HomeMy WebLinkAbout20 - Design Report - Bridger View PUD - Sewer Engineering Report Sewer Main Extension Bridger View PUD October 2020 Submitted to: City of Bozeman Engineering Department 20 East Olive Bozeman, MT 59715 Prepared by: Stahly Engineering and Associates 851 Bridger Drive, Suite 1 Bozeman, MT 59715 (406) 522-8594 Sewer Mains 1 10/7/2020 Engineering Report Contents Note: The Engineering Report format follows DEQ-2 organization. Additional information required by the City of Bozeman Design Standards is added where required. Report Narrative Chapter 10 – Engineering Reports & Facility Plans 11.1 Engineering Report - General Information 11.11 Problem Defined 11.12 Design Conditions 11.13 Impact on Existing Wastewater Facilities 11.14 Project Description 11.15 Drawings 11.16 Design Criteria 11.17 Site Information 11.18 Alternate Selection/Analysis 11.19 Environmental Impacts Figures and Tables Figure 1. Vicinity Map Figure 2. Sewer Plan Table 1. BVR Sewer Flow Estimates Table 2. Capacity of 8” SDR 35 PVC Sewer Main Sewer Mains 2 10/7/2020 11.1 Engineering Report – General Information The proposed Bridger View Planned Unit Development (PUD) is located southwest of the intersection of Bridger Drive (MT 86) and Story Mill Road. Bridger View PUD is a 62-home neighborhood consisting of modest homes with a compact, urban design. This project is located on approximately 8 acres which was formerly occupied by 40 mobile homes within the Bridger View Trailer Park. The Bridger View Trailer Park was connected to the City’s sewer system via private sewer mains, which have been disconnected and abandoned. The proposed individual lots are compact with small yards and common open space. Houses will be constructed by the developer (HRDC) and range in size from 1, 2, and 3 bedrooms roughly proportioned at 25%, 50% and 25% respectively. The subdivision will create 52 residential single- household lots and 5 duplex lots. A common house is also proposed for community functions. Five common garages are proposed which will not have water or sewer facilities. The project will be served by extension of City of Bozeman water and sewer mains throughout the project. Individual service lines will be provided to each residential lot and the common house. City of Bozeman water and sewer mains currently exist along Bridger Drive to the north of the project. The previous water and sewer lines serving the trailer park do not meet City standards and will be abandoned during construction. The trailer park water supply wells in the northern portion of the site will be used for irrigation of the project. The developer’s contact information is: HRDC Heather Grenier 32 South Tracy Ave. Bozeman, MT 59715 Water supply and wastewater treatment will be provided by the City of Bozeman’s municipal systems. The system owner’s contact information is: City of Bozeman Public Service Department PO Box 1230 Bozeman, MT 59771-1230 The location of the Bridger View PUD site is shown on the Vicinity Map in Figure 1. Sewer Mains 3 10/7/2020 Figure 1. Vicinity Map, Bozeman, Montana 11.11 Problem Defined Sanitary sewer service will be provided by an existing 15” sewer main running in an easement through the northern portion of the site. The easement was provided by the Trust for Public Lands, the previous landowner, to allow the City to construct this master planned trunk sewer which will serve future development to the south and east. The easement was located within the property to protect the existing mature spruce trees along Bridger Drive. Lots adjacent to this sewer main (10 homes) can be served by new services installed on this main. Other lots will be served by new 8” sewer main extensions from the 15” main. The proposed sewer system improvements are shown on the Sewer Plan (Figure 2) at the end of this report. New sewer mains will be in sewer and/or water and sewer easements and street rights-of-way running through the property. Where water and sewer are running together, the easements are 30’ wide. Where sewer mains run individually, a 20’ easement is proposed. These 20’ easements are narrower than City standards but are located adjacent to common open space with a public access easement, which can provide additional access to the sewer main. A deviation from the City standard is requested for the 20’ wide sewer main easements. This deviation allows trees to be planted in the common open space just outside of the easement. No trees are Sewer Mains 4 10/7/2020 proposed within the water and sewer easements, or within 10’ of water and sewer mains. Each lot will have an individual 4” sewer service from the main to the front of the structure, except for the homes served by new services on the existing main which are served from the rear. Due to the small lot size, a deviation is requested to have 5’ separation between water and sewer services and between services and trees. This deviation will allow for the trees to be planted in the front yards of the lots and in common open spaces. Without this deviation, very few trees could be planted on lots and in common open spaces. To avoid conflicts with water and sewer services, power and communication lines are typically run in easements at the rear of the lots. 11.12 Design Conditions Sanitary sewer service will be provided by the City of Bozeman Municipal system. This project is located within the planned service area of the City’s system. Estimated wastewater generation for the Bridger View PUD has been determined utilizing values provided in City design standards and Facility Plans and is shown in Table 1. Due to the small, efficiently designed homes, and the irrigation by wells, the water use is anticipated to be lower than typical. However, for sewer main sizing, typical City design flows are utilized. The estimated residential wastewater generation is based on the City of Bozeman design standards. Typical design flow is 89 gallons per day (gpd) per capita, with an average population of 2.11 people per home. In accordance with DEQ-2 a peaking factor of 4.2:1 was used to determine the peak hour flow rate. For design purposes the common house was estimated to have the same wastewater generation as a typical home, for a total of 63 users. The estimated total project design flow is 11,831 gpd with a peak flow of 35 gallons per minute (gpm). It is likely that adjacent upgradient property to the south will be served by extension of the Bridger View PUD sewer mains. This adjacent property is within the City but continues to use its original septic systems that pre-dated annexation. It is estimated that approximately 3.1 acres of additional area will be served by sewers running through the Bridger View PUD. Of this, approximately 1.2 acres is zoned B-1, and approximately 1.9 acres is zoned R4. Using City of Bozeman design standard allocation rates, it is estimated that this adjacent property will contribute approximately 5,000 gpd to Bridger View sewers. Sewer Mains 5 10/7/2020 In accordance with City design standards, infiltration and inflow of 150 gpd/acre is added to the domestic wastewater generation. The total design flow from the Bridger View PUD and adjacent property wastewater generations with infiltration and inflow is approximately 18,467 gpd, with a peak hour flow of 53.5 gpm. Table 1 Bridger View PUD Sewer Flow Estimates On-site Residential #Units Capita / Unit Gpd/Capita Gallons/day Housing Unit 63* 2.11 89.0 11,831 Offsite added areas Area (acres) Gal / Acre / Day Offsite Zone B1 1.20 1000.00 1,200 Offsite Zone R4 1.93 1950.00 3,764 Total Domestic Use (gpd) 16,794 Sewer Infiltration & Inflow Area (acres) Infiltration (gal/ac) Gallons/day On-site 8.02 150.00 1,203 Off-site 3.13 150.00 4,670 Total Sewer Design Flow (gpm) 18,467 Average Day Demand (gpm) 12.8 Peaking Factor 4.2 Peak Hour Flow (gpm) 53.5 *Includes Common House An 8” sewer main at minimum slope (0.4%) has sufficient capacity to provide sewer service for Bridger View PUD and adjacent property at the estimated flow of 53.5 gpm. Table 2 shows that an 8” main has a 75% flow depth capacity of 313 gpm installed at a minimum slope of 0.4%. Table 2 Capacity of 8" SDR 35 PVC Sewer Main Status Proposed Location Bridger View Pipe Material 8” SDR 35 PVC Pipe Diameter (in) 8 Minimum Pipe Slope (ft/ft) 0.004 Coefficient of Roughness (n) 0.013 Depth in Pipe at 75% Full (in) 6 Depth of Flow (ft) 0.5 Pipe Radius (in) 4 Pipe Radius (ft) 0.33 Wetted Perimeter 1.40 Area of Flow (ft2) 0.28 Hydraulic Radius 0.20 Velocity (ft/sec) 2.48 Maximum Pipe Flowrate (gpm) 313 Peak Flow % of 75% Max Capacity 17% Sewer Mains 6 10/7/2020 11.13 Impact on Existing Wastewater Facilities The existing 15” sewer providing service to Bridger View PUD was recently installed in an easement provided by the previous landowner, the Trust for Public Lands, and has no capacity limitations. This sewer is planned to provide service to future development along Bridger Drive well into the future. A review of the City of Bozeman 2015 Wastewater Facility Plan identifies future capacity limitations in the collection system downstream of this project impacting a large portion of Bozeman. This limitation is not directly caused by this project and upgrades to this interceptor sewer are currently planned for FY 2023 in the City’s Capital Improvements Plan. 11.14 Project Description The project description is provided at the beginning of the Engineering Report. 11.15 Drawings Please see Figure 2, the Sewer Plan, at the end of this report which shows the proposed sewer improvements. Plan and profile drawings will be submitted with the infrastructure design submittals. 11.16 Design Criteria The Bridger View PUD sewer main extensions will be designed in accordance with Montana Department of Environmental Quality Circular 2, and the City of Bozeman Design Standards and Specifications Policy. Construction specifications will be Montana Public Works Standards and Specifications (MPWSS), and the City of Bozeman Modifications to MPWSS. 11.17 Site Information The Bridger View PUD site is located on the former site of the Bridger View Trailer Park. The trailer park was served by private sewer mains connected to the City system and with a privately-owned, on-site water supply. The existing sewer mains and water lines will be abandoned with site construction. Sewer Mains 7 10/7/2020 The trailer park had some minor cut/fill grading to establish level trailer sites; but previous site work did not significantly impact the soils since the mobile homes did not have foundations. Beyond the minor site grading, the soils are typical of the Bozeman area. A geotechnical evaluation was conducted and is provided in a separate appendix of the submittal. The soils can generally be described as a deep topsoil overlaying a fine-grained subsoil, with gravelly sand material at a depth of approximately 8 feet. Because basements are proposed for the new homes, groundwater monitoring was conducted throughout the summer of 2019. Monitoring results are provided with the geotechnical report. Groundwater depths were generally greater than 10 feet and should not impact homes or utilities. The underlying gravelly sand material will provide a suitable foundation material for pipes and basements. The site is not located within a 100-year floodplain. 11.18 Alternative Selection/ Analysis Due to the project’s location within the City of Bozeman, extension of public mains was the only sewer collection alternative. 11.19 Environmental Impacts Continued use and new extensions of City of Bozeman municipal sewer mains has the least environmental impact. No new environmental impacts will be caused by these sewer main extensions. PHASE 1PHASE 3PHASE 1PHASE 2PHASE 1PHASE 2PHASE 2PHASE 3STORY MILLSPUR TRAILSTORY MILL COMMUNITY PARKCITY OFBOZEMANPROPERTYSTORY MILL ROAD (60' ROW & 30' ESMT)BRIDGER DRIVE (Aka Hwy 86) - (110' ROW)HILLSIDE LANE(60' ESMT)HILLSIDE LANE (64' ROW)FLOURHOUSECOURTMILLWORKSCOURTLOT 56LOT 53LOT 49LOT 46LOT 21LOT 40LOT 35LOT 23LOT 13LOT 26LOT 27LOT 4LOT 16LOT 19LOT 47LOT 12LOT 44LOT 43LOT 39LOT 22LOT 38LOT 31LOT 33LOT 42LOT 2LOT 41LOT 37LOT 10LOT 9LOT 32LOT 29LOT 30LOT 5LOT 7LOT 8LOT 52LOT 55LOT 57LOT 54LOT 51LOT 50LOT 48LOT 45LOT 17LOT 25LOT 14LOT 15LOT 11LOT 20LOT 24LOT 36LOT 34LOT 1LOT 6LOT 3LOT 28HILLSIDE GREENHILLSIDE GROVEPHASE 2PHASE 3BLOCK 1BLOCK 2BLOCK 3BLOCK 4PATH TO THE "M"PARKSIDE WALKMILLWORKS ROW FLOURHOUSE WAY (30' ROW)BLUE SILOS WAY (30' ROW)BLUE SILOSCOURTMILLWORKS WAY (30' ROW)ADDITIONAL ROW 1976 SFLOT 18LOTC-1LOTC-2LOTC-4LOTC-5LOTC-3LOTC-6OS 1OS 5OS 6OS 3OS 4OS 7OS 7OS 8OS 7C3.0SEWER PLANPROFESSIONALENGINEERS &SURVEYORSBRIDGER VIEW STAHLYENGINEERING& ASSOCIATESHRDC BOZEMAN MONTANA