITH DRIP EDGE, MATCH COLOR OF ADJACENT UPPER MPSEALANT AND BACKER RODNOT FOR CONSTRUCTION - PRELIMINARY DESIGNREVISIONS6/9/2021 12:04:24 PMDETAILSA31605-14-2021© 2020 | ALL RIGHTS RESERVED100% CONSTRUCTIONDOCUMENTSDESIGNED BY | DesignerDRAWN BY | AuthorPARCEL DISTRIBUTION FACILITYUPS BOZEMAN, MONTANA | Project# UPS_BOZEMAN | L:\UPS_BOZEMAN\BIMCAD\Revit1 06.09.2021 SITE PLAN 011 1/2" = 1'-0"A3161MP1 HORIZ TO MP3 VERT TRANSITION - PLAN1 1/2" = 1'-0"A3162MP1 VERT TO MP1 HORIZ TRANSITION - PLAN1 1/2" = 1'-0"A3163MP2 VERT TO MP2 HORIZ TRANSITION - PLAN1 1/2" = 1'-0"A3164MP2 VERT TO MP3 VERT TRANSITION - PLAN1 1/2" = 1'-0"A3165MP1 HORIZ TO MP2 VERT TRANSITION - SECTION1 1/2" = 1'-0"A3166MP1 VERT TO MP2 HORIZ TRANSITION - SECTION1 1/2" = 1'-0"A3167MP2 HORIZ TO MP1 VERT TRANSITION - SECTION1SITE PLAN SUBMITTAL04.21.2021